Question

In: Economics

The following graph contains four lines (A, B, C and D), each of which has a...

The following graph contains four lines (A, B, C and D), each of which has a slope that is either positive, negative, zero, or infinite.

image.png

For each of the following scenarios, indicate whether the relationship between the two variables is positive or negative, as well as which line on the previous graph has a slope that reflects this type of relationship.

 Hint: The X-axis and Y-axis on the graph are not labeled intentionally. You need to substitute the variables from each scenario for the horizontal and vertical axis. For example, in the first scenario, X-axis should be labeled The average grade received" and Y-axis should be labeled "The number of hours spent studying". 


As the number of hours spent watching TV rises, the average grade received falls. 

As the number of hours spent studying falls, the likelihood of getting an A falls. 

As the number of hours spent studying rises, the average grade received rises. 


True or False: Line A has a slope of infinity. 

True 

False


The following graphs show the relationship between the price of apples and the quantity of apples supplied in two different regions, the North and the and South. Assume that the two lines are parallel. 

image.png

 In the North, if the price goes up by $0.20 per pound, then the quantity supplied in the North goes up by 100 pounds per year. If the price of apples goes up by $0.20 in the South, what will happen to the quantity supplied? 

  • The quantity will increase by 50 pounds per year. 

  • There is not enough information given to determine the supply change in the South. 

  • The quantity will decrease by 100 pounds per year. 

  • The quantity will increase by 100 pounds per year.



Solutions

Expert Solution


Related Solutions

The following graph contains four lines (A, B, C and D), each of which has a...
The following graph contains four lines (A, B, C and D), each of which has a slope that is either positive, negative, zero, or infinite.For each of the following scenarios, indicate whether the relationship between the two variables is positive or negative, as well as which line on the previous graph has a slope that reflects this type of relationship. Hint: The X-axis and Y-axis on the graph are not labeled intentionally. You need to substitute the variables from each scenario...
There are four urns, which we label A, B, C, and D, and each of these...
There are four urns, which we label A, B, C, and D, and each of these urns contains some white balls and some black balls, as specified below.•UrnAhas3white balls and2black balls•UrnBhas2white balls and6black balls•UrnChas3white balls and6black balls•UrnDhas5white balls and7black balls one of the urns is chosen at random, and then one of the balls is selected from the chosen urn. (a) What is the probability that urnAis chosen, and then a white ball is chosen from thaturn? (b) What is...
Given an experimental design with four factors A, B, C and D where each factor has...
Given an experimental design with four factors A, B, C and D where each factor has two levels. Derive the formula for effect estimation of main effect of ?, interaction effect of ??, ??? and ????. (please use (1),a,b,c,d,ab,ac,ad,bc,bd,cd,abc,abd,acd,bcd,abcd to represent the response)
For each of the following simplicial complexes ,X = {[a], [b], [c], [d], [a, b], [c,...
For each of the following simplicial complexes ,X = {[a], [b], [c], [d], [a, b], [c, d]}, and X = {[a], [b], [c], [d], [e], [a, b], [b, c], [c, d], [a, d], [a, c], [a, e], [b, e], [a, b, c]},give a basis for each non-zero Hj(X).
Each of the following four sets contains two electrons, each of which is defined by four...
Each of the following four sets contains two electrons, each of which is defined by four quantum numbers (n, l, ml, ms). For each set, indicate whether the quantum numbers for the two electrons are valid for the two electrons in the highest energy subshell of a neutral titanium atom. If they are not valid, list the principle that the quantum numbers violate (Pauli Exclusion, Aufbau, or Hund’s Rule) and explain below. (the numbers are shown below in the order...
In the diagram, which point is at the lowest potential? (a) A (b) B (c) C (d) D
In the diagram, which point is at the lowest potential?(a) A(b) B(c) C(d) D
Suppose there are four identical conducting spheres: A, B, C, and D. In each scenario, sphere...
Suppose there are four identical conducting spheres: A, B, C, and D. In each scenario, sphere A starts with a charge of −?,sphere C starts out with a charge of +Q, and spheres B and D start out neutral. Then, the spheres are touched to each other and separated in the order described. Any spheres not in contact are held very far away. For each scenario, give the final charge of sphere C as a whole‑number fraction of ?. For...
A project has four activities (A, B, C, and D) that must be performed sequentially. The...
A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows: Activity Activity Time (weeks) Probability A 5 0.32 6 0.39 7 0.27 8 0.02 B 4 0.18 6 0.51 8 0.31 C 7 0.10 9 0.29 11 0.43 13 0.15 15 0.03 D 10 0.61 12 0.39 Provide the base-case, worst-case, and best-case calculations for the time to complete...
You are following four traits (a, b, c, and d). The following crosses were performed. -...
You are following four traits (a, b, c, and d). The following crosses were performed. - Cross 1: a b female x c d male F1 progeny: all wild type - Cross 2: F1 female x F1 male F2 progeny:    1600 wild type (total 6400)     800 d 400 b d 800 a 400 a b 1200 c 400 dc 800 b A. Describe the inheritance pattern for each trait.   Be as complete as possible. B. Which, if any, genes are...
Consider a project consisting of four activities A, B, C, and D. The following are constraints...
Consider a project consisting of four activities A, B, C, and D. The following are constraints within which the project has to be conducted • A and B, the first activities of the project, can be started simultaneously. • C can be started only after A is completed. • D can be started only after B is completed Suppose the activity times for the activities are A = 4 weeks, B = 3 weeks, C = 2 weeks, D =...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT