Question

In: Statistics and Probability

Use the data in the table below to set up short-run X-bar and R charts using...

Use the data in the table below to set up short-run X-bar and R charts using the DNOM approach. The nominal dimensions for each part are TA = 50, TB = 75, TC = 60, TD = 100, and TE = 125.

Sample Part M1 M2 M3
1 A 51 50 51
2 A 48 50 52
3 A 50 52 48
4 A 49 51 54
5 A 47 45 52
6 A 49 50 51
7 B 73 74 74
8 B 76 74 75
9 B 77 73 75
10 B 77 75 74
11 B 75 75 75
12 B 76 74 74
13 C 62 59 61
14 C 60 58 60
15 C 60 59 61
16 D 101 98 99
17 D 102 102 99
18 D 98 100 98
19 D 103 102 102
20 D 100 101 99
21 E 125 124 122
22 E 123 124 124
23 E 126 128 126
24 E 126 124 128
25 E 126 121 122

Solutions

Expert Solution

Sol:

step 1:calculate xi using Mi as follows

Using these values plot Xbar R chart in minitab

observing obove chart we can conclude that process is under control

If you Satisfy with Answer, Please give me "Thumb Up". It is very useful for me.
Thank you for your support.


Related Solutions

Discuss the purposes and differences between the C- charts, p-charts and X-bar and R charts. 2....
Discuss the purposes and differences between the C- charts, p-charts and X-bar and R charts. 2. Define Cp and Cpk 3. The capability index allows for some drifting of the process mean. Discuss what this means in terms of product quality output.
For these questions you answer them using one of the charts/tables listed below. Table • Bar...
For these questions you answer them using one of the charts/tables listed below. Table • Bar chart • Grouped bar chart • Segmented bar chart • Pictograms • Gantt chart • Line chart • Area chart • Pie charts • Map • Flowchart a.Data showing the growth in the number of students using PDAs during the past three years. Line Graph b. Data showing the distribution of contributions to the company's education matching gifts program by functional unit. Pie Chart...
A large bank established X-Bar and R charts for the time required to process applications for...
A large bank established X-Bar and R charts for the time required to process applications for its charge cards. A sample of five applications is taken each day. The first four weeks (20 days) of data give: X bar bar = 16 min s bar = 3 min R bar = 7 min Based on the values given, calculate the centerline and control limits for the X bar and R charts.
x bar and R control Charts A quality control inspector at the Company B has taken...
x bar and R control Charts A quality control inspector at the Company B has taken twenty-five samples with four observations each of the sample weight (g). The data are shown in the table. Construct x bar and R control charts for these data. Identify any out-of- control points. Assume these points (if any) are assignable. Remove them and recalculate the control limits. Construct the revised x bar and R control charts. Submit data (spreadsheet) and charts. Comment on the...
Using the data shown, you will create two charts. The first chart is a bar chart...
Using the data shown, you will create two charts. The first chart is a bar chart that will display % growth in different job titles between 2010 and 2020Est. The second chart will be a pie chart showing the 2020Est. Jobs in different categories as a % of overall 2020Est. jobs. Computer-Related Jobs 2010 2020 Est. % Change Systems Analysts         544,400         664,800 Software App Developers         520,800         664,500 Programmers         363,100         406,800 Network/System Admins         347,200...
Using R and the data in the table below, perform the regression of D on C...
Using R and the data in the table below, perform the regression of D on C (i.e., report the regression equation). C D 3 2 6 7 8 5 9 4 1 0 3 4 Hint: The code to enter the vectors C and D into R is: C <- c(3, 6, 8, 9, 1, 3) D <- c(2, 7, 5, 4, 0, 4) You must figure out how to obtain the regression equation from R. Enter the code below...
1. Why are X-bar and R-Charts used together? Please Explain. 2. The principal focuses and methods...
1. Why are X-bar and R-Charts used together? Please Explain. 2. The principal focuses and methods of the pioneers of scientific management, what are they?(as represented by Henry Gantt, Frederick Taylor, Frank Gilbreth,etc.). In your words, how is the modern total quality management method different from the above?
Below is table of observed count data that you would like to use to run a...
Below is table of observed count data that you would like to use to run a Chi Square Test of Independence. Based on data presented would you violate any assumptions? How do you know? Condition 1 Condition 2 Condition A 24 5 Condition B 6 7
using the mtcars data set data(mtcars) USE data in mtcars library in R 5.Use k means...
using the mtcars data set data(mtcars) USE data in mtcars library in R 5.Use k means cluster analysis. 6. Get cluster means. 7. Visualize the clustering result.
Use the data values in the table below to calculate the correlation, r, between the variables...
Use the data values in the table below to calculate the correlation, r, between the variables x and y. x y 4 12.32 5 13.1 6 16.68 7 20.26 8 22.44 9 22.72 10 23.4 11 26.98 12 28.66 Give your answer to rounded three decimal places.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT