Question

In: Civil Engineering

The ordinates of a hydrograph at a section of a stream having a drainage area of...

  1. The ordinates of a hydrograph at a section of a stream having a drainage area of 81 km2 are given below. Find the unit hydrograph assuming the base flow equal 18 m3/s.

Time hr

Discharge m3/s

0

18

1

42

2

193

3

338

4

383

5

328

6

248

7

183

8

123

9

78

10

48

11

28

12

18

Solutions

Expert Solution

Lets say you want a 'Y' hour unit hydrograph then,

Area of catchment=81 Km2

= 81x10002 =81000000 m2

Area under DRH=1794 x (Y hour) x 60x60=6458400Y m3

DRH depth =

Rainfall excess   = (6458400xY)/(81x1000x1000)

= 7.97333 x (Y) (centimetre )

Therefore, the ordinate of UH are obtained by dividing the ordinate of surface runoff hydrograph by rainfall excess 7.9733(Y) to get ordinates of UH.

Example- Obtaining unit hydrograph of 6Hr from this DRH

Y=6

Rainfall excess=7.97333x6=47.84

Data table-

6hr UH

similarily you can construct any hr duration UH


Related Solutions

The flow hydrograph ordinates observed in a basin with a precipitation area of 500 km2 for...
The flow hydrograph ordinates observed in a basin with a precipitation area of 500 km2 for a 3-hour showers are given in the table below. Assuming the base flow is constant and 10 m3/h; a) Calculate the total volume of flow as m3, which consists of precipitation. b) Calculate excess rainfall height and duration. c) Determine the unit hydrograph which is equal to the precipitation period of excess rainfall. (time is given a hour 10m3/h ) not false.. Time (h)...
The ordinates of a 6- hr unit hydrograph are given below. A storm had three successive...
The ordinates of a 6- hr unit hydrograph are given below. A storm had three successive 6 – hr intervals of rainfall magnitude of 3, 5, and 4 cm respectively. Assuming a Φ- index of 0.2 cm/hr and a base flow of 30 m3/s, determine the resulting hydrograph of flow (total flow). time, hr Ordinate of 6-h UH 0 0 6 250 12 600 18 800 24 700 30 600 36 450 42 320 48 200 54 100 60 50...
QUESTION 1 The daily stream flow data for a particular catchment having an area of 6500...
QUESTION 1 The daily stream flow data for a particular catchment having an area of 6500 km2 are given in the table below. Separate the baseflow using Straight line method, Fixed base method, and recession Separation method. Calculate the total direct runoff for each method. Table Q1 Time Flows, Q (days) (m3/s) 1 1 600 2 1 550 3 5 000 4 10 300 5 8 600 6 6 500 7 5 000 8 3 800 9 2 800 10...
QUESTION 5 If the flow hydrograph as listed in the Table Q5 passes through a stream...
QUESTION 5 If the flow hydrograph as listed in the Table Q5 passes through a stream reach from A to B, for which K = 8.0 hr and x = 0.3 Determine the peak outflow discharge at B. At t=0, the outflow discharge is 40 m3/s Based on the inflow and outflow hydrograph, discuss the time lag required for the peak flood to reach the downstream area. Comment on the attenuation achieved. Table Q5 Time (hr) 0 6 12 18...
The ordinates of rainfall mass curve of a storm over a basin of area 850 km2...
The ordinates of rainfall mass curve of a storm over a basin of area 850 km2 measured in mm at 1 hour intervals are 0, 10, 22, 30, 39, 45.5, 50, 55.5, 60, 64 and 68. If the infiltration during this storm can be represented by horton’s equation with fo=6.5 mm/hr, fc=1.5 mm/hr and k=0.15 /hr. Estimate the resulting runoff volume.
A 105-acre rural drainage area, located in the Eastern Panhandle of WV, consists of three different...
A 105-acre rural drainage area, located in the Eastern Panhandle of WV, consists of three different watershed areas as follows: (Use the Rational Method) Pavement = 50%, earth shoulder = 30% and grass shoulder = 20%, assume 1% slope If the time of concentration for the drainage area is 30 minutes, determine the peak runoff rate (Q) for a storm of 10 yr frequency. Submit the following answers: Time of concentration (TC) = Rainfall intensity (i) = Runoff Coefficient (C)...
The distance and depth values measured in various slices in a stream section and the measurement...
The distance and depth values measured in various slices in a stream section and the measurement times and rotation numbers in a muline with coefficients a = 0.15 and b= 0.08 are given below. a. Calculate the area, average velocity, and flow rate of each slice as well as the total area and average velocity of the entire cross section. b. When measuring with another muline, it was measured as n = 22 when V = 1.94 m/s and n...
Consider a 10x108 m3 lake fed by a polluted stream having a flow rate of 2.0...
Consider a 10x108 m3 lake fed by a polluted stream having a flow rate of 2.0 m3 /s and pollutant concentration equal to 10.0 mg/L. There is also a sewage outfall that discharges 0.5 m3 /s of wastewater that has a pollutant concentration of 100 mg/L into the lake. The stream and sewage pollutants have a decay rate coefficient of 0.20 day-1 (first order). Under these flow conditions the lake remains the same volume (e.g. a stream enters and exits...
a. Prove the Archimedes result that the area of a section of a parabola equals times...
a. Prove the Archimedes result that the area of a section of a parabola equals times the area of the inscribed triangle of the same height. (You may use calculus here.) b. In what sense can one consider Archimedes to be the inventor of calculus? c. Find at least five axioms equivalent to the parallel lines axiom. Give the dates when they were proposed and the person that proposed them.
There are 180 primary schools in a country area having an average of 30 or more...
There are 180 primary schools in a country area having an average of 30 or more people under the age of 21 per class. A sample of 30 schools drawn using systematic sampling with an interval of k = 6. Serial number 1 2 3 4 5 6    7 8 9 10 No. of students 60 200 45 50 40 79 35 41 30 120 Serial number 11 12 13 14 15 16 17 18 19 20 No. of...