A technologist can work not more than 8 hours a day. In one day he can check upto 8x60/10 = 48 samples. 1% of 200000 becomes 2000 samples. It is required more than 40 sample tester to accomplish the target of 1% .

My recommendation would be to compromise 1min of production. As at each 1 min spoins will be checked by experts simultaneously. Thus if one expert finds a fault, all products in that 10 min period will be rejected. So in Three shift duty we need 30 experts to test the samples. By this method maximum loss can be of 10 minutes 59 seconds and minimum 10 min. If we use just one tester at a time, loss would be of 19min 59sec max and min 10min. As spoon production is a continuous type production, if one machine get some problem the error will remain untill solved.

But in today's testing process are totally different. We check all the products by means of x-ray, MRI , Laser and proximity sensors. Those are fully automated and computerised. So no need of manual testing unless the testing machine is having error..

But at the end all these are required to comply with the requirements of production and the cost management and the accuracy of machines.


Related Solutions

A new production process is being contemplated for the manufacture of stainless steel bearings. Measurements of...
A new production process is being contemplated for the manufacture of stainless steel bearings. Measurements of the diameters of random samples of bearings from the old and new processes produced the following data (all in mm): Old Old New 16.3 15.9 15.9 16.2 15.8 16.0 16.2 15.8 16.1 16.1 16.0 16.1 15.7 15.8 15.8 16.0 15.9 16.2 16.1 15.9 16.3 15.7 16.1 16.2 15.8 15.8 15.7 15.8 15.8 16.2 15.7 16.3 . A. Can you conclude that the variances between...
A sample of stainless steel was stored in a freezer with a temperature of -4.0°C. After...
A sample of stainless steel was stored in a freezer with a temperature of -4.0°C. After removing it from the freezer, the aluminum is placed in 1982 mL of water at room temperature (25.0°C). After several minutes thermal equilibrium is achieved at 21.4°C. What is the mass of the stainless steel sample? Please show all work with appropriate units.
To clean the impeller blades of a stainless steel tank, plant technicians pour 210.0 L of...
To clean the impeller blades of a stainless steel tank, plant technicians pour 210.0 L of a 240.0 g HNO3/L solution in a 820.0-L tank to soak. When the tank needed to be emptied, the tank was first filled with water entering at a rate of 1.90 L/s. (Figure 1). At t = tF, the tank is completely full of solution. At this point water continued to enter the tank at the same rate, but solution was also drained from...
10. The test taking times (in minutes) for Algebra students from my morning, afternoon and evening...
10. The test taking times (in minutes) for Algebra students from my morning, afternoon and evening classes are listed below. Use a 0.05 significance level to test the claim that the different classes have the same test taking time. Morning Class 24   21   23   30   23 Afternoon Class 25   31   23   20   28 Evening Class 23   27   22   30   20 USE A 0.05 SIGNIFICANCE LEVEL TO TEST THE CLAIM: H0: All the means are the same. (generic null hypothesis) H1:At...
A manufacturer of steel wants to test the effect of the method of manufacture on the...
A manufacturer of steel wants to test the effect of the method of manufacture on the tensile strength of a particular type of steel. Four different methods have been tested and the data shown in Table 1. (Use Minitab) Develop the ANOVA table and test the hypothesis that methods affect the strength of the cement. Use a = 0.05 Use the Tukey’s method with a =0.05 to make comparisons between pairs of means. Construct a normal probability plot of the...
U.S. Steel is considering a plant expansion to produce austenitic, precipitation hardened, duplex, and martensitic stainless...
U.S. Steel is considering a plant expansion to produce austenitic, precipitation hardened, duplex, and martensitic stainless steel round bars that is expected to cost $15 million now and another $10 million 1 year from now. If total operating costs will be $1.5 million per year starting 1 year from now, and the estimated salvage value of the plant is virtually zero, how much must the company make annually in years 1 through 8 to recover its investment plus a return...
U.S. Steel is considering a plant expansion to produce austenitic, precipitation hardened, duplex, and martensitic stainless...
U.S. Steel is considering a plant expansion to produce austenitic, precipitation hardened, duplex, and martensitic stainless steel round bars that is expected to cost $13 million now and another $10 million 1 year from now. If total operating costs will be $1.5 million per year starting 1 year from now, and the estimated salvage value of the plant is virtually zero, how much must the company make annually in years 1 through 10 to recover its investment plus a return...
The Clap Chemical Company needs a large insulated stainless steel tank to expand its plant. A...
The Clap Chemical Company needs a large insulated stainless steel tank to expand its plant. A recently closed brewery has offered to sell their tank for $15,000 delivered. The price is so low that Clap believes it can sell the tank at any future time and recover its $15,000 investment. Installing the tank will cost $9000 and removing it will cost $5000. The outside of the tank is covered with heavy insulation that requires considerable maintenance. This will cost $3500...
Five students were tested before and after taking a class to improve their study habits. They...
Five students were tested before and after taking a class to improve their study habits. They were given articles to read which contained a known number of facts in each story. After reading the stories, the students listed as many facts as they could recall. The following data were recorded. This a multiple choice question!         Before          After           10                  15           12                  14           14                  17           16                  17           12                  20 The degrees of freedom for this sample are      ...
Question Set 3. A small manufacturing plant produces specialized stainless steel valves for high-pressure steam systems....
Question Set 3. A small manufacturing plant produces specialized stainless steel valves for high-pressure steam systems. Each valve costs $2000 to produce. The plant incurs $1,200,000 in fixed annual costs. The plant sells the valves directly to power plants for $6400 each. For this question set, use the following formulas: [Total Profit] = [Total Revenue] – [Total Cost] [Total Revenue] = [Production] x [Unit Revenue] [Total Cost] = [Production] x [Variable Unit Cost] + [Fixed Costs] 1. Create a data...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT