Question

In: Accounting

Bartels Corp. produces woodcarvings. It takes three hours of direct labor to produce a carving. Bartels'...

Bartels Corp. produces woodcarvings. It takes three hours of direct labor to produce a carving. Bartels' standard labor cost is $11.75 per hour. During September, Bartels produced 10,000 carvings and used 29,140 hours of direct labor at a total cost of $348,500. Indicate labor rate variance, labor effiecieny variance, and total labor variance for the month of September and whether or not they're favorable or unfavorable. Show all work for each variance and state reasons for both the rate variance amd efficiency variance.

Solutions

Expert Solution

If You have any queries please do comment

Please Rate Positive


Related Solutions

1. Hassock Corp. produces woven wall hangings. It takes 4 hours of direct labor to produce...
1. Hassock Corp. produces woven wall hangings. It takes 4 hours of direct labor to produce a single wall hanging. Hassock’s standard labor cost is $16 per hour. During August, Hassock produced 14,900 units and used 60,170 hours of direct labor at a total cost of $960,720. What is Hassock’s labor efficiency variance for August? $9,120 unfavorable. $7,120 unfavorable. $4,000 favorable. $9,120 favorable. $11,120 unfavorable. 2. Based on a predicted level of production and sales of 23,000 units, a company...
Overhead is applied on the basis of direct labor hours. Three direct labor hours are required...
Overhead is applied on the basis of direct labor hours. Three direct labor hours are required for each product unit. Planned production for the period was set at 8,000 units. Manufacturing overhead for the period is budgeted at $204,000, of which 30 percent is fixed. The 26,200 hours worked during the period resulted in production of 8,500 units. Manufacturing overhead cost incurred was $220,500. Required: a. Calculate the overhead spending variance: b. Calculate the overhead efficiency variance: c. Calculate the...
Hanson Corp. produces three products, and is currently facing a labor shortage – only 3,180 hours...
Hanson Corp. produces three products, and is currently facing a labor shortage – only 3,180 hours are available this month. The selling price, costs, and labor requirements of the three products are as follows: Product A Product B Product C Selling price $ 98.00 $ 70.00 $ 88.00 Variable cost per unit $ 57.00 $ 29.00 $ 48.00 Direct labor hours per unit 3.4 4.8 3.8 a. What is the contribution margin per unit for each product? A- B- C-...
Hanson Corp. produces three products, and is currently facing a labor shortage – only 4,200 hours...
Hanson Corp. produces three products, and is currently facing a labor shortage – only 4,200 hours are available this month. The selling price, costs, labor requirements, and demand of the three products are as follows:    Product A Product B Product C Selling price $ 59.00 $ 38.00 $ 51.00 Variable cost per unit $ 53.00 $ 30.00 $ 47.00 Direct labor hours per unit 1.5 2.7 2.0 Demand 1,600 1,400 1,600 a. In what order should Hanson prioritize production of...
Glavine & Co. produces a single product, each unit of which requires three direct labor hours...
Glavine & Co. produces a single product, each unit of which requires three direct labor hours (DLHs). Practical capacity (for setting the factory overhead application rate) is 60,000 DLHs, on an annual basis. The information below pertains to the most recent year: Standard direct labor hours (DLHs) per unit produced 3.00 Practical capacity, in DLHs (per year) 60,000 Variable overhead efficiency variance $ 20,000 unfavorable (U) Actual production for the year 17,000 units Budgeted fixed manufacturing overhead $ 1,200,000 Standard...
MAnufacturing overhead is applied on the basis of direct labor hours. The direct labor hours for...
MAnufacturing overhead is applied on the basis of direct labor hours. The direct labor hours for the period are 500 and the estimated manufacturing overhead is 2000. actual direct labor hours were 160 and actual overhead was 1000. Compute the manufacturing overhead applied during this period.
Assume that it takes a worker three hours of labor time to paint a room and...
Assume that it takes a worker three hours of labor time to paint a room and eight hours to sand a floor. Suppose that a second worker (same productivity as the first worker) became available. Now what would be the opportunity cost of painting four rooms? Please Explain in detail.
James Corp. applies overhead on the basis of direct labor hours. For the month of May,...
James Corp. applies overhead on the basis of direct labor hours. For the month of May, the company planned production of 10,000 units (80% of its production capacity of 12,500 units) and prepared the following overhead budget: Operating Levels Overhead Budget 80% Production in units 10,000 Standard direct labor hours 36,000 Budgeted overhead Variable overhead costs Indirect materials $ 21,600 Indirect labor 36,000 Power 7,200 Maintenance 3,600 Total variable costs 68,400 Fixed overhead costs Rent of factory building 20,000 Depreciation—Machinery...
James Corp. applies overhead on the basis of direct labor hours. For the month of May,...
James Corp. applies overhead on the basis of direct labor hours. For the month of May, the company planned production of 10,000 units (80% of its production capacity of 12,500 units) and prepared the following overhead budget: Operating Levels Overhead Budget 80% Production in units 10,000 Standard direct labor hours 26,000 Budgeted overhead Variable overhead costs Indirect materials $ 15,600 Indirect labor 26,000 Power 7,800 Maintenance 2,600 Total variable costs 52,000 Fixed overhead costs Rent of factory building 22,000 Depreciation—Machinery...
James Corp. applies overhead on the basis of direct labor hours. For the month of May,...
James Corp. applies overhead on the basis of direct labor hours. For the month of May, the company planned production of 10,000 units (80% of its production capacity of 12,500 units) and prepared the following overhead budget: Operating Levels Overhead Budget 80% Production in units 10,000 Standard direct labor hours 30,000 Budgeted overhead Variable overhead costs Indirect materials $ 21,000 Indirect labor 30,000 Power 6,000 Maintenance 3,000 Total variable costs 60,000 Fixed overhead costs Rent of factory building 14,000 Depreciation—Machinery...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT