Question

In: Civil Engineering

A small city is situated on the countryside. Upstream form the city is a dam that...

A small city is situated on the countryside. Upstream form the city is a dam that provides the city's water supply. If the dam was overtopped by water, then the dam would fail and all of the water would flood through the city. There is also a danger that the dam might collapse when it is full of water and cause it to fail, also flooding the city.

A) Draw a fault tree for the head event “Dam fails and floods the town” using the following basic events The possibility of dam collapse is (P=0.01)

There is a weakness in the dam that would allow collapse to cause the dam to fail (P=0.1).

Storm occurs that overtops the dam provided that it is mostly full (P=0.002)

Storm occurs that will overtop the dam no matter how full the dam is (P=0.0004)

Dam is mostly full (P=0.4).

B) Determine the probability that the dam will fail and flood the town. For the hours of daylight (assume 12 hours on average) there is someone working at the dam who could send a warning to the city if the dam failed.

There is an 80% probability that this person would be able to get the message to the city in time to evacuate. If the dam failed during the night no one would see it, but there is a 60% chance that the weather conditions would be such that the noise of the dam breaking could be heard by someone in the city and give them enough warning to evacuate everybody.

However, every Saturday night the city has a large party, and nobody would be able to hear if the dam failed anyway.

C) Draw an event tree that can be used to determine the conditional probability that the city will receive warning in time to evacuate.

D) Determine this conditional probability of receiving the warning on time.

E) What is the overall probability that the town will be flooded without an evacuation occurring? Hint: consider your answer for (b).

Solutions

Expert Solution

Since there are some diagrams, I preferred a handwritten note. Results are tabulated in the answer for your easier understanding. Hope that it is clear for you and it really helped you.

In case of any doubt, please feel free to ask in the comment section. Thank you.


Related Solutions

Ben Enterprise is a small company situated in the city of Texas. Its employee records are...
Ben Enterprise is a small company situated in the city of Texas. Its employee records are kept in a registry. An employee number, which is written on an index card is used to access the employee files. The files contain a number of papers on which employee information is written. REQUIRED: Explain the kind of system being used.                                                     What are the benefits of using such a system?                                         If you were to recommend a change of system for this...
Francon Construction Inc, is an international company situated in Quebec City and uses IFRS. It is...
Francon Construction Inc, is an international company situated in Quebec City and uses IFRS. It is engaged in the construction of very high scale buildings in many countries for commercial and residential uses. On January 1, 2011, it issued 15-year redeemable bonds. These bonds could be redeemed at any time five years following the date of issue, at the option of the company. If these bonds were to be redeemed earlier than their maturity date, the company would have to...
2. Tiare’s city tour company is situated in the highly seasonal town of Moorea where the...
2. Tiare’s city tour company is situated in the highly seasonal town of Moorea where the number of visitors fluctuates greatly from month to month. City tours are very competitive in this town and Tiare is a price-taker. Her monthly fixed cost is $2,000. Her variable costs are: Quantity of tours per month               Variable cost 100                                                      $700 200                                                      $1500 300                                                      $2400 400                                                      $4000 500                                                      $5800 600                                                      $7800 Since Tiare is a price-taker,...
Question 1 The storage - outflow relationship for a small dam is given in Table 1....
Question 1 The storage - outflow relationship for a small dam is given in Table 1. The inflow hydrograph for the uncontrolled spillway of this dam is tabulated in Table 2. Determine: the outflow hydrograph from the spillway (fill the table and add more rows if necessary), attenuation, translation, and lengthening in the base time of the outflow hydrograph. Draw inflow and outflow hydrographs on the same figure and show the parameters asked in part b on this figure (draw...
A fisherman sets out upstream on a river. His small boat, powered by an outboard motor,...
A fisherman sets out upstream on a river. His small boat, powered by an outboard motor, travels at a constant speed v in still water. The water flows at a lower constant speed vw. The fisherman has traveled upstream for 2.00 km when his ice chest falls out of the boat. He notices that the chest is missing only after he has gone upstream for another15.0 min. At that point, he turns around and heads back downstream, all the time...
Q1. The initial cost of constructing a permanent dam (i.e., a dam that is expected to...
Q1. The initial cost of constructing a permanent dam (i.e., a dam that is expected to last forever) is $425 million. The annual net benefits will depend on the amount of rainfall: $18 million in a "dry" year, $29 million in a "wet" year and $52 million in a "flood" year. Meteorological records indicate that over the last 100 years there have been 86 "dry" years, 12 "wet" years, and 2 "flood" years. Assume the annual benefits, measured in real...
for a dam construction , what is the stages of the dam constructions starting from project...
for a dam construction , what is the stages of the dam constructions starting from project stage to operations.
Suppose a city has its water supply contaminated. In other words, suppose upstream users (upper half...
Suppose a city has its water supply contaminated. In other words, suppose upstream users (upper half of a watershed) damage the water quality for downstream users (lower half of the watershed). (A) Describe, using economic terms, the loss of well being to the cities municipal customers. (B) Define the types of costs that may be inflicted on the city’s water treatment plant AND ILLUSTRATE WITH A GRAPH. (C) Indicate at least two possible remedies (relying on course concepts) for the...
Suppose a city has its water supply contaminated. In other words, suppose upstream users (upper half...
Suppose a city has its water supply contaminated. In other words, suppose upstream users (upper half of a watershed) damage the water quality for downstream users (lower half of the watershed). (A) Describe, using economic terms, the loss of well being to the cities municipal customers. (B) Define the types of costs that may be inflicted on the city’s water treatment plant and illustrate with a graph.
2. The Cahora Bassa dam, located in Mozambique, is the highest dam in Africa. The hydroelectric...
2. The Cahora Bassa dam, located in Mozambique, is the highest dam in Africa. The hydroelectric facility within the dam generates an average 1,925 MWe. Nearly all of this electricity is exported to South Africa. The power station is linked to Pretoria, 1,420 km away, by a 533.0 kV high-voltage DC (HVDC) transmission line. a. The transmission line consists of eight cables made of aluminum with a steel core for strength and structural support. The total cross-sectional diameter of each...