Hi Friend,
Please refer below case study for under standing:
Like many food producers, our customer has a long supply chain and uses many resources (meat, equipment, employee labor, packing materials, etc.). Additionally, it’s common to have more than 300 SKUs with huge variations on the amount of resources consumed per product and per department. Thus, it’s challenging to assign specific costs to each product. As result of these issues, plant management could not determine which products were making money, and which were losing money.
Our customer operates in a highly volatile environment where meat prices fluctuate dramatically. Management needs information available to them to help guide them in making decisions on which products can be culled and which should be pushed during various market conditions.
Prior to installing ABC costing solution, our customer could not accurately determine the value of Work-in-Progress (WIP) and Cost-of-Goods-Sold (COGS), which are required for monthly reporting in the accounting system. The ERP system they were using from SAP could not provide this information because most ERP systems do not seamlessly integrate into plant floor operations systems. Also, the auditors would not accept the spreadsheets plant employees were using because they could not provide full traceability and validate how their numbers were calculated.
WHY NOT TRADITIONAL COSTING?
Traditional costing assigns costs to products based on an average overhead rate using budgeted and estimated costs and volumes to determine what the standard cost should be. This application does not provide an understanding of what the real and actual costs are, only the variances from standard. Standard costing variances could fluctuate dramatically from month-to-month without ever providing any answers on real costs. With traditional costing, management’s attention is focused on variances from “the standard,” forcing an acceptance of the “standard” as the norm, not the actual costs.
Standards are generally set once a year during budget season and mostly not changed until next year’s budget cycle. So, when manufacturing conditions, input costs, capacity utilization and other major impacts happen during a year, management has no perspective on what the impact of these changes are (unless they choose to recalculate standards, which does not often happen).
Activity-based costing (ABC) changes all this by providing actual month-to-month costs, empowering management to review and adapt to changing conditions by adjusting prices, manufacturing mix, product selection and other necessary changes. ABC assigns costs to each activity in the manufacturing process, providing management with step-by-step views of how costs accumulate as products move through the plant and providing a focus on how resources are used.
SOLUTION
Company implemented an activity-based costing system that traces products step-by-step through the production process, enabling plant and financial managers to understand the cost of every activity, process step and all the components of a product’s total cost.
Company’s costing solution provides a financial perspective on process yields and all production losses. The uniform, consistent structure of the system helps production and finance managers “talk the same language” while working together creating continuous improvement to improve productivity and profitability. The system is auditable with full traceability of costs from product back to all inputs.
Features
Benefits
Company combines the plant-floor data managed by our MES with the accounting data housed in SAP’s ERP system to assign values and distribute costs across activities, departments, and products. All transactions have the same basic logic, tracking inputs and outputs for each department and each product. All data is validated and provides complete traceability.
RESULTS
For the first time, our customer’s management team had access to accurate, provable data to aid in decision making. Prior to installing our solution, our customer’s manufacturing data did not balance. Scales weren’t working properly. Products were either not being measured or being measured twice. We recalibrated their scales, began validating their information, and checked the validity of results in the costing system. There is now a much higher level of accuracy in their data.
This empowers plant management to
This project revealed significant waste in our customer’s processes related to packing material waste, DOAs, yield losses and rework. For example, we identified a $40,000-per-month loss in packing materials due to poorly functioning machines. Wherever our team identified waste, we assigned specific values to that waste in the process, and the system calculated the loss automatically. Plant management could quickly identify areas of potential savings.
Our valuation reports can be used for audits as well. Our reports provide an audit trail so auditors can confidently sign off on the reports. Prior to installing our system, the people managing the plant could not produce accurate valuation figures because their spreadsheets were not accepted by the auditors due to lack of validation. Our system is fully integrated into the plant’s processes. Our system provides full traceability as to where an item is and why it’s there. The reports also show how calculations were done, how overheads are allocated, etc.
Example for ABC Costing understanding:
You determine that the cost driver impacting your utility bill is the number of direct labor hours worked. The number of direct labor hours worked totaled 1,000 hours for the year.
Divide your total utility bill by your cost driver (the number of hours worked) to get your cost driver rate. Your overhead application rate is $20 ($20,000 / 1,000 hours).
For this particular product, you used utilities for 3 hours. Multiply the hours by the cost driver rate of $20 to get $60.
Indirect Cost examples for ABC Costing:
Depreciation
Machine setupp cost
Electricity expenses
Factory rent
Consumables
Packing & Shipping expenses etc.