Question

In: Accounting

The City of West Hutchison is constructing a new road, which it estimates will cost $7.2...

The City of West Hutchison is constructing a new road, which it estimates will cost $7.2 million. The city will finance the road with an expenditure-driven state construction grant of $1.2 million and a bond issuance of $6 million. Prepare journal entries to record the following transactions and events for the city’s Capital Projects Fund during calendar year 2019. No budgetary entries other than encumbrances should be recorded.1. The city receives $6.2 million from the bond issuance. The face amount of the bonds is $6 million.2. The city signs a contract with the lowest bidder, Mary Michel Construction, to build the road at a cost of $7.2 million. 3. The construction is complete and the city receives a bill from Mary Michel Construction for $7.1 million. A provision of the contract is that the city holds 15 percent retainage until the project is inspected and approved. 4. The city pays the amount owed to the contractor less the retainage.5. The city meets the spending provisions of the expenditure-driven construction grant and receives payment from the state.6. The city inspector approves the construction project and the contractor is paid the retainage.7. The city transfers the remaining cash balance to the Debt Service Fund

Solutions

Expert Solution


Related Solutions

You are the engineer who is responsible of constructing a new toll road. The discount rate...
You are the engineer who is responsible of constructing a new toll road. The discount rate is i=10% per year, and the study period is 30 years. Evaluate the economics of the proposal using: (a) present worth analysis (b) the conventional B/C analysis and; (c) the profitability index from in which disbenefits are not included. Initial investment: $88 million distributed over 5 years; $4 million now and in year 5 and $20 million in each of years 1 through 4....
A company is in the process of constructing a new plant at a cost of $16...
A company is in the process of constructing a new plant at a cost of $16 million. It expects the project to generate cash flows of $9 million, $6 million, and $11 million over the next three years. The cost of capital is 18.9 percent p.a. What is the net present value of this project? (in millions to three decimals)
Road Rage, Inc., is in the business of designing, constructing, and inspecting highways. Road Rage has...
Road Rage, Inc., is in the business of designing, constructing, and inspecting highways. Road Rage has publicly held company and files consolidated financial statements. In 20X1, Road Rage, through its subsidiary, Builders, Inc. (Builders), signed a fixed price contract for the construction of an interstate highway. The project was to be completed three years hence. All of the long-term projects of Builders (greater than one year) are reported on the percentage-of-completion method of accounting Under the terms of the contract,...
A car travels along a straight east-west road. A coordinate system is established on the road,...
A car travels along a straight east-west road. A coordinate system is established on the road, with x increasing to the east. The car ends up 19 mi west of the intersection with Mulberry Road. (A) If its displacement was -21 mi , how far from Mulberry Road did it start?
The Barberton Municipal division of Road Maintenance is charged with road repair in the city of...
The Barberton Municipal division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Cindy​ Kramer, road maintenance​ director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Kramer estimates that the labor hours required for the next four quarters are 7,000​, 12,000​, 19,500​, and 9,000​, respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter....
The Barberton Municipal division of Road Maintenance is charged with road repair in the city of...
The Barberton Municipal division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Cindy​ Kramer, road maintenance​ director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Kramer estimates that the labor hours required for the next four quarters are 6000​, 12000​, 19500​, and 9000​, respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter....
The Barberton Municipal Division of Road Maintenance is charged with road repair in the city of...
The Barberton Municipal Division of Road Maintenance is charged with road repair in the city of Barberton and the surrounding area. Cindy Kramer, road maintenance director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget. Kramer estimates that the labor hours required for the next four quarters are 6,000, 12,000, 19,000, and 9,000, respectively. Each of the 11 workers on the workforce can contribute 500 hours per quarter....
Assume that the finishing times in a New York City 10-kilometer road race are normally distributed...
Assume that the finishing times in a New York City 10-kilometer road race are normally distributed with a mean of 61 minutes and a standard deviation of 9 minutes. Let X be a randomly selected finishing time. a. What is the probability that a that a person running a 10-kilometer road race in New York City, will end up with finishing times average between 52 and 70 minutes for a road race? b. Find the value of the 95% percentile,...
The right of way and the road bed for a new highway will cost $4.5 million.The...
The right of way and the road bed for a new highway will cost $4.5 million.The pavement will cost $2.5 million and it has a much shorter life of 20 years. if the discount rate is 9% find the projects capitalized cost?
There is a new road project which is expected to be finished in 4 years. This...
There is a new road project which is expected to be finished in 4 years. This project has an initial cost of 1 million$. After the initial cost is paid, the road project is expected to provide 250,000$ in year 1, 300,000 in year 2, 320,000 in year 3 and 450,000 in year 4. It is known that the internal rate of return in this project 10.96%. What is the net present value?
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT