Question

In: Statistics and Probability

Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...

Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST=10,740; SSTR=4,540

a. Set up the ANOVA table for this problem (to 2 decimals, if necessary).

Source of Variation Sum of Squares Degrees of Freedom Mean Square F p-value (to 4 decimals)
Treatments
Error
Total

b.Use a= .05 to test for any significant difference in the means for the three assembly methods.

Calculate the value of the test statistic (to 2 decimals).

The p-value is - Select your answer -less than .01between .01 and .025between .025 and .05between .05 and .10greater than .10Item 12

What is your conclusion?

Solutions

Expert Solution


Related Solutions

Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST is 10, 760 SSTR...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST is 10, 760 SSTR...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST = 10,780; SSTR =...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 27 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 9 workers. The number of units assembled correctly was recorded, and the ANOVA was performed on the resulting data set. The following results were obtained: SST = 10,400; SSTR = 4,700. State the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 15 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 5 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. What is the rejection region for the ANOVA test using...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 36 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 12 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST = 12,960; SSTR =...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST = 10,840; SSTR =...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method, 30 employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by 10 workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained: SST = 10,790; SSTR =...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the...
Three different methods for assembling a product were proposed by an industrial engineer. To investigate the number of units assembled correctly with each method,  employees were randomly selected and randomly assigned to the three proposed methods in such a way that each method was used by  workers. The number of units assembled correctly was recorded, and the analysis of variance procedure was applied to the resulting data set. The following results were obtained:; .SST= 10,780; SSTR= 4,520 a. Set up the ANOVA...
An environmental engineer wants to evaluate three different methods for disposing of nonhazardous chemical waste: land...
An environmental engineer wants to evaluate three different methods for disposing of nonhazardous chemical waste: land application, fluidized-bed incineration, and private disposal contract. Use the estimates below to help her determine which has the least cost at i = 8% per year on the basis of an annual worth evaluation. Land Incineration Contract First Cost $-140,000 $-700,000 0 AOC per Year $-85,000 $-40,000 $-130,000 Salvage Value $20,000 $250,000 0 Life 4 years 6 years 2 years The environmental engineer selects...