In: Economics
Below are the short-run average-total-cost schedules for three
plants of different size that a firm
might build to produce its product. Assume that these are the only
possible sizes of plants that the
firm might build. (10 points)
a) What is the long-run average-cost schedule for the firm? Show it
in the second table below.
Plant size X Plant size Y Plant size Z
Output ATC Output ATC Output ATC
5 $10 5 $13 5 $72
10 9 10 12 10 65
15 8 15 11 15 52
20 7 20 10 20 41
25 6 25 8 25 33
30 9 30 7 30 20
35 12 35 9 35 15
40 18 40 12 40 14
45 20 45 17 45 12
50 23 50 19 50 14
55 29 55 25 55 20
60 31 60 33 60 30
Output Average cost
5 $_____
10 _____
15 _____
20 _____
25 _____
30 _____
35 _____
40 _____
45 _____
50 _____
55 _____
60 _____
b) For what output levels should the firm build plant X, plant Y,
and plant Z?
Solution,
a). The average cost is equal to the sum of the cost of all plant on a specific output, such as average cost at output 5 is equal to the sum of the average cost of all plant at output 5 divided by the number of firm/plant
Average Cost = (ATCx + ATCy + ATCz)/3
Plant size X | Plant Size Y | Plant Size Z | Industry | ||||
Output | ATC | Output | ATC | Output | ATC | Output | Average Cost |
5 | 10 | 5 | 13 | 5 | 72 | 5 | 31.66666667 |
10 | 9 | 10 | 12 | 10 | 65 | 10 | 28.66666667 |
15 | 8 | 15 | 11 | 15 | 52 | 15 | 23.66666667 |
20 | 7 | 20 | 10 | 20 | 41 | 20 | 19.33333333 |
25 | 6 | 25 | 8 | 25 | 33 | 25 | 15.66666667 |
30 | 9 | 30 | 7 | 30 | 20 | 30 | 12 |
35 | 12 | 35 | 9 | 35 | 15 | 35 | 12 |
40 | 18 | 40 | 12 | 40 | 14 | 40 | 14.66666667 |
45 | 20 | 45 | 17 | 45 | 12 | 45 | 16.33333333 |
50 | 23 | 50 | 19 | 50 | 14 | 50 | 18.66666667 |
55 | 29 | 55 | 25 | 55 | 20 | 55 | 24.66666667 |
60 | 31 | 60 | 33 | 60 | 30 | 60 | 31.33333333 |
b).
the output level the firm build where each plant have lowest cost
long-run cost is passed through the point where plants have a minimum cost.
Plant X produced output 25 where the average cost is lowest 6 and Plant Y produced output 30 where the average cost is lowest 7 and Plant Z produced output 45 where the average cost is lowest 12.
Plant X - 25
Plant Y - 30
Plant Z - 45