In: Statistics and Probability
The design team was charged with a Cp = 1.2, dual sided and Nominal of 8 mm for a designed part. Plant B: They measured 30 parts from the vendor and found the average was 8.2 mm and the standard deviation was 0.5mm. ii) Sketch the Standard Normal Distribution graph, with all relevant data labeled. iii) Specifications= 8 +/- ______________ iv) CPK = _____________________