Explain statistical process control(SPC) and how it
relates to continuous process improvement. Relate Demmings 14
Quality...
Explain statistical process control(SPC) and how it
relates to continuous process improvement. Relate Demmings 14
Quality Points and explain how statistical data can assist with
quality improvements efforts.
In quality control, statistical process control (SPC ) is often
employed to analyze the process capability in manufacturing or
service operations. Explain the following with an example each
:
What is a p chart ?
What is a c chart ?
There are 3 machines in your factory which can produce a ruler.
The rulers as produced has a spread in length between 12.5 thru
12.4 inch.
The standard deviation of the 3 machines are
* 0.15
* 0.09
* 0.13...
In quality control, statistical process control (SPC ) is often
employed to analyze the process capability in manufacturing or
service operations. Explain the following with an example each
:
What is a p chart ?
What is a c chart ?
There are 3 machines in your factory which can produce a ruler.
The rulers as produced has a spread in length between 12.5 thru
12.4 inch.
Given the standard deviation of the 3 machines are as follows,
calculate the process...
Define
the concept of statistical process control
Explain briefly the rationale for SPC
What
is meant by variation in processes?
Describe how the seven tools are used when implementing SPC.
Applications of Statistical Process Control and Quality
Improvement Tools in Transactional and
Service Business.
The tools are:
1. Cause and Effect Analysis.
2. Check sheets/ tally sheets.
3. Graphs.
4. Histograms.
5. Pareto analysis.
6. Scatter analysis.
7. Control charts.
. For discussion, I want you to discuss how these tools are
being used in your realm of work? If they are not
being used, then how do you see them being used? Identify at
least one tool being used...
discuss substantively the these 3 principles of
Continuous Quality Improvement (CQI).
statistical evaluation using factual data is the
basis for CQI.
All departments within the facility must implement CQI.
. problem solving and process improvement are best performed by
interdisciplinary(or multidisciplinary) work teams
Continous learning, training, and education are the
responsibility of everyone in the organization, but these
activities require support from the top.
If the Shops applied the Trilogy of Juran; “Quality Planning,
Quality Control and Quality Improvement,” explain what the
shop-owners should have been seen doing?