In: Accounting
1. A job cost sheet of Vaughn Company is given below.
Job Cost Sheet |
||||||
---|---|---|---|---|---|---|
JOB NO. | 469 |
Quantity |
2,500 |
|||
ITEM | White Lion Cages |
Date Requested |
7/2 |
|||
FOR | Todd Company |
Date Completed |
7/31 |
|||
|
Direct |
Direct |
Manufacturing |
|||
7/10 | $700 | |||||
12 | 940 | |||||
15 | $500 | $625 | ||||
22 | 300 | 375 | ||||
24 | 1,650 | |||||
27 | 1,510 | |||||
31 | 500 | 625 |
Cost of completed job: | ||
Direct materials | ||
Direct labor | ||
Manufacturing overhead | ||
Total cost | ||
Unit cost |
Answer the following questions.
(a) What are the source documents for direct materials, direct
labor, and manufacturing overhead costs assigned to this job?
Source Documents | ||
---|---|---|
Direct materials | select the source document Materials requisition slipsPredetermined overhead rateTime tickets | |
Direct labor | select the source document Materials requisition slipsPredetermined overhead rateTime tickets | |
Manufacturing overhead | select the source document Materials requisition slipsPredetermined overhead rateTime tickets |
(b) What is the predetermined manufacturing overhead rate?
(Round answer to 0 decimal places, e.g
135.)
Predetermined manufacturing overhead rate | enter the predetermined manufacturing overhead rate in percentages rounded to 0 decimal places | % |
(c) What are the total cost and the unit cost of the completed job?
(Round unit cost to 2 decimal places, e.g.
1.25.)
Total cost of the completed job | $enter the total cost of the completed job in dollars | |
---|---|---|
Unit cost of the completed job | $enter the unit cost of the completed job in dollars rounded to 2 decimal places |
2. Kevin Hall and Associates, a CPA firm, uses job order costing to capture the costs of its audit jobs. There were no audit jobs in process at the beginning of November. Listed below are data concerning the three audit jobs conducted during November.
Wildhorse Inc. |
Blossom Inc. |
Crane Inc. |
||||
---|---|---|---|---|---|---|
Direct materials | $660 | $510 | $290 | |||
Auditor labor costs | $5,900 | $7,000 | $3,675 | |||
Auditor hours | 76 | 94 | 49 |
Overhead costs are applied to jobs on the basis of auditor hours,
and the predetermined overhead rate is $54 per auditor hour. The
Wildhorse Inc. job is the only incomplete job at the end of
November. Actual overhead for the month was $12,100.
(a) Determine the cost of each job.
Cost |
||
---|---|---|
Wildhorse | $enter the cost in dollars | |
Blossom | $enter the cost in dollars | |
Crane | $enter the cost in dollars |
(b) Indicate the balance of the Service Contracts in Process
account at the end of November.
Balance in service contracts in process account | $enter the Balance in service contracts in process account in dollars |
(c) Calculate the ending balance of the Operating Overhead account
for November.
Balance in operating overhead account | $enter the Balance in operating overhead account in dollars select an option UnderappliedOverapplied |
a | ||
Direct materials | Materials requisition slips | |
Direct labor | Time tickets | |
Manufacturing overhead | Predetermined overhead rate | |
b | ||
Predetermined manufacturing overhead rate | 125% | =625/500 |
c | ||
Direct materials | 4800 | =700+940+1650+1510 |
Direct labor | 1300 | =500+300+500 |
Manufacturing overhead | 1625 | =625+375+625 |
Total cost of the completed job | 7725 | |
Unit cost of the completed job | 3.09 | =7725/2500 |
Question-2
a | ||||
Wildhorse | 10664 | |||
Blossom | 12586 | |||
Crane | 6611 | |||
b | ||||
Balance in service contracts in process account | 10664 | |||
c | ||||
Balance in operating overhead account | 274 | Underapplied | ||
Workings: | ||||
Wildhorse | Blossom | Crane | Total | |
Direct materials | 660 | 510 | 290 | 1460 |
Auditor labor costs | 5900 | 7000 | 3675 | 16575 |
Overhead applied | 4104 | 5076 | 2646 | 11826 |
Total cost | 10664 | 12586 | 6611 | 29861 |
Actual overhead | 12100 | |||
Less: Overhead applied | 11826 | |||
Balance in operating overhead account | 274 | |||
Waters | Renolds | Bayfield | ||
Overhead applied | =76*54 | =94*54 | =49*54 |