Question

In: Civil Engineering

Determine the 25-year flow for a 200 square mile watershed in Region 10 of Arizona, which...

  1. Determine the 25-year flow for a 200 square mile watershed in Region 10 of Arizona, which has annual precipitation of 15 inches per year. Comment on its accuracy, that is what are the upper and lower error estimates in terms of cubic feet per second.

  1. Determine the 5-year flow for a 25 square mile watershed in Region 14 of Arizona at an elevation of 5000 feet. Comment on its accuracy, that is what are the upper and lower error estimates in terms of cubic feet per second.

  1. Determine the 100-year flow of a 70 square mile watershed in Region 12 of Arizona at an elevation of 3500 feet. Comment on its accuracy, that is what are the upper and lower error estimates in terms of cubic feet per second.

Solutions

Expert Solution


Related Solutions

Determine the 25-year flow for a 200 square mile watershed in Region 10 of Arizona, which...
Determine the 25-year flow for a 200 square mile watershed in Region 10 of Arizona, which has annual precipitation of 15 inches per year. Comment on its accuracy, that is what are the upper and lower error estimates in terms of cubic feet per second. Determine the 5-year flow for a 25 square mile watershed in Region 14 of Arizona at an elevation of 5000 feet. Comment on its accuracy, that is what are the upper and lower error estimates...
Question 1. Determine the future worth in year 10 of a cash flow series that starts...
Question 1. Determine the future worth in year 10 of a cash flow series that starts in year 0 (today) at $25,000 and decreases by 6% per year (through year 10). Use an interest rate of 6%. Question 2. Person opens a savings account today. In year 1, she deposited $5,000. She made no deposits in year 2 and 3 and then deposit $2,000 each for years 4 trough 6. Given an interest rate of 4%, how much would she...
Determine the IRR of the following cashflow. Invest wisely! MARR=10% Year $ 0 -1000 1 200...
Determine the IRR of the following cashflow. Invest wisely! MARR=10% Year $ 0 -1000 1 200 2 -180 3 -180 4 -180 5 500 6 -180 7 -180 8 500
10 cm of copper with square cross section of 1x1 cm exposed to 200 KN tension...
10 cm of copper with square cross section of 1x1 cm exposed to 200 KN tension force caused 15% permanent reduction in cross section area , if the fracture got on this point, calculate the following: 1 – the ductility 2 – stress 3 – true stress 4- fracture stress
Five Year Discounted Cash Flow,Property is 5,000 square feet,Rent is $20 per square foot and increases...
Five Year Discounted Cash Flow,Property is 5,000 square feet,Rent is $20 per square foot and increases $2 per annum,Vacancy and Collection is 5% of PGI,Real Estate Taxes are $20,000 in year 1 and increase 5% per annum,Operating Expenses are $25,000 in year 1 and increases $1 per square foot per annum,Management is 5% of EGI, Discount Rate is 11%,Capitalization Rate is 9%,Calculate the NPV.
Determine the limiting values of the width a of a waveguide of square cross section which...
Determine the limiting values of the width a of a waveguide of square cross section which will transmit a wave of length lambda in the TE10 mode but not in the TE11 or TM11 modes.
A lease on Times Square will pay $1,000,000 annually (starting in one year) for 25 years...
A lease on Times Square will pay $1,000,000 annually (starting in one year) for 25 years at a growth rate of 2%. Similar properties are discounted at a 5% rate. What is the value today (present value) of this growing annuity cash flow stream? (round to the nearest dollar)
Let Px = $10 per unit, Py = $25 per unit and B = $200. Draw...
Let Px = $10 per unit, Py = $25 per unit and B = $200. Draw the budget line using these data. Explain the concepts of total utility, marginal utility and the Law of Diminishing Marginal Utility.
What is the present value of the following planned cash flow for a 25 year power...
What is the present value of the following planned cash flow for a 25 year power plant project? Assume that the annual cost of money is 4.2%. Draw the cash flow diagram and present your solution. Initial Investment (construction costs) - $60,000,000 Annual operating costs - $750,000 Annual maintenance costs - $95,000 Projected decommissioning expenses – $13,000,000 Projected income from scrap - $350,000
Investiment opportuity as folows: Year 0, unknown cash flow, Year 1 = 200 cash flos,,Year 2...
Investiment opportuity as folows: Year 0, unknown cash flow, Year 1 = 200 cash flos,,Year 2 = 400 cash flow, Year 3 = -100 cash flow, year 4= 500 cash flow, Year 5 = 200 cash flow a. If other investments with comparble risk are earning 12% then how mudh shoud you be willing to pay for this investment? If you purchace it for 800 then what is the anual rate of retun on the investment?
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT