Q. During a major storm seawater has entered the cable conduit for a tidal power station....

Q. During a major storm seawater has entered the cable conduit for a tidal power station. The seawater may have damaged the insulation greatly increasing the likelihood of a short circuit. The power company needs to decide whether or not to replace the cables in the conduit. If there is a short circuit then the whole conduit will be seriously damaged and need to be reconstructed. The cost of replacing the cables is $30 000. The cost of replacing the complete conduit is $500 000. If the cable is not replaced the probability of a short circuit occurring is estimated to be 0.1. If it is replaced this drop to 0.000 01. It is possible to send a remote camera through the conduit to inspect the cable at a cost of $5 000. This inspection is not 100% accurate in detecting damage and so P(The inspection detects damage | A short circuit will occur) = 0.9 P(The inspection detects damage | A short circuit will not occur) = 0.05 a) Draw the decision tree for this situation. b) Determine the remaining required probabilities and mark clearly on your tree. c) Determine the best course of action to follow.

Solutions

Expert Solution

Inspection is the best way to manage this situation.

Do give positive rating,thankyou.


Related Solutions

Cable Corp. has entered into a transaction with Land Corp. Cable Corp will give its equipment...
Cable Corp. has entered into a transaction with Land Corp. Cable Corp will give its equipment to Land Corp. in exchange for Land’s equipment. Cable Corp will also pay Land Corp $30,000 cash. Cable Corp’s equipment originally cost $160,000 when it was purchased 2 years ago and currently has $50,000 of accumulated depreciation and an estimated fair value of $122,000. The fair value of Land Corp’s equipment is determined to be $152,000. Required: Provide the journal entry to record this...
A tidal power plant of single-basin type, has a basin area of (24+n1000) km2. The tide...
A tidal power plant of single-basin type, has a basin area of (24+n1000) km2. The tide has a range of 10 m. The turbine stops when the head on it falls below 3m. Calcualte the average power generated during one filling/emptying proces in MW. Assume the turbine-generator efficiency is 70% and the time taken as 22350 seconds. Take sea water density = 1025 kg/m3. n=57
A C-band station has an antenna with a transponder gain of 54dB.The transmitter output power is...
A C-band station has an antenna with a transponder gain of 54dB.The transmitter output power is set to 100 W at a frequency of 6.10 GHz. The signal is received by a satellite at a distance of 37,500 km through an antenna with diameter of 6m. The signal is then routed to a transponder with a noise bandwidth of 36 MHz, and a gain of 110dB 1. Calculate the path loss. 2. Calculate power at the output port of the...
A group is considering installing a solar power station and has asked you for your recommendation...
A group is considering installing a solar power station and has asked you for your recommendation for a photovoltaic system or a solar thermal system. At this stage you are asked not to include cost factors. The single point design condition they have given you is for an incident solar radiation on the collector of 550 W/m2, a surrounding temperature of 18 C. The dead state for this problem should be taken as To = 291 K, Po = 1...
During 2009, Solar Power Inc. entered into an arrangement with Solutions Co to distribute its RHP-1...
During 2009, Solar Power Inc. entered into an arrangement with Solutions Co to distribute its RHP-1 product in all of Solutions retail stores. The contract specifies the following: a) Solutions Co will have some product on hand for demonstration purposes, which will be given at no cost; b) once the customer decides to make a purchase, Solutions will be required to remit to Solar Power Inc. on the date of invoice 85% of the sales proceeds, it may retain 15%....
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two...
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two 1000 MWe PWRs and are planning the fuel cycle for the next ten years. You are beginning negotiations with your fuel supplier, Verma Fuels, and must choose between the 3.3% enrichment fuel you have been using and a new 5% enrichment fuel.   Briefly discuss two financial considerations in making this decision.
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two...
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two 1000 MWe PWRs and are planning the fuel cycle for the next ten years. You are beginning negotiations with your fuel supplier, Verma Fuels, and must choose between the 3.3% enrichment fuel you have been using and a new 5% enrichment fuel.   -Compare the environmental consequences of use of the two different fuels – i.e., consider which might generate more or less waste.
: The US has just entered a major recession. Please describe what will happen as the...
: The US has just entered a major recession. Please describe what will happen as the US Government uses Expansionary Fiscal Policy to aid the economy. Assume that the marginal propensity to expend is 0.9 and therefore the multiplier is 10. According to the multiplier model, an increase in autonomous consumption of 200 would raise the equilibrium level of income by 2000. 1) Explain how the multiplier process amplifies the initial shift in autonomous expenditures. 2) Had the MPE only...
The song Baby Shark has taken the world by storm, including Dr. Link's living room during...
The song Baby Shark has taken the world by storm, including Dr. Link's living room during his kids' daily dance parties. In the song, the melody of three notes, D (293.5 Hz), E (329.5 Hz), and G (392 Hz) are played repeatedly. Dr. Link decides to surprise his girls by learning to play it on his daughter' s Ukulele (a small guitar) but he needs your help. To play the note, Dr. Link needs to determine the tension in the...
Waterloo North Hydro has two options for upgrading a geothermal power station to meet new government...
Waterloo North Hydro has two options for upgrading a geothermal power station to meet new government standards. Assume all interest is 4.19% compounded annually. Option 1 Waterloo North Hydro will make the upgrades themselves. This is expected to cost $46,700 per year from year 1 until the end in 21 years. At the end of the operation (in 21 years) Waterloo North Hydro expects to sell all equipment needed for the upgrade for $96,000. Option 2 Pay experienced contractors. This...