Question

In: Statistics and Probability

Motorola used the normal distribution to determine the probability of defects and the number of defects...

Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 10 ounces.

(a)

The process standard deviation is 0.21, and the process control is set at plus or minus one standard deviation. Units with weights less than 9.79 or greater than 10.21 ounces will be classified as defects. (Round your answer to the nearest integer.)

Calculate the probability of a defect. (Round your answer to four decimal places.)

Calculate the expected number of defects for a 1,000-unit production run. (Round your answer to the nearest integer.)

defects

(b)

Through process design improvements, the process standard deviation can be reduced to 0.07. Assume the process control remains the same, with weights less than 9.79 or greater than 10.21 ounces being classified as defects.

Calculate the probability of a defect. (Round your answer to four decimal places.)

Calculate the expected number of defects for a 1,000-unit production run. (Round your answer to the nearest integer.)

defects

(c)

What is the advantage of reducing process variation, thereby causing process control limits to be at a greater number of standard deviations from the mean?

Reducing the process standard deviation causes no change in the number of defects.Reducing the process standard deviation causes a substantial increase in the number of defects.     Reducing the process standard deviation causes a substantial reduction in the number of defects.

Solutions

Expert Solution

Let X be the weight of any given item. X has a normal distribution with mean and standard deviation

a)  the probability of a defect is the probability that a randomly selected unit weighs less than 9.79 or greater than 10.21 ounces

ans: the probability of a defect is 0.3173

the probability that a randomly selected item is defective is 0.3173

Let Y be the number of units out of 1000 which are defective. We can say that Y has a Binomial distribution with parameters, number of trials (number of units) n=1000 and success probability ( the probability that a randomly selected item is defective) p=0.3173

We know the the expectation of Y is

ans: the expected number of defects for a 1,000-unit production run is 317

b) the process standard deviation can be reduced to 0.07, that is if X is the weight of any given item. X has a normal distribution with mean and standard deviation

the probability of a defect is the probability that a randomly selected unit weighs less than 9.79 or greater than 10.21 ounces

ans: the probability of a defect is 0.0027

the probability that a randomly selected item is defective is 0.0027

Let Y be the number of units out of 1000 which are defective. We can say that Y has a Binomial distribution with parameters, number of trials (number of units) n=1000 and success probability ( the probability that a randomly selected item is defective) p=0.0027

We know the the expectation of Y is

ans: the expected number of defects for a 1,000-unit production run is 3

c) We can see that the number of defects has reduced due to the decrease in the standard deviation

ans: Reducing the process standard deviation causes a substantial reduction in the number of defects.


Related Solutions

Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 7 ounces. a. The process standard deviation is 0.10, and the process control is set at plus or minus 2 standard deviation s . Units with weights less than 6.8 or greater than 7.2 ounces will be classified as defects. What is the probability of a defect (to...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 14 ounces. The process standard deviation is 0.2, and the process control is set at plus or minus 0.5 standard deviation. Units with weights less than 13.9 or greater than 14.1 ounces will be classified as defects. What is the probability of a defect (to 4 decimals)? In...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 12 ounces. a. The process standard deviation is 0.10 ounces, and the process control is set at plus or minus 1.75 standard deviations. Units with weights less than 11.825 or greater than 12.175 ounces will be classified as defects. What is the probability of a defect (to 4...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 14 ounces. a. The process standard deviation is 0.10 ounces, and the process control is set at plus or minus 2.25 standard deviations. Units with weights less than 13.775 or greater than 14.225 ounces will be classified as defects. What is the probability of a defect (to 4...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 14 ounces. The process standard deviation is 0.1, and the process control is set at plus or minus 1.5 standard deviations. Units with weights less than 13.85 or greater than 14.15 ounces will be classified as defects. What is the probability of a defect (to 4 decimals)? In...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of ounces. a. The process standard deviation is , and the process control is set at plus or minus standard deviation . Units with weights less than or greater than ounces will be classified as defects. What is the probability of a defect (to 4 decimals)? In a production...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 11 ounces. a. The process standard deviation is .20 ounces, and the process control is set at plus or minus .75 standard deviations. Units with weights less than 10.85 or greater than 11.15 ounces will be classified as defects. What is the probability of a defect (to 4...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of ounces. a. The process standard deviation is, and the process control is set at plus or minus standard deviation. Units with weights less than or greater than ounces will be classified as defects. What is the probability of a defect (to 4 decimals)? In a production run of...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of  ounces. a. The process standard deviation is , and the process control is set at plus or minus  standard deviation . Units with weights less than  or greater than  ounces will be classified as defects. What is the probability of a defect (to 4 decimals)? In a production run of  parts, how many...
Motorola used the normal distribution to determine the probability of defects and the number of defects...
Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a production process. Assume a production process produces items with a mean weight of 11 ounces. Use Table 1 in Appendix B. a. The process standard deviation is 0.1, and the process control is set at plus or minus 2 standard deviations. Units with weights less than 10.8 or greater than 11.2 ounces will be classified as defects. What is the probability...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT