In: Statistics and Probability
A product is being assembled and packaged on three production lines (line A, line B, and line C). Each day, the quality control team selects a production line and inspects a batch chosen at random from the output of the selected production line. Line A is selected with probability .5, line B is selected with probability .2, and line C is selected with probability .3. The probability that no defects will be found in a batch selected from line A is 0.98, and the corresponding probabilities for production lines B and C are 0.96 and 0.94, respectively.
a) What is the probability that the quality control team inspects a batch from line A and finds no defects?
b) What is the probability that the quality control team inspects a batch from line B and finds no defects?
c) What is the probability that the quality control team inspects a batch from line C and finds no defects?
d) What is the probability that no defects are found in any given day?
e) Given that no defects were found in a given day, what is the probability the inspected batch came from line A?
f) Given that no defects were found in a given day, what is the probability the inspected batch came from line B?
g) Given that no defects were found in a given day, what is the probability the inspected batch came from line C?