In: Accounting
Costs associated with two alternatives, code-named Q and R, being considered by Albiston Corporation are listed below: Alternative Q Alternative R Supplies costs $ 72,000 $ 72,000 Power costs $ 33,300 $ 32,200 Inspection costs $ 26,000 $ 32,200 Assembly costs $ 38,000 $ 38,000 Required: a. Which costs are relevant and which are not relevant in the choice between these two alternatives? b. What is the differential cost between the two alternatives?
a.
| Supplies costs | Not relevant since the costs do not differ between alternatives | ||||
| Power costs | Relevant, since costs differ between alternatives | ||||
| Inspection costs | Relevant, since costs differ between alternatives | ||||
| Assembly costs | Not relevant since the costs do not differ between alternatives | ||||
b.
| Alternative Q | Alternative R | Differential | |
| Supplies costs | $ 72,000.00 | $ 72,000.00 | $ - |
| Power costs | 33,300.00 | 32,200.00 | (1,100.00) |
| Inspection costs | 26,000.00 | 32,200.00 | 6,200.00 |
| Assembly costs | 38,000.00 | 38,000.00 | - |
| Total | $ 169,300.00 | $ 174,400.00 | $ 5,100.00 |