Texas Co. established the following overhead cost pools and cost drivers: Budgeted Estimated Overhead Cost Pool Overhead Cost Driver Cost Driver Level Quality controls $780,000 # of inspections 26,000 inspections Machine setups $720,000 # of setups 12,000 setups Other overhead costs $900,000 # of machine hrs 50,000 machine hrs Total overhead costs $2,400,000 A recent order for sailboats used: Quality inspections 750 inspections Machine setups 500 setups Machine hours (MHs) 2,400 machine hours Required: a. What is the overhead rate per machine hour if the number of machine hours (MHs) is used as a single cost driver under traditional costing system?
b. Utilizing traditional costing, how much overhead is assigned to the order based on machine hours as a single cost driver?
c. Utilizing ABC, how much total overhead is assigned to the order?
A) Overheads rate per machine hour if the number of machine hours(MH) is used as single cost drivers is as follow
Particulars | Amount |
Total cost (1) | $2400000 |
Machine Hours (2) | 50000 |
Overheads rate per machine hour(1/2) | $48 |
B) Overhead cost assigned to new order on the basis of traditional costing is as follow
Particulars | Amount |
Total Machine Hours required for new order ( 3) | 2400 |
Overheads rate per machine hour(4) | $48 |
Total overhead Cost Assigned {3*4} | $115200 |
C) Overhead cost assigned to new order on the Basis of ABC Costing is as follow
Step1- Calculation of ABC rate
Cost centre | Total Cost (5) | Basis (6) | overhead rate per cost centre (5/6) |
Inspection Cost | $780000 | 26000 Inspection | $30 per inspection |
Machine Cost | $720000 | 12000 Setups | $ 60 per Setups |
Other cost | $900000 | 50000 MLH | $18 per Machine Hour |
Step 2- Calculation of overhead cost allocated to new order
Cost centre | Total Requirment for new order (7) | Overhead rate per cost centre (8) | Total Cost (7*8) |
Inspection Cost | 750 Inspection | $30 per inspection | $22500 |
Machine Cost | 500Setups | $ 60 per Setups | $30000 |
Other cost | 2400 Machine Hours | $18 per Machine Hour | $43200 |
Total cost | $95700 |
So overhead cost allocated to new order as per ABC Costing is $ 95700