1).Lane width of Carriageway
The standard lane width of the Project Highway shall be 3.5m

Median
Table 2.2: Width of Median
Minimum Width of Median (m) depends on the Type of Section Plain and Rolling terrain mountainous an steep terrains

shoulders

the shoulder width on the outer side of the road shall be provided as

1).the road way width depends on the width of carriage way , median and side shoulders

2). on horizontal curve extra width provided as per guidelines

FOR GIVEN NOTHING MENTIONED ABOUT TERRAIN CONDITIONS

so if we can assume it is a plain and rolling terrain

Adopted lane width for national highways is India is 3.5m. Accordingly, total width of six lane highway becomes 21m. In addition to this, as per recent Indian Road Congress’s lane manual IRC SP-73:2015, 1.5 m paved shoulder and 2.4 m earthen shoulder should be provided on each side for two lane roads. median provided at non signal areas should be 7m.So total width of 6 lane road becomes 6(3.5)+2(1.5+2.4)+7 = 35.8m.


Related Solutions

A divided multilane highway in a recreational area (fp=0.90) has four lanes (two lanes in each...
A divided multilane highway in a recreational area (fp=0.90) has four lanes (two lanes in each direction) and is on a rolling terrain. The highway has 3 m lanes with a 1.8 m right-side shoulder and a 0.9 m left-side shoulder. The posted speed limit is 80 km/h. Formerly there were 3 access points per km, but recent development has increased the number of access points to 9 access points per km. Before development, the peak-hour factor was 0.90 and...
The following data is given for a horizontal highway curve having 2 lanes with Lane width...
The following data is given for a horizontal highway curve having 2 lanes with Lane width of 3.65 m each: Ruling design speed is 110kmph, Allowable rate of change of circular acceleration = 0.5 to 0.8. Allowable rate of introduction of super-elevation = 1 in 144, Take maximum allowable superelevation and lateral frictional co-efficient is 0.15. Calculate the length of a transition curve for following cases. Rate of change of centrifugal acceleration (C). Rate of introduction of super-elevation. Using empirical...
The right of way and the road bed for a new highway will cost $4.5 million.The...
The right of way and the road bed for a new highway will cost $4.5 million.The pavement will cost $2.5 million and it has a much shorter life of 20 years. if the discount rate is 9% find the projects capitalized cost?
Freeway highway analysis • six-lane freeway, three -lane in each direction • Lane width = 11...
Freeway highway analysis • six-lane freeway, three -lane in each direction • Lane width = 11 ft; Right-side lateral clearance = 4 ft • Peak hour direction demand volume = 2,500 veh/h • Traffic composition: 11% trucks and 6% RVs • PHF = 0.97, Level Terrain; 24 ramps in six miles segment • Commuter traffic Determine the level of service (LOS)
The total risk measures the total variability or volatility of an investment. Which of the following is not a way to estimate total risk?
The total risk measures the total variability or volatility of an investment. Which of the following is not a way to estimate total risk?     By forming an objective probability distribution based on historical data.    By assigning subjective probabilities to various possible outcomes.     By calculating the beta of the investment.    None of the above arrives at an estimate of total risk.
A westbound section of freeway currently has three 12-ft wide lanes, a 6-ft right shoulder, and...
A westbound section of freeway currently has three 12-ft wide lanes, a 6-ft right shoulder, and no ramps within 3 miles upstream and downstream of the segment midpoint. It is on rolling terrain with 10% heavy vehicles and is operating at capacity with a peak-hour factor of 0.9. If the road is expanded to four 11-foot lanes with a 2-foot right shoulder, and traffic after the expansion is projected to increase by 10% with the same heavy vehicle percentage and...