Question

In: Accounting

During 2020 Sheridan Manufacturing expected Job 25 to cost $75400 of overhead, $130000 of material, and...

During 2020 Sheridan Manufacturing expected Job 25 to cost $75400 of overhead, $130000 of material, and $25000 in labour. Caruba applied overhead based on direct labour cost. Actual production required an overhead cost of $80000, $139200 in materials used; and $20000 in labour. All of the goods were completed. What amount was transferred to Finished Goods?
$239200


$230400


$219520


$210320

Solutions

Expert Solution

Answer: $219520

Applied overhead rate = Expected overhead / Expected labor cost

                                     = $75,400 / $25,000

                                     = $3.016

Amount of finished goods = Material used + Actual labor cost + Applied overhead

                                            = 139200 + 20000 + (20,000 × 3.016)

                                            = 159,200 + 60,320

                                            = 219,520


Related Solutions

2019, Goodman Manufacturing expected Job No. 25 to cost $250,000 of overhead, $400,000 of materials, and...
2019, Goodman Manufacturing expected Job No. 25 to cost $250,000 of overhead, $400,000 of materials, and $250,000 in labor. Goodman applied overhead based on direct labor cost. Actual production required an overhead cost of $285,000, $560,000 in materials used, and $230,000 in labor. All of the goods were completed. The amount transferred to finished goods was?
During 2020, Sheridan Company started a construction job with a contract price of $1,376,000. The job...
During 2020, Sheridan Company started a construction job with a contract price of $1,376,000. The job was completed in 2022. The following information is available. The contract is non-cancellable. 2020 2021 2022 Costs incurred to date $344,000 $709,500 $920,200 Estimated costs to complete 516,000 236,500 0 Billings to date (non-refundable) 258,000 774,000 1,376,000 Collections to date 232,200 696,600 1,225,500 Calculate the amount of gross profit to be recognized each year, assuming the percentage-of-completion method is used. (Enter negative amounts using...
Tanner Manufacturing Expected Job No. 26 to cost $300,000 of overhead, $500,000 of materials, and $200,000...
Tanner Manufacturing Expected Job No. 26 to cost $300,000 of overhead, $500,000 of materials, and $200,000 in labor. Tanner applied overhead based on direct labor cost. Actual production required an overhead cost of $290,000, $550,000 in materials used, and $220,000 in labor. All of the goods were completed. What amount was transferred to Finished Goods? $1,000,000 $1, 060,000 $1, 070,000 $1, 100,000
Dobson Manufacturing Company uses a job order cost system with manufacturing overhead applied to products on...
Dobson Manufacturing Company uses a job order cost system with manufacturing overhead applied to products on the basis of direct labor dollars. At the beginning of the most recent period, the company estimated its total direct labor cost to be $51,700 and its total manufacturing overhead cost to be $98,230. Several incomplete general ledger accounts show the transactions that occurred during the most recent accounting period which is given in second requirement. Required: 2. Fill in the missing values in...
Dobson Manufacturing Company uses a job order cost system with manufacturing overhead applied to products on...
Dobson Manufacturing Company uses a job order cost system with manufacturing overhead applied to products on the basis of direct labor dollars. At the beginning of the most recent period, the company estimated its total direct labor cost to be $54,800 and its total manufacturing overhead cost to be $98,640. Several incomplete general ledger accounts show the transactions that occurred during the most recent accounting period which is given in second requirement. Required: 1. Calculate the predetermined overhead rate. 2....
Dobson Manufacturing Company uses a job order cost system with manufacturing overhead applied to products on...
Dobson Manufacturing Company uses a job order cost system with manufacturing overhead applied to products on the basis of direct labor dollars. At the beginning of the most recent period, the company estimated its total direct labor cost to be $50,300 and its total manufacturing overhead cost to be $90,540.      Several incomplete general ledger accounts showing the transactions that occurred during the most recent accounting period follow:             Required: 1. Calculate the predetermined overhead rate.                  2. Fill in...
Even though a job is not completed at year end, manufacturing overhead cost may be applied...
Even though a job is not completed at year end, manufacturing overhead cost may be applied to that job when a predetermined overhead rate is used. True False
Weinrich Manufacturing uses a job order cost system and applies overhead to Production on the basis...
Weinrich Manufacturing uses a job order cost system and applies overhead to Production on the basis of direct labor hours. On January 1, 2016, Job No. 25 was the only job in process with total costs of $25,000. Estimated overhead costs are $480,000, direct labor costs are $300,000 and direct labor hours are 20,000 for the year. a. Calculate the predetermined overhead rate. b. Prepare the following entries: 1. Purchased raw materials of $50,000 on account. 2. Incurred factory labor...
Agassi Company uses a job-order cost system in each of its three manufacturing departments. Manufacturing overhead...
Agassi Company uses a job-order cost system in each of its three manufacturing departments. Manufacturing overhead is applied to jobs on the basis of direct labour cost in Department D, direct labour hours in Department E, and machine hours in Department K. In establishing the predetermined overhead rates for 2020, the following estimates were made for the year. Department D E K Manufacturing overhead $1,280,000 $1,500,000 $840,000 Direct labour costs $1,600,000 $1,312,500 $472,500 Direct labour hours 105,000 125,000 42,000 Machine...
direct material (DM), direct labor (DL) and manufacturing overhead (MOH) are considered components of product cost...
direct material (DM), direct labor (DL) and manufacturing overhead (MOH) are considered components of product cost that eventually become part of inventory cost. Selling and administrative expenses are typically considered period costs that should be charged to expenses in the period in which those are incurred. Now, what happens if a period cost is incorrectly classified as a product cost, and vice versa? What is affected, and how does that matter? [think about where these costs eventually end up and...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT