Question

In: Finance

CASE STUDY: Building a Wind powered electrical generating plant Background Integration of wind generation into a...

CASE STUDY: Building a Wind powered electrical generating plant Background Integration of wind generation into a wholesale power supply portfolio requires a proper balance between the operating characteristics of base load generation, power purchase agreement flexibility and cost of service objectives. Purchasing or generating wind power has an associated expense that must be addressed as the wholesale power supplier meets its obligation to supply a reliable, affordable and balanced supply of wholesale electric energy and related services to its member systems. The integration of wind generation into a power supply portfolio can be challenging and the “all in” costs associated with this resource must be objectively considered in order to accurately reflect the contribution this resource will make to supply portfolio pricing. Results of a Feasibility Study A feasibility study was carried out to see what the costs and consequences would be of building the Wind powered electrical generating plant. Basic data on anticipated costs and benefits are provided in Table A and B respectively. Table A Year -> 1 2 3 4 5 6 7 8 9 10 Initial capital costs 300 600 500 Cost of operations 40 42 50 46 52 61 59 Anticipated maintenance 25 42 35 41 27 29 31 Other costs 80 80 65 40 44 24 15 16 19 18 TOTAL 380 680 565 105 128 109 102 95 109 108 Table B Year -> 1 2 3 4 5 6 7 8 9 10 Income to Cooperative 45 101 122 135 136 175 201 220 Secondary income generation effects 85 119 122 163 201 305 412 415 453 487 TOTAL 85 119 167 264 323 440 548 590 654 707 1. What is the undiscounted Benefit/Cost of the project? 2. If this project could be financed at a rate of 10%, could it be economically justified? Why? 3. What is the Net Present Value of this project using a discount rate of 10%? 4. In what year does this project break even? Is this timeframe acceptable? Why?

Solutions

Expert Solution


Related Solutions

2- Find world data for total installed electrical generating capacity data and installed wind generation capacity...
2- Find world data for total installed electrical generating capacity data and installed wind generation capacity for years between 2000 and the most recent year for which data are available. What are the actual annual growth rates for this period?
A currently-owned shredder for use in a refuse-powered electrical generating plant has a present net realizable...
A currently-owned shredder for use in a refuse-powered electrical generating plant has a present net realizable value of $200,000 and is expected to have a market value of $10,000 after 4 years. The shredder was purchased for $500,000 10 years ago. Operating and maintenance disbursements are $100,000 per year. An equivalent shredder can be leased for $200 per day plus $80 per hour of actual use as determined by an hour meter, with both components assumed to be paid at...
CASE study Electricity Generation Case study 8.1: Electricity generation Electricity Generation Here and now Distributed power...
CASE study Electricity Generation Case study 8.1: Electricity generation Electricity Generation Here and now Distributed power generation will end the long-distancetyranny of the grid. For decades, control over energy has been deemed too important to be left to the markets. Politicians and officials have been dazzled by the economies of scale promised by ever bigger power plants, constructed a long way from consumers. They have put up with the low efficiency of those plants, and the environmental harm they do,...
A power company operates three power generation plants. One is a wind plant, and the other...
A power company operates three power generation plants. One is a wind plant, and the other two consume a combination of Fuel 1 and Fuel 2, emitting carbon dioxide in the process. In addition, all three plants require maintenance. The amount of fuel consumed (in Mg), maintenance required (in person-hours), carbon dioxide (CO2) emitted (in Mg), and power generated (in MWh) per day of operation is as follows: Maintenance Fuel 1 Fuel 2 CO2 Power Plant Required Required Required Emitted...
Consider the case of a power plant that, in the process of generating electricity, it also...
Consider the case of a power plant that, in the process of generating electricity, it also emits noxious pollutants. It has been argued that this situation represents a market failure. a. Briefly explain, using a graph, what are the economic foundations of this argument? b. Using the graph in (a) show what are the economic implications of this case c. What economic mechanism would you suggest to correct for this market failure? d. In general, why market forces, do not...
    2. Case Background Introduction:     The project company is ValueVehicle (VV), which is a hypothetical electrical vehicle...
    2. Case Background Introduction:     The project company is ValueVehicle (VV), which is a hypothetical electrical vehicle manufacturer. VV is a public listed company and is required to comply with all regulations from SEC and GAAP. Your group is the accounting department, and you are responsible for disclosing financial information to the SEC and the public.     (1) Company necessary financial information VV (formerly ValueVehicle, Inc.) is an American electric vehicle and clean energy company based in Fayetteville, North Carolina. VV's current...
CASE: Building a magical organization at Johnson and Johnson The typical pharmaceutical MNE emphasizes global integration,...
CASE: Building a magical organization at Johnson and Johnson The typical pharmaceutical MNE emphasizes global integration, given its steep product development costs and potential scale economies. However, it must respond to local market conditions, obtaining government approval for its product in various countries and establishing local sales, support, and distribution systems. Consequently, headquarters and subsidiaries jointly implement the company’s strategy. Building an organization that can meet this mission is tough. One standout that does is Johnson & Johnson (J&J). Since...
Case study background Assume that you are a graduate accountant working for Tucker and associates a...
Case study background Assume that you are a graduate accountant working for Tucker and associates a public accounting firm situated at 55 York Street, Sydney, NSW 2000. The manager of your firm, Mr Adam Tucker has asked you to draft a letter in response to an email received from a client – Joe Black, the managing director of Sotoma Pty Ltd, raising a few accounting issues regarding his company – see the copy of the email on the next page....
CASE STUDY:                RENEWABLE ENERGY SOURCES FOR ELECTRICITY GENERATION You developed an interest in the LEC...
CASE STUDY:                RENEWABLE ENERGY SOURCES FOR ELECTRICITY GENERATION You developed an interest in the LEC relation and the publicized cost of electricity of 10.27¢/kWh for this year. You wonder if the addition of 60 MW of wind-sourced electricity will make any difference in the LEC value for this next year. You did learn the following: This is year t = 11 for LEC computation purposes n = 25 years i = 5% per year E11 = 5.052 billion kWh...
Study the below case and answer the following questions: Rania is an Electrical Quality Assurance Engineer...
Study the below case and answer the following questions: Rania is an Electrical Quality Assurance Engineer at a large electrical company. she is responsible for the final testing of her company’s transformers and she is part of a team which decides when new the products will be shipped to distributors for sale. Rania’s company has a contract with another company which produces wires inside the transformers Rania’s company make. The transformers need to be shipped for the costumer by the...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT