Schematic drawings and cost estimates are characteristics of which phase found in the facility construction process?...

Schematic drawings and cost estimates are characteristics of which phase found in the facility construction process?

Group of answer choices

Programming Phase

Construction Phase

Occupancy Phase

Design Phase

Solutions

Expert Solution

Schematic drawings and cost estimates are characteristics of which phase found in the facility construction process?

Answer : Design Phase

Explanation to the answer :

What does design phase include : read below -

Normally, the conception of the project starts with the client. This is where the dream begins as well as the research for the right location and the specifications/standards that should be followed.Depending on the project, the conception stage might vary. It can take anywhere from a few days to a few months or more, depending on how imminent is the need for the completion of the project.It goes without saying that construction workers usually don’t have much input during this stage, as the ball is still in the hands of the project owner.

Once the project is closer to fruition, it is time to sit down and talk design. This is still a preliminary stage, which means that nothing is guaranteed at this point. Nevertheless, design is the stage where usually the bidding process begins.The team that is in charge of the design, led by an architect or an engineer, will need to make sure that each of the state regulations and codes is met while respecting the vision of the project owner as well as ensuring that the newly built structure will be usable.

There are normally four different steps within the design stage and they include programming and feasibility, schematic design, design development, and contract documents.During the programming and feasibility step, each of the objectives and goals of the project has to be outlined. Numerous decisions are made at this stage, including how large the building will be, how space will be used, and how many rooms will be needed.

The schematic design is a sketch that will show the space as well as materials, colors, and even textures. That sketch will be used during the design development to research the equipment needed, along with the cost for them and the materials being used.Once the contract documents are drawn up, everything is close to being finalized, because they contain the final drawings and specifications. These documents are used in the construction field by those placing bids to work on the project.


Related Solutions

Define Electrodialysis (ED), draw a schematic diagram of the process, and determine the main characteristics of...
Define Electrodialysis (ED), draw a schematic diagram of the process, and determine the main characteristics of ion exchange membranes to be used. What are the process limitations in ED systems? then differentiate between dialysis and osmosis phenomena.
Phase Diagram: A sample of moist soil was found to have the following characteristics: Volume: 0.60...
Phase Diagram: A sample of moist soil was found to have the following characteristics: Volume: 0.60 Ft3 (as sampled) Mass: 60 Lb (as sampled) Mass: 50 Lb (after oven drying) Specific Gravity: 2.65 First Question: Find a-h? (show your work) Ratio Porosity Degree of Saturation Wet density (total density) Dry density Volume of Solid Volume of Void Weight of air
a certain hospital is considering setting up a new facility. Management estimates that it will cost...
a certain hospital is considering setting up a new facility. Management estimates that it will cost $1.5 million to purchase the necessary equipment and renovate the building to support its long term care services. The projected net cash flows generated by the new facility over the next five years are given below: Year 1 -0 Year 2 $380,000 Year 3 $400,000 Year 4 $420,000 Year 5 $440,000 Assuming a five year life and 8% cost of capital, compute the net...
The construction cost of a parking facility on a local university campus is $200,000. Assume that...
The construction cost of a parking facility on a local university campus is $200,000. Assume that maintenance will begin on the facility at the end of the third year of operation, and will increase by $500/year until the end of the useful life of the facility. Maintenance costs are expected to accrue to $2,000 during the third year of operation. If the interest rate is 7%, and the facility is expected to last 25 years, find the following (5 points):...
Mass Waste Disposal Inc. is considering the construction of a facility at a cost of $20...
Mass Waste Disposal Inc. is considering the construction of a facility at a cost of $20 million. The project will produce positive cash flows of $7 million per year for the next 4 years but the 5th and final year will have a net negative cash flow of $5 million. If the reinvestment rate is 10% and the cost of capital is 9%, the MIRR of this project is ________ and the project should be ________. (accepted/rejected) Show all work...
Mass Waste Disposal Inc. is considering the construction of a facility at a cost of $20...
Mass Waste Disposal Inc. is considering the construction of a facility at a cost of $20 million. The project will produce positive cash flows of $7 million per year for the next 4 years but the 5th and final year will have a net negative cash flow of $5 million. If the reinvestment rate is 10% and the cost of capital is 9%, the MIRR of this project is ________ and the project should be ________. (accepted/rejected) Show all work...
The Owner’s ability to influence design and cost is highest at the construction phase. True False...
The Owner’s ability to influence design and cost is highest at the construction phase. True False The conceptual estimate is useful in the schematic design phase when design details are not available. True False A Cost-Plus contract is considered a reimbursable type of contract. True False An advantage of a Lump Sum Contract is that the owner assumes the risk of construction cost. True False
Which of the following is not a phase of the research process: a. Stating the study...
Which of the following is not a phase of the research process: a. Stating the study problem b. Reviewing the literature to develop a theoretical framework c. Disseminating data d. Analyzing data 39
A cost estimator for a construction company has collected the data found in the source file...
A cost estimator for a construction company has collected the data found in the source file Estimation.xlsx describing the total cost (Y) of 97 difference projects and the following 3 independent variables thought to exert relevant influence on the total cost: total units of work required (X1), contracted units of work per day (X2), and city/location of work (X3). The cost estimator would like to develop a regression model to predict the total cost of a project as a function...
creating a budget is an important part of which phase of the planning and control process?...
creating a budget is an important part of which phase of the planning and control process? a. planning b. controlling c. implementing d. executing
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT