A proposed re-lamping project includes 200, 2 lamp fixtures. The existing lamps are standard 40 W...

A proposed re-lamping project includes 200, 2 lamp fixtures. The existing lamps are standard 40 W fluorescent bulbs with a lifespan of 20,000 hours that cost $1.25 each. The proposed replacement lamps would be high efficiency devices that give the same light output for only 34 W input with a life of 22,000 hours. These lamps cost $2.50 each. The fixtures are on 250 days for 12 hours a day during a year. Electricity costs are 0.12 $/kWh and 180 $/kW-year for energy and demand respectively.

a)Compute the annual energy savings (kWh)

b) compute the power demand reduction in kW per year

Solutions

Expert Solution


Related Solutions

Japan Company produces lamps that require 2 standard hours per unit at a standard hourly rate...
Japan Company produces lamps that require 2 standard hours per unit at a standard hourly rate of $17.20 per hour. Production of 5,500 units required 10,780 hours at an hourly rate of $16.70 per hour. What is the direct labor (a) rate variance, (b) time variance, and (c) total cost variance? Enter favorable variances as negative numbers. a. Direct labor rate variance $ Unfavorable b. Direct labor time variance $ Unfavorable c. Total direct labor cost variance $ Unfavorable
Year   Project A   Project B 0 –$200   –$200    1 80   100    2 80 100...
Year   Project A   Project B 0 –$200   –$200    1 80   100    2 80 100    3 80 100    4 80       a)   If the opportunity cost of capital is 10%, which of these projects is worth pursuing? Explain. b)   Suppose that you can choose only one of these projects. Which would you choose? The discount rate is still 10%. Justify your reasoning. c)   Which project would you choose if the opportunity cost of capital were 16%?...
Exercise 2: A new IS project has been proposed that is expected to produce not only...
Exercise 2: A new IS project has been proposed that is expected to produce not only cost savings but also an increase in revenue. The initial capital cost to establish the system is estimated to be $500,000. The remaining cash flow data is presented in Table 2.10. Using a spreadsheet program, calculate the payback period, internal rate of return, and net present value for this project. Assume that the cost of capital is 7% and the effective tax rate is...
Tampa Company is analyzing a proposed 3-year project using standard sensitivity analysis. The company expects to...
Tampa Company is analyzing a proposed 3-year project using standard sensitivity analysis. The company expects to sell 14,000 units, ±4 percent. The expected variable cost per unit is $10 and the expected fixed costs are $45,000. The fixed and variable cost estimates are considered accurate within a ±5 percent range. The sales price is estimated at $16 a unit, ±5 percent. The project requires an initial investment of $120,000 for equipment that will be depreciated using the straight-line method to...
Lawrence is analyzing a proposed 3‐year project using standard sensitivity analysis. The company expects to sell...
Lawrence is analyzing a proposed 3‐year project using standard sensitivity analysis. The company expects to sell 18,000 units, ±4 percent. The expected variable cost per unit is $12 and the expected fixed costs are $60,000. The fixed and variable cost estimates are considered accurate within a ±5 percent range. The sales price is estimated at $17 a unit, ±5 percent. The project requires an initial investment of $162,000 for equipment that will be depreciated using the straight‐line method to zero...
Broadwing Corporation is analyzing a proposed 5-year project using standard sensitivity analysis. The company expects to...
Broadwing Corporation is analyzing a proposed 5-year project using standard sensitivity analysis. The company expects to sell 30,000 units, ±5 percent. The expected variable cost per unit is $22.40 and the expected fixed costs are $180,000. The fixed and variable cost estimates are considered accurate within a ±5 percent range. The sales price is estimated at $42.00 a unit, ±5 percent. The project requires an initial investment of $350,000 for equipment that will be depreciated using the straight-line method to...
Insight Enterprise is analyzing a proposed 3-year project using standard sensitivity analysis. The company expects to...
Insight Enterprise is analyzing a proposed 3-year project using standard sensitivity analysis. The company expects to sell 17,000 units, ±4 percent. The expected variable cost per unit is $12 and the expected fixed costs are $60,000. The fixed and variable cost estimates are considered accurate within a ±5 percent range. The sales price is estimated at $17 a unit, ±5 percent. The project requires an initial investment of $162,000 for equipment that will be depreciated using the straight-line method to...
PROBLEM 1: A standard split-spoon penetration sampler is proposed for a geotechnical field exploration project. Calculate...
PROBLEM 1: A standard split-spoon penetration sampler is proposed for a geotechnical field exploration project. Calculate the area ratio of the sampler if its outside and cutting-edge diameter are 45 mm and 40 mm respectively PROBLEM 2: A soil sample has a mass of 2290 g and a volume of 0.00115 cu.m. After being completely dried in an oven, the mass of the sample is found to be 2035 g. If Gs=2.68, determine the air content in percent PROBLEM 3:...
Norfolk Company is analyzing a proposed 3-year project using standard sensitivity analysis. The company expects to...
Norfolk Company is analyzing a proposed 3-year project using standard sensitivity analysis. The company expects to sell 22,000 units, ±4 percent. The expected variable cost per unit is $13.2 and the expected fixed costs are $51,000. The fixed and variable cost estimates are considered accurate within a ±5 percent range. The sales price is estimated at $16.8 a unit, ±5 percent. The project requires an initial investment of $204,000 for equipment that will be depreciated using the straight-line method to...
Maytag Company is analyzing a proposed 5-year project using standard sensitivity analysis. The company expects to...
Maytag Company is analyzing a proposed 5-year project using standard sensitivity analysis. The company expects to sell 18,000 units, ±5 percent. The expected variable cost per unit is $10.50 and the expected fixed costs are $28,000. The fixed and variable cost estimates are considered accurate within a ±5 percent range. The sales price is estimated at $16.70 a unit, ±5 percent. The project requires an initial investment of $198,000 for equipment that will be depreciated using the straight-line method to...