Question

In: Civil Engineering

TRP 631: HIGHWAY TRAFFIC OPERATIONS An existing six-lane divided multilane highway with a field-measured free-flow speed...

TRP 631: HIGHWAY TRAFFIC OPERATIONS

An existing six-lane divided multilane highway with a field-measured free-flow speed of 45 mi/h serves a peak-hour volume of 4,000 veh/h with 10% trucks (50% SUT, 50% TT). The PHF is 0.88. The highway has generally rolling terrain. What is the likely level of service of this segment? Good weather, no incidents, no work zones, and regular drivers may be assumed.

Solutions

Expert Solution


Related Solutions

An existing 2-lane (in each direction) multilane divided highway. The speed limit is 50 mi/h, the...
An existing 2-lane (in each direction) multilane divided highway. The speed limit is 50 mi/h, the lanes are 11-ft wide and lateral clearance is 2-ft. The peak hour volume is 1,800 veh/h in one direction, there are 5% trucks, a PHF of 0.92, but 1 access point per mile. a) Determine the LOS during the peak hour. b) Compare your result with the freeway in situation 1.
TRP 631: HIGHWAY TRAFFIC OPERATIONS An older four-lane freeway has the following characteristics: 11 ft lanes...
TRP 631: HIGHWAY TRAFFIC OPERATIONS An older four-lane freeway has the following characteristics: 11 ft lanes No lateral clearance 4.5 ramps/mile 5% truck( standard mix) Peak-hour factor = 0.90 Rolling Terrain The present peak-hour demand on the facility is 2,100 veh/h, and anticipated growth is expected to be 3% per year. What is the present LOS? What is the expected LOS in 5 years? 10 years? 20 years?. To avoid breakdown (LOS F), when will substantial improvements be needed to...
Traffic on a three-lane freeway observes a triangular flow-density relationship with free-flow speed vf=100km/h, capacity c=2000veh/h/lane,...
Traffic on a three-lane freeway observes a triangular flow-density relationship with free-flow speed vf=100km/h, capacity c=2000veh/h/lane, jam density kj=150veh/km/lane. Flow in the freeway from upstream is 5000veh/h, while the ramp flow is negligible (almost zero).At 9:45am, an accident occurs at point A. The vehicles involved close one lane of traffic (total capacity reduces to 4000veh/h) for 15min and afterwards the scene is clear (capacity returns to 6000veh/h). Lucy enters the freeway via the ramp at point B at 10:00am. Distance...
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized. y=B0+B1x+e where y= traffic flow in vehicles per hour x= Vehicle speed in miles per hours    The following data were collected during rush hour for six highways leading out of the city. Traffic Flow () Vehicle Speed () 1255 35 1207 30 1365 50 1314 50 1247 35 1290 45 a. Develop an estimated regression equation for the data. The regression...
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized. y=b0+b1X+E where y= traffic flow of vehicles per hour X= vehicle speed in miles per hour The following data were collected during rush hour for six highways leading out of the city. Traffic flow(y) vehicle speed(X) 1169 30 1134 40 1162 30 1223 35 1166 25 1285 40 a) the following Regression equation y=___________+__________x (2 decimals) b) use a=0.05 significance s=________________ (4...
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized: y = β0 + β1x + ε where y = traffic flow in vehicles per hour x = vehicle speed in miles per hour. The following data were collected during rush hour for six highways leading out of the city. Traffic Flow (y) Vehicle Speed (x) 1,258 35 1,331 40 1,226 30 1,336 45 1,350 50 1,125 25 In working further with...
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized: y = β0 + β1x + ε where y = traffic flow in vehicles per hour x = vehicle speed in miles per hour. The following data were collected during rush hour for six highways leading out of the city. Traffic Flow (y) Vehicle Speed (x) 1,257 35 1,330 40 1,224 30 1,333 45 1,351 50 1,123 25 In working further with...
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized: y = β0 + β1x + ε where y = traffic flow in vehicles per hour x = vehicle speed in miles per hour. The following data were collected during rush hour for six highways leading out of the city. Traffic Flow (y) Vehicle Speed (x) 1,255 35 1,328 40 1,228 30 1,336 45 1,347 50 1,124 25 In working further with...
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized. where y=b0+b1x+b2x2 y=traffic flow in vehicles per hour x=vehicle speed in miles per hour The following data were collected during rush hour for six highways leading out of the city. Traffic Flow () Vehicle Speed () 1257 36 1329 45 1226 35 1335 45 1349 55 1125 25 a. Use the data to compute the coefficients of this estimated regression equation (to...
A highway department is studying the relationship between traffic flow and speed. The following model has...
A highway department is studying the relationship between traffic flow and speed. The following model has been hypothesized: y = β0 + β1x + ε where y = traffic flow in vehicles per hour x = vehicle speed in miles per hour. The following data were collected during rush hour for six highways leading out of the city. Traffic Flow (y) Vehicle Speed (x) 1,254 35 1,331 40 1,224 30 1,335 45 1,348 50 1,123 25 In working further with...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT