Question

In: Civil Engineering

Construct an AoA network for the 'Project Infiltration', and explain how the activities,events and symbols are...

Construct an AoA network for the 'Project Infiltration', and explain how the activities,events and symbols are applied.

Identify and briefly different techniques which you have considered to use in order to draw the AoN network for 'Project Infiltration'.

Calculate the total duration of 'Project Infiltration'. Calculate the different forward and backward passes.

Calculate the float/slack of 'Project Infiltration'. Explain the critical path of 'Project Infiltration', and ensure that the reader understands the importance of the critical
path.

Solutions

Expert Solution


Related Solutions

Consider the project described in the below Excel a. Construct an Activity-on-Node network for the project....
Consider the project described in the below Excel a. Construct an Activity-on-Node network for the project. b. Determine the critical path using the expected time for each activity (you can use Excel), and the expected project duration. c. What is the probability that the project will be finished in 3 weeks? In 4 weeks? Time estimates (days) Activity Predecessor a m b a -- 1 3 5 b -- 2 3 5 c -- 2 4 7 d a 1...
Explain how the critical path of a network is identified? What are critical path activities and...
Explain how the critical path of a network is identified? What are critical path activities and why are they important?
Prepare a project plan for 'Project Infiltration' by illustrating the logical sequence developing of a Project...
Prepare a project plan for 'Project Infiltration' by illustrating the logical sequence developing of a Project Plan. Make use of a diagram to illustrate the Project Plan. Using the information in the Case Study, compile a WBS (work breakdown structure) for all the tasks included in 'Project Infiltration'. Draw a bar chart to suit the tasks for 'Project Infiltration'. Explain the characteristics of the bar chart, and briefly discuss the shortcomings of a bar chart. Discuss the shortcomings of 'Project...
Construct the following network(AOA) and determine the minimum total cost to complete the project if indirect...
Construct the following network(AOA) and determine the minimum total cost to complete the project if indirect cost is Rs.1500 per day. Activity NT CT NC CC 1-2 6 4 6000 7800 1-3 7 4 3000 4200 2-3 4 1 5000 9200 2-5 6 5 6000 7500 3-4 7 3 2000 6800 4-5 3 1 2000 4000 4-6 7 3 4000 5600 5-6 5 4 3000 4100
Which of the following events/activities would be included in this year’s GDP? Explain briefly in each...
Which of the following events/activities would be included in this year’s GDP? Explain briefly in each case where does it show up both of the expenditure side and on the income side. (c) You prune the trees of your front yard. (d) You hire a tree service to prune the trees in your front yard. (f) An American graduate student grades your homework (grading assistants are ASU employees).
Consider the following activity-on-arc project network, wherethe 12 arcs (arrows) represent the 12 activities (tasks)...
Consider the following activity-on-arc project network, where the 12 arcs (arrows) represent the 12 activities (tasks) that must be performed to complete the project and the network displays the order in which the activities need to be performed. The number next to each arc (arrow) is the time required for the corresponding activity. Consider the problem of finding the longest path (the largest total time) through this network from start (node 1) to finish (node 9), since the longest path...
Construct a Bayesian Network that functions as a Naïve Bayes Classifier.
Construct a Bayesian Network that functions as a Naïve Bayes Classifier. The naïve assumption lies on the fact that values of attributes are independent conditional on the decision variable. Keep this in mind while creating the network. The construction should include a graph (diagram of the network) and then the conditional probability distribution for the variables.
explain the events that begin and end the story. how do these events relate to one...
explain the events that begin and end the story. how do these events relate to one another, and what do we then learn about how faulkner has constructed this plot?
Explain the logic used to determine which activity to reduce on a Project Network based on...
Explain the logic used to determine which activity to reduce on a Project Network based on the cost slope and other relevant information.
Explain how macroeconomic events such as inflation, recession, and high interest rates; and political events such...
Explain how macroeconomic events such as inflation, recession, and high interest rates; and political events such as Brexit can impact your investment plans and outcomes. Provide supporting data   
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT