Question

In: Economics

Assume that it takes a worker three hours of labor time to paint a room and...

Assume that it takes a worker three hours of labor time to paint a room and eight hours to sand a floor. Suppose that a second worker (same productivity as the first worker) became available. Now what would be the opportunity cost of painting four rooms? Please Explain in detail.

Solutions

Expert Solution

Productivity
Activity Time
Painting room 3 hours of labor
Sand Floor 8 hours of labor

Note: Both workers are having the same productivity.

Therefore, if we consider that these are the only two activities can be done then for the labor the value of these two activity will be equal

paints a room / three hours and Sand a floor / 8 hours

Thus, 1 room paint / 3 hours = 1 sand floor/ 8 hours

1 room Paint =

or,

Opportunity Cost
Activity
1 Room Painting 0.375 Sand Floor
1 Sand a Floor 2.67 Room Paint

This means when a worker is painting a room then in that time he has to sacrifice 0.375 floor

or, when a worker is Sand a floor then in that time he has to sacrifice 2.67 Rooms painting.

For 1 room = 0.375 Sand Floor

4 rooms = 4*0.375 Sand Floor = 1.5 Sand Floor

Therefore, if workers decide to Paint 4 rooms then, they will not be able to Sand 1.5 floor.

Please contact if having any query will be obliged to you for your generous support please help me i will be obliged to you for your kind gesture. Thank You


Related Solutions

A chair company produces two models of chairs. The Sequoia model takes 3 worker-hours to assemble and worker-hour to paint
A chair company produces two models of chairs. The Sequoia model takes 3 worker-hours to assemble and worker-hour to paint. The Saratoga model takes 2 worker-hours to assemble and I worker-hour to paint. The maximum number of worker-hours available to assemble chairs is 240 per day, and the maximum number of worker-hours available to paint chairs is 80 per day. Write a system of linear inequalities to describe the situation. Let x represent the number of Sequoia models produced in...
Bartels Corp. produces woodcarvings. It takes three hours of direct labor to produce a carving. Bartels'...
Bartels Corp. produces woodcarvings. It takes three hours of direct labor to produce a carving. Bartels' standard labor cost is $11.75 per hour. During September, Bartels produced 10,000 carvings and used 29,140 hours of direct labor at a total cost of $348,500. Indicate labor rate variance, labor effiecieny variance, and total labor variance for the month of September and whether or not they're favorable or unfavorable. Show all work for each variance and state reasons for both the rate variance...
An analyst at Carnival Cruise Lines is interested in the time it takes for a room...
An analyst at Carnival Cruise Lines is interested in the time it takes for a room service order to go from time of order to time of delivery. In order to do this, she takes a sample of 49 random guests and finds that their average time to delivery was 11.2 minutes and that the sample standard deviation was 3.5 minutes. Calculate a 95% Confidence Interval around the mean.
Overhead is applied on the basis of direct labor hours. Three direct labor hours are required...
Overhead is applied on the basis of direct labor hours. Three direct labor hours are required for each product unit. Planned production for the period was set at 8,000 units. Manufacturing overhead for the period is budgeted at $204,000, of which 30 percent is fixed. The 26,200 hours worked during the period resulted in production of 8,500 units. Manufacturing overhead cost incurred was $220,500. Required: a. Calculate the overhead spending variance: b. Calculate the overhead efficiency variance: c. Calculate the...
A researcher wanted to give a 60% confidence interval for the mean time it takes worker...
A researcher wanted to give a 60% confidence interval for the mean time it takes worker to perform a routine task. The researcher had a random sample of 100 worker perform the task. The sample mean time to perform the task was 21 minutes with a sample standard deviation of 2 minutes. Give the 60% confidence interval for the population mean time to perform the task. Round your answer to two decimal places.
The length of time, in hours, it takes an "over 40" group of people to play...
The length of time, in hours, it takes an "over 40" group of people to play one soccer match is normally distributed with a mean of 2.2 hours and a standard deviation of 0.55 hours. A sample of size n = 80 is drawn randomly from the population. Find the probability that the sample mean is between 2.1 hours and 2.4 hours.
The data presented below were collected on the amount of time, in hours; it takes an...
The data presented below were collected on the amount of time, in hours; it takes an employee, to process an order at a local plumbing wholesaler. 2.8 4.9 0.5 13.2 14.2 8.9 3.7 15.2 11.2 13.4 5.5 10.2 1.1 14.2 7.8 4.5 10.9 8.8 18.2 17.1 Construct a stem-and-leaf display of the data. Construct a frequency distribution of the data Construct cumulative frequency and cumulative percent distributions of the data Construct a frequency histogram of the data. Determine the percentage...
The length of time, in hours, it takes an "over 40" group of people to play...
The length of time, in hours, it takes an "over 40" group of people to play one soccer match is normally distributed with a mean of 4 hours and a standard deviation of 0.5 hours. A sample of size n = 50 is drawn randomly from the population. Find the probability that the sample mean is between 3.5 hours and 4.1 hours.
Graphs have to be made as well* 1.) Suppose it takes Zeeland 5 labor hours to...
Graphs have to be made as well* 1.) Suppose it takes Zeeland 5 labor hours to make each car and 15 labor hours to make each robot, while it requires Antigo 1 labor hours to make each car and 10 labor hours to make each robot. Further suppose each nation has 90 labor hours available. 2.) What is the opportunity cost of one car for Antigo and for Zeeland? What about for one robot? 3.) Suppose each nation specializes according...
Assume that the (daily) demand (measured in hours of work) of unskilled labor in a particular...
Assume that the (daily) demand (measured in hours of work) of unskilled labor in a particular town is given by D(w) = 60 -w, where w denotes the hourly wage rate. The supply of unskilled labor at the same location is given by S(w) = 3w -12. (a) What is the competitive market equilibrium wage for unskilled labor in this town? (b) Plot the demand and supply curves on the same graph, having wages on the vertical axis and hours...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT