The management of Firebolt Industries Inc. manufactures gasoline and diesel engines through two production departments, Fabrication and Assembly. Management needs accurate product cost information in order to guide product strategy. Presently, the company uses a single plantwide factory overhead rate for allocating factory overhead to the two products. However, management is considering the multiple production department factory overhead rate method. The following factory overhead was budgeted for Firebolt:
1 |
Fabrication Department factory overhead |
$561,600.00 |
2 |
Assembly Department factory overhead |
241,500.00 |
3 |
Total |
$803,100.00 |
Direct labor hours were estimated as follows:
Fabrication Department | 4,800 | hours |
Assembly Department | 5,250 | |
Total | 10,050 | hours |
In addition, the direct labor hours (dlh) used to produce a unit of each product in each department were determined from engineering records, as follows:
Production Departments | Gasoline Engine | Diesel Engine |
Fabrication Department | 3.1 dlh | 1.8 dlh |
Assembly Department | 1.8 | 3.1 |
Direct labor hours per unit | 4.9 dlh | 4.9 dlh |
Required: | |||||||||
a. | Determine the per-unit factory overhead allocated to the gasoline and diesel engines under the single plantwide factory overhead rate method, using direct labor hours as the activity base.* | ||||||||
b. | Determine the per-unit factory overhead allocated to the gasoline and diesel engines under the multiple production department factory overhead rate method, using direct labor hours as the activity base for each department.* | ||||||||
c. | (1) Recommend to management a product costing approach, based on your analyses in (a) and (b). (2) Give a reason for your answer. | ||||||||
*If required, round all
per-unit answers to the nearest cent. a. Determine the per-unit factory overhead allocated to the gasoline and diesel engines under the single plantwide factory overhead rate method, using direct labor hours as the activity base . If required, round all per-direct labor hours and per-unit answers to the nearest cent.
|
Solution a:
Single plantwide factory overhead rate = Estimated factory overhead / Estimated direct labor hours
= $803,100 / 10050 = $79.91 per direct labor hour
Computation of per unit factory overhead - Firebolt Industries Inc. | ||
Particulars | Gasoline Engine | Diesel Engine |
Direct labor hour per unit | 4.9 | 4.9 |
Overhead rate per direct labor hour | $79.91 | $79.91 |
Per unit factory overhead | $391.56 | $391.56 |
Solution b:
Compuation of departmental overhead rate - Firebolt industries inc. | ||
Particulars | Fabrication | Assembly |
Estimated overhead | $561,600.00 | $241,500.00 |
Direct labor hours | 4800 | 5250 |
Departmental overhead rates (per direct labor hour) | $117.00 | $46.00 |
Computation of per unit factory overhead - Firebolt Industries Inc. | ||
Particulars | Gasoline Engine | Diesel Engine |
Direct labor hours per unit - Fabrication | 3.1 | 1.8 |
Overhead rate per direct labor hour - Fabrication | $117.00 | $117.00 |
Per unit factory overhead - Fabrication (A) | $362.70 | $210.60 |
Direct labor hours per unit - Assembly | 1.8 | 3.1 |
Overhead rate per direct labor hour - Assembly | $46.00 | $46.00 |
Per unit factory overhead - Assembly (B) | $82.80 | $142.60 |
Per unit factory overhead (A+B) | $445.50 | $353.20 |
Solution c:
Management should change to the multiple production department factory overhead rate method. In this case, the single plantwide method causes cost distortion, so the multiple production department method should be used.