Question

In: Mechanical Engineering

QUESTION 1 Study a manufacturing company or environment of your choice. Report on the following: 1.1...

QUESTION 1
Study a manufacturing company or environment of your choice. Report on the following:
1.1 Products and processes (5)
1.2 Product flow (5)
1.3 Calculate the cycle time. (5)
1.4 Identify equipment or technology, its specifications and manufacturers in your view
that will needed to improve the processes. Identify certain specific equipment, specifications and manufacturers of such. (10)
1.5 What steps and decisions with regards to acquiring and deploying technology that support the manufacturing activities.

Solutions

Expert Solution

Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study

Abstract

Click ‘Lean’’ approach has been applied more than frequent in many manufacturing management floors over these few decades. Started in the automotive industry, sequential improvement initiatives were implemented to enhance the manufacturing practice changes. The team described a case where Lean Production (LP) principles were adapted for the process sector of an automotive part manufacturing plant. Value Stream Mapping (VSM) is one of the key lean tools used to identify the opportunities for various lean techniques. The contrast of the before and after the LP initiatives in determine managers potential benefits such as reduced production lead-time and lower work-in-process inventory. As VSM involves in all of the process steps, both value added and non-value added, are analyzed and using VSM as a visual tool to help see the hidden waste and sources of waste. A Current State Map is drawn to document how things actually operated on the production floor. Then, a Future State Map is developed to design a lean process flow through the elimination of the root causes of waste and through process improvements. An Implementation Plan then outline details of the steps needed to support the LP objectives. This paper demonstrates the VSM techniques and discusses the application in an LP initiative on a product (Front disc, D45T) case study.

1. Introduction

Lean manufacturing is one of the initiatives that many major manufacturing plants in Asia, especially in Malaysia have been trying to adopt in order to remain competitive in an increasingly competitive global market. The focus of the approach is on cost reduction through eliminating non value added activities via applying a management philosophy which focused on identifying and eliminating waste from each step in the production chain respective of energy, time, motion and resources alike throughout a product’s value stream, known as lean. Since the birth of Toyota Production System, many of the tools and techniques of lean manufacturing (e.g., just-in-time (JIT), cellular manufacturing, total productive maintenance, single-minute exchange of dies, production smoothing) have been extensively used. This activity is more towards to Toyota Production System (TPS), a systematic approach to identify and eliminate waste activities through continuous improvement. All these effort is objectively to keep cost down and stay ahead in the race. The paper begins by providing a brief synopsis on the principles applied in this study followed by the background information on the work conducted in the project. In general view, Lean Manufacturing (LM) is an arrangement of techniques and activities for running a production industries or service operation. Depending on the application, the techniques and activities would respectively differ accordingly. Nevertheless, they have the same core principle: the elimination of all non-value-adding activities and waste from the business. Types of waste that outlined in the project include the following 7 Muda [1]. Lean was chosen as the key ingredients in the improvement program objectively to suit the purpose of waste removal. Lean application is guided by 5 simple steps starting from identifying the value of process, identifying the process value stream, focusing on the process flow, configurations of the pull factor and work towards process perfection [2]. The most regular quality gurus such as Toyoda, Shigeo Shingo, and Taiichi Ohno are those responsible in formulating a new, disciplined, process-oriented system, which is known today as the ‘‘Toyota Production System,’’ or ‘‘Lean Manufacturing’’[1]. By applying tools that could identify major sources of waste, and then using tools such as production smoothing approach, setup time reduction and others to eliminate waste, the project team applied the following related lean tools such as Kanban, Total Preventive Maintenance (TPM), Setup time reduction, Yamazumi chart, Total quality management (TQM), 5S and VSM: A collection of all actions (value added as well as non-value-added) that are required to bring a product through the main flows. The objective of this project is to use a case-based approach to determine how lean manufacturing tools are utilized to help the process industry eliminate waste, maintain better inventory control, improve product quality, and capable of better operational control. A Small Medium Industries (SMI) is a local company referred to demonstrate the approach followed is referred to as SMC throughout this paper. In SMC, the team adopted VSM to map the current operating state for SMC. In case of before LP is implemented, VSM mapping is used to identify sources of waste and to discover the appropriate lean tools for reducing the waste. A later map is then established to highlight the improvement in the area and the applied lean tools.

2. Methods

2.1. Process Review and Data Collection

Prior to LP implementation, a process review on D45T was conducted to investigate the existing method of its actual assembly processes through direct observation. Hardcopy information on actual manufacturing activities are based on their Operations Manuals and the Standard Operating Procedure (SOP). The Cycle Time or Processing Time measured is as per SMC manufacturing data collected from Production In-process Quality Control (QC) for the past 3months were compiled in order to establish the baseline for data analysis. Further to that, line observation was conducted to monitor and to grasp full understanding on the current practice at the assembly line as well as to identify types of wastes in the process. Changeover time, transportation time, queuing, handling and machine time data were tabulated during the first month of the monitoring period. Method to establish VSM is presented though the following;

• Data of Cycle time or processing time

• Data of Changeover time.

• Initial data collection on overall cycles times, waste time, in-process queue time.

• Data gathering for % rejects and work-in-process

• Gemba

• Establishing VSM

• Kaizen initiatives

• Monitoring and improvised.

2.2. VSM – The mapping Process

Value stream mapping (VSM) is an effective tool for the practice of lean manufacturing. VSM approached the entire process flow in a three-step methods [4] in which first producing a diagram showing the actual material and information flows or Current State on how the actual process operates. This is created while walking down the production line. Secondly, a Future State map is produced to identify the root causes of waste and through process improvements that could give great financial impact to the process, a lean process flow. These improvements are then carried out, the Implementation Plan as part and partial details and action needed to gain the project objectives in process kaizen (continuous improvement) and poka-yoke [3]. Figure1[5] shows a map of a simple value stream. This example is a material-flow-only value stream map. A weekly truck shipment of material is kept as inventory for 5 days before being assembly and inspected. Assembly process and inspection activities are being captured in the data box. Complete products are kept for another 30 days in the inventory before is scheduled for delivery.

2.3. VSM Implementation and Kaizen activity

SMC and the kaizen group studied the Current State map onto the D45T assembly line. A set of kaizen activities initiated and implemented in effort to optimize the productivity of the assembly line. The assembly process is monitored and during the monitoring phase, continuous evaluation on any discrepancies or imperfections on product are being addressed immediately. Necessary counter measures are made to ensure the effectiveness of the new Future state VSM and line productivity stability is achieved.

2.4. Performance analysis.

This analysis was conducted by comparing performance of the assembly line before and after the implementation of the kaizen in terms of output per man hour and backlog quantity on daily basis.

3. Case Study

3.1. Company and Process Background

Company that the team referred to SMC is involved in Malaysia-Japan Automotive Industries Cooperation (MAJAICO) Project since 2006. Currently SMC has successfully commenced the mass production and delivery of 50% entity for Perusahaan Otomobil Kedua Sendirian Berhad (PERODUA) and 50% entity for Perusahaan Otomobil Nasional (PROTON). Some examples of the engine components produced include water pump pulley, intake manifold, cap camshaft, flywheel assembly, stopper body assembly, rocker arm assembly and oil filter bracket. Part of transmission components however includes the shift rail assembly, reverse shift lug and the clutch release fork assembly. The brake component partly includes the front hub, brake caliper assembly, brake drum and the front disc.

The management had selected a major product order, front disc assembly named D54T. After two years, product Front Disc D54T, SMC failed to achieve their daily production forecast. The management proposed lean approach as mode to tackle the issue of eliminating waste, to better maintain their inventory control, improve product quality, and capable of better operational control. The data and information provided by the case study on D45T can enable the management to compare the expected performance of the lean system relative to that of the existing system it is designed to replace.

3.2. Product Process Flow

Producing D45T consist eight operation machines in its assembly line. Every machine has different process. Two operators are required to operate on the production floor. Raw material will be placed on the bar stock is called stocker on the machine labeled as OP1, a Muratec MW200. This machine is an auto-machine where the operator handling is required only during the time of loading and unloading of the bar stock. Raw material will go through rough facing and rough boring process on the front face of part. The stocker can accommodate up to 80 pieces bars at one loading. Next is machined labeled as OP2 and OP30. The loading and unloading to OP2 is made by an automatic loading arm, a programmable motion loader placed next to the OP2 machine. Same machine as OP1, but in a different work space, part will be reversed to make room for machining process at the back face of part. The process includes rough facing, turning, chamfering and finish turning. Once completed, the loader will unload part and load onto machine OP3, a different type of machine; MURATEC MS100 completed the process of finish turning, finish boring and finish facing on both part surfaces. Parts are being machined continuously on OP1 to OP2 and to OP3 with each machine with its own cycle time.

Once OP3 completed its task, part will be transferred manually for threading process on OP4. OP4/1 is a Fanuc Robodrill machine while OP4/2 is using KIRA VTC 309. The requirement for two separate machines to carry out this process is because of the long machining time of this process. Whenever the processes accumulate too much work-in-progress (WIP), loader on existing OP3 which is equipped with a sensor shall automatically stop machine OP1, OP2 and OP3. The operator shall need to wait to unload parts onto these machines.

For grinding process, the part shall go through machine OP5, a DAISHI SEIKI Grinding machine. The second operator shall be involved hereon. Part will be grind on the front face to get the smooth and good finish surface. Next, part shall be transported to an OP6, a KATAOKA washing machine, a machine used to wash the part that is contaminated with coolant from previous machining processes. It is important to remove the coolant as it can cause chemical contamination that may damage the part during measuring processes. Next process, the measuring process through a measuring machine that is very sensitive to chemical reactant. Any presence of chemical trace will break the programming function of the machine.

OP7 consist of a MARPOSS type machine which is a measuring machine that measures the diameter of part, the drilled holes diameter, height and length after finish process turning, boring, chamfering, drilling, taping, and grinding. OP8, is a Hanbando type machine where the part will undergo balancing process to measure the stability and accuracy of part before assemble at car.

3.3. Current D45T data

Observations and measurement of production achievement was measured for 30 days in the first month of monitoring period. The data are summarized as exampled in the following Table 1.

The total production output for January 2011 was at a volume of 18,210 units of D45T. The average production attainment for January 2011 was at 87.4%. SMC looked into the production daily report and the 13.6% short of plan including the 3% rejects.

3.4. Gemba and Current State Map

Part of practicing Lean is to walk and head out to the floor, to be able to assess how well SMC is doing. It is part of the “Check” in the Plan-Do-Check-Action continuous improvement cycle. Walking the gemba allows the team to see issues, clearing them, finding their causes, and next step is to work into solving them.

To create a current state map, the team collected the data and information by walking the flow and interviewing the operator who perform the individual task. The advantage in walking the flow is useful way to create the map rather than summing up the information gathered in office meetings and discussion. Secondly, the team had the chance to view the entire process themselves and look out for waste. During interviews the operators, assemblers or technicians can provide answer questions and further clarify any misconceptions or prejudiced views on how tasks are performed. The drawing of the VSM mapping is based on the simplified application by Sean M. Gahagan (2012) which accumulated all details in a simpler manner. The key elements available in the Value Stream that are documented on the map establish the sequence of the following details [6]:

  1. The Customer (and the customer’s requirements i.e delivery frequency)
  2. Main Process Steps (in order, including undocumented work)
  3. Process Metrics (Process Time, Wait Time, First Time Quality)
  4. Supplier with Material Flows (using a value stream walk-through)
  5. Information & Physical Flows (how each process prioritizes work)
  6. Overall Performance of the value stream (e.g. Total Lead Time)

The process object consists of small boxes in the map represent the process and the number inside the box displays the number of workers at each process. Also, each process has a data box below, which contains the process CT, and the CO time. Figure 2 represents the Current Map of D45T which was completed right after the plant floor visits and interviews.

At the bottom of the current state map is the timeline summative indicator. It represent production waiting time (in days), which is obtained by summing the lead-time numbers from each inventory triangle before each process.

The CT for each process is the average CT, which was determined by using actual data from the company. To reduce the Non Value Added activities which was obvious in OP4/1, OP4/2, OP5 to OP6, the new improvised process flow was introduced and the before and after process flow changes made are as shown in Figure 3b.

3.5. Work measure – Takt time

Drawing the Future State Map target for a lean flow through the production line and the elimination of the root causes of the wastes identified. Once the Key characteristics of the Future State are identified and in progress are reviewed with the top management to obtain input and gain mutual agreement on the direction of the Future State. Looking at the current state map for SMC several things showed up: (a) intermediate inventories between machines, (b) the difference between the total production lead-time (54 seconds) and the value added time (54 seconds), which is under 10% of the total, and (c) nonsystematic manual handling. Therefore, to create an ideal future state map the team try to identify lean manufacturing tools to drive these down, apart from looking at the schedule across the D45T production line. The team followed a system of series of structured questions; to allow them to critic and produce an ideal future state map that will help in eliminating or at least reducing different types of waste in the current manufacturing system. The questions involved during the walk-about on the production flow were based on the following targets;

Question 1: What is the Takt time?

Question 2: What are the bottleneck and constraints found?

Question 3: Where can inventory (or queue time) be reduced

Question 4: Where can you improve flow?

Question 5: Potential process improvement for future state design

From the German word, takt is the word for the wand a conductor uses to control his orchestra’s speed, beat and timing. In manufacturing, it refers to the frequency of a part or component must be produced to meet customers’ demand. The formula applied in the takt time calculation is the time available (per shift) divided by the demand (per shift). For example: 22,000 seconds (time available) ÷ 200 pieces (demand) = 110 seconds/piece.

This takes into account average productive, working time of manufacturing process. The importance of measuring takt time is due to the costs and inefficiencies factors in producing ahead of demand, which include:

• Storage and retrieval of finished goods

• Premature purchasing of raw materials

• Premature spending on wages

• The cost of missed opportunities to produce other goods

• Capital costs for excess capacity

For D45T production line, volume demands changes slightly every month. It means the takt time is also changing. The table below showed the takt time production of Front Disc D54T September to December 2011. Calculation refers on 2 shifts with total of 16.5 working hours per day.

History data referred includes the set-up times and the machine process time and the individual processing data. With reference to D45T workflow, operators and machines referred are as according to the current layout. With reference to Figure 5 below, Operator 1 involved directly with OP6, OP7 and OP8 while Operator 2 involved mainly with OP3, OP4/1, OP4/2 and OP5.

a) Bottlenecks or constraints

In determining the presence of bottlenecks or constraints in the line, at any point where the CT is more than the takt time, the process is potential a candidate, this could cause work in progress (WIP) or extra processing time. CT in this production line is the period required to complete one of an operation, or to complete a function, job, or task from start to finish. Cycle time is used in differentiating total duration of a process from its run time. In manufacturing, cycle time is the total it takes to produce an order.

Cycle Time (CT) = Machine Time + Man Time

All information is respectively connected and shows the scheduled planning independently. Total man and machine time of previous process layout and machining method showed total of 443.75s time consumption to produce a unit of D45T.

4. Assessment and Results

The goal of the project was to identify the potential advantage from implementing of lean and to develop a pleasant future state map. The team focused on three lean manufacturing techniques of which productions leveling through minimizing process WIP, improvement of takt time and minimizing handling to eliminate or at least reduce changeover/handling time.

4.1. Stacking

Observations showed that stacking of parts on the conveyor after machining completed is one of the major problems that can see in the production line. Stacking effected the part quality as it caused dented and scratches. As a result, a quick fix solution was implemented whereby a warning signage at the area production line was produced as reminder to operators so they are warned not to repeat the action and briefing on the effect of stacking and non-conformance issue with respect to deterioration on quality of product was delivered by the respective supervisors.

4.2. Work in Progress (WIP)

One of factors to maintain the quality product is to reduce or eliminate WIP. For each machining processes, every machines have their own standard or limit WIP at transfer conveyor. If the WIP are over the limit allowed, the line will automatically brought to a stop hence at the end of the day; the production line cannot produce the product according to the capacity planning. Secondly, the method applied in positioning the line WIP was also being observed. Poor positioning could cause damage to the product thus be rejected for poor quality. Figure 4 described both conditions of stacking and WIP control. As a result, the team came up with a stand to put finish good rack. The main function for this stand exactly is to make work easier to operator. It was ergonomically designed with an adjustable height to eliminate the back pain of operator during loading of the finish good into the rack.

4.3. Process Cycle Time (CT)

The cycle time of one machine is according to man time and machine time. When both this time is added it will become cycle time and from cycle time, it will affect the capacity output of one machine. From the study of time measurement of both operators, the process work flow for operator 1 and 2 and the capacity of the production line, the overall capacity output of current D45T can be shown in the following Table 2. Jig and fixtures is the most important part in machine. It used to hold part in machine and in the same time, design of jig is according to the area that raw material wants to be machining. During the assessment, it is monitored that the operator spent too long time at station OP4/2 machine to load and unload part. This resulted in having high value of man time. At the same station, it was also observed that the man time is too long (idle time) due to the movement of operator when unloading part from machine and he had to turn back to OP3 conveyor to pick up a fresh part. These motions are wasting the operator time and increase the handling time (waste) further than required. To resolve the matter, the team separated the process on OP40/1 to drilling only and OP40/2 to do tapping. The result showed that the work flow became a one direct flow instead of a zigzag motion process. This eased the operator movement and able to control the quality and productivity of worker and product.

From the separation of OP4/1 and OP4/2 to become dedicated rather than sharing, controlling stacking and conveyor system, the new CT was measured and tabulated as in the following Table 3.

The total reduction of man time was at 15.99s or 16.9% while the machine time was reduced to 299.832s or 14.17% compared to original processing method.

4.4. Work Instruction

Work Instruction, Standard Work or Standard Operating Procedure (SOP) is the method that effective iteration of the combination of manpower, materials and machinery, and methods. The stations in D45T production line do have SOPs however, the operator have limited access to read them due to machine blocking their views. Secondly, the standard of the SOP available on the floor is questioned in terms of their effectiveness towards the operators’ quality of work. The faded condition, small lettering and lack of pictorial guide made the SOP less important to the operators. New updated SOP were established and located on a stand within the operator view range. Pictures were added into the SOP to ease operators understanding and comprehension.

Conclusions

The use of the VSM improved the approach in LP initiatives as it reveals obvious and hidden waste that affected the productivity of D45T production. There is a significant amount of the time products spent on the production system usually was waiting and non-value added. Quantitative evidence showed that many of the Lean tools have an expected impact related to the reduction of this waiting time. The evaluation of these improvements through the use of the CT evaluation highlights the economic impact of time improvements. The VSM applied to assess the expected impact of a change in the production process resulted in savings (lower rejection rates) and to a certain extent, a positive view was due to the fact that there were substantial gaps between standardized work and real work – this gap meant that workers did not follow strictly assembly standards and improvising the SOP could be a key driver in continuous improvement sustainability on the production floor as operators are fully aware on the long-term commitment to practice Lean.


Related Solutions

QUESTION 2 Study a manufacturing or industrial process of your choice. 2.1 Report on the level...
QUESTION 2 Study a manufacturing or industrial process of your choice. 2.1 Report on the level of automation and various actuators used giving justification. (10) 2.2 Identify processes where adaptive, feedforward and regulatory control are used. (10) 2.2 Explain the components used safety monitoring, diagnostics and how maintenance is achieved.
Multiple Choice question on Auditor's Report
The section of the annual report that is the report of the independent registered public accounting firm is often referred to as the  A. Auditor's Report B. Management's discussion and Analysis of Financial condition and results           of operations Report C.Business Overview Report D.Notes to Financial statements Report
choose any organisation of your choice be it service or manufacturing related, investigate the following; 1,...
choose any organisation of your choice be it service or manufacturing related, investigate the following; 1, identify clearly and state the organisation's product and service and the customers for those product and or services
Using a Python environment of your choice – Create the following three dictionaries: Gary, Alice, and...
Using a Python environment of your choice – Create the following three dictionaries: Gary, Alice, and Tyler Gary = { "name": "Gary", "homework": [90.0,97.0,75.0,92.0], "quizzes": [88.0,40.0,94.0], "tests": [75.0,90.0] } Alice = { "name": "Alice", "homework": [100.0, 92.0, 98.0, 100.0], "quizzes": [82.0, 83.0, 91.0], "tests": [89.0, 97.0] } Tyler = { "name": "Tyler", "homework": [0.0, 87.0, 75.0, 22.0], "quizzes": [0.0, 75.0, 78.0], "tests": [100.0, 100.0] } Insert one additional (new) dictionary of your choice Create a new list named students that...
Using a Python environment of your choice – Create the following three dictionaries: Gary, Alice, and...
Using a Python environment of your choice – Create the following three dictionaries: Gary, Alice, and Tyler Gary = { "name": "Gary", "homework": [90.0,97.0,75.0,92.0], "quizzes": [88.0,40.0,94.0], "tests": [75.0,90.0] } Alice = { "name": "Alice", "homework": [100.0, 92.0, 98.0, 100.0], "quizzes": [82.0, 83.0, 91.0], "tests": [89.0, 97.0] } Tyler = { "name": "Tyler", "homework": [0.0, 87.0, 75.0, 22.0], "quizzes": [0.0, 75.0, 78.0], "tests": [100.0, 100.0] } Insert one additional (new) dictionary of your choice Create a new list named students that...
Select one (1) project from the working or educational environment of your choice and specify the...
Select one (1) project from the working or educational environment of your choice and specify the main work process (e.g., suppliers and customers involved, work flow, etc.) of the project that you have selected. Next, suggest at least two (2) actions that a manager can take in order to improve the work process of the project in question. Provide a rationale for your response. Post the link
QUESTION 1 (10 marks) (12 minutes) Answer the following multiple-choice questions. Indicate your choice by selecting...
QUESTION 1 (12 minutes) Answer the following multiple-choice questions. Indicate your choice by selecting only one option from the four options given for each question answered. (a) Which one of the following is not considered to be an enhancing qualitative characteristic to ensure the usefulness of information that is already relevant and faithfully represented in terms of The Conceptual Framework for Financial Reporting 2018? 1) Completeness; 2) Comparability; 3) Timeliness; 4) Understandability. (b) Which one of the following is not...
QUESTION 1 (10 marks) Answer the following multiple-choice questions. Indicate your choice by selecting only one...
QUESTION 1 Answer the following multiple-choice questions. Indicate your choice by selecting only one option from the four options given for each question answered. (a) Which one of the following is not considered to be an enhancing qualitative characteristic to ensure the usefulness of information that is already relevant and faithfully represented in terms of The Conceptual Framework for Financial Reporting 2018? 1) Completeness; 2) Comparability; 3) Timeliness; 4) Understandability. (b) Which one of the following is not an objective...
Question 1 1.1 Company A owns 60% of Company B and Company B owns 30% of...
Question 1 1.1 Company A owns 60% of Company B and Company B owns 30% of the ordinary shares of Company C Discuss the theory that refers to this situation and the degree of influence and control that Company A has over both the companies. 1.2 Company X owns 40% of Company Y and Company Y owns 30% of the ordinary shares of Company Z Discuss the theory that's refers to this situation and the degree of influence and control...
Answer the following questions: Question 1: Using your knowledge of the college environment, determine the functional...
Answer the following questions: Question 1: Using your knowledge of the college environment, determine the functional dependencies that exist in the following table. After determining the functional dependencies convert this table to an equivalent collection of tables that are in third normal form. Student (StudentNum, StudentName, NumCredits, AdvisorNum,AdvisorName, DeptNum, DeptName, AdvisorNum, AdvisorName, DeptNum, DeptName, (CourseNum, Description, Term, Grade)) : Draw an ERD for the case given in Question 1.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT