What is the capacity of the milling machine (in tables per day) if the batch size is 10?


C & A Furniture uses a four-step process to make its famous wood table: Process - Processing Time (minutes) Milling-table top

C & A Furniture uses a four-step process to make its famous wood table: 

Process - Processing Time (minutes) 

Milling-table top-10 minutes 

Milling-table stand - 5 minutes 

Assembly - 15 minutes 

Finishing - 20 minutes 


The milling machine requires a setup time of 30 minutes to make table tops and a changeover time of 30 minutes to make table stands.C\&A works an 8 -hour day: What is the capacity of the milling machine (in tables per day) if the batch size is 10?

Solutions

Expert Solution

Option D is the capacity of the Milling machine.

D. 6.40

6.40 Tables can be produced with the milling machine in a day of 8 hours shift.


Related Solutions

1. Party supply store A rents tables for $10 per day and chairs for $1.50 per...
1. Party supply store A rents tables for $10 per day and chairs for $1.50 per day. Party supply store B rents tables for $9 per day and chairs for $1.25 per day, plus a $36 delivery charge. After how many days is it more expensive to rent 3 tables and 24 chairs from store A? 2. The demand function for an electronics company's line of gaming laptops is p = f(q) = 5,000 - 10q, where p is the...
A particular single-machine workstation has a capacity of 1,000 units per day and variability is moderate,...
A particular single-machine workstation has a capacity of 1,000 units per day and variability is moderate, such that V = (SCV of arrivals + SCV of effective process time)/2 = 1. Demand is currently 900 units per day. Suppose management has decided that cycle times should be no longer than 1.5 times the average process time. A) What is the current cycle time in multiples of the process time? (i.e. if the current cycle time was 2 times longer than...
Jan Sport produces school bags. The demand for school bag is 10 per day. Machine set...
Jan Sport produces school bags. The demand for school bag is 10 per day. Machine set up cost for production of school bag is $120, and total material and labor cost per bag is $10, storage and handling costs are $15 per bag per year. Suppose there are 250 working days per year. Compute the EOQ as well as the total annual cost for school bag production and storage in Jan Sport.
The volatility of SBN company is 1.5% per day and the size of the position is...
The volatility of SBN company is 1.5% per day and the size of the position is $6 million. Assuming that the change is normally distributed, find a one-day 97% VaR and 10-day 90% VaR. Consider a portfolio consisting of $4 million invested in Stock Fund and $6 million in Bond Fund. The daily volatility of Stock Fund is 1% and the daily volatility of Bond Fund is 2%. The correlation coefficient between two funds is -0.4 and they are normally...
Describe the tradeoffs inherent in receiving surveillance data transmissions once per day (i.e., batch transmission) vs....
Describe the tradeoffs inherent in receiving surveillance data transmissions once per day (i.e., batch transmission) vs. real-time. Consider tradeoffs from the perspectives of alert timeliness, human/system resources required, and infrastructure.
A machine in a factory has an error rate of 10 parts per 100. The machine...
A machine in a factory has an error rate of 10 parts per 100. The machine normally runs 24 hours a day and produces 30 parts per hour. Yesterday the machine was shut down for 4
Problem Four (10 marks): Kaplan Incorporated currently uses an older model BAII plus milling machine that...
Problem Four : Kaplan Incorporated currently uses an older model BAII plus milling machine that was purchased two years ago for $10,000. The machine would be sold today for $3,000. If the old machine is not replaced, it is expected to operate for another 4 years at which time its salvage value will be $1,200. The BAII plus currently generates revenues of $13,000 per year. The machine has annual operating costs of $8,000 per year. The company maintains an investment...
A machine is available 10 hours a day. Each part takes 90 minutes to fabricate and...
A machine is available 10 hours a day. Each part takes 90 minutes to fabricate and 10 minutes to setup 10% o the parts made are defect e and must go through the machine again to be reworked, during which both setup and fabrication have to be performed again. The machine is idle for any unused time Or average, 5 good parts are made each day. What is the overall equipment effectiveness of the machine?  0.17 0.75 0.075 0.83
The normal capacity of McDougall Company s Die Cutting Department is 4,500 machine hours per month....
The normal capacity of McDougall Company s Die Cutting Department is 4,500 machine hours per month. At normal capacity, the standard factory overhead rate is $24.80 per machine hour, based on budgeted fixed factory overhead of $85,500 per month and a variable overhead rate of $5.80 per machine hour. During July, the department operated at 4,600 machine hours, with actual factory overhead of $121,000. The number of standard machine hours allowed for the production actually attained is 4,200. Required: Compute...
Consider an individual with total hours o t=24 per day. She is paid $10 per hour...
Consider an individual with total hours o t=24 per day. She is paid $10 per hour during the required 8 hours of working each day. She is also willing to work 2 extra hours per day, and gets paid $20 per hour for the overtime working. Explain the preferences of a worker and abusiness owner between overtime premium and straight-time equivalent. Your response should include a discussion of the income effect and the substitution efect.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT