Question

In: Accounting

Construction Toys Corp. is using a​ costs-of-quality approach to evaluate design engineering efforts for a new...

Construction Toys Corp. is using a​ costs-of-quality approach to evaluate design engineering efforts for a new toy robot. The​ company's senior managers expect the engineering work to reduce​ appraisal, internal​ failure, and external failure activities. The predicted reductions in activities over the​ two-year life of the toy robot follow. Also shown are the cost allocation rates for the activities.

LOADING...

​(Click on the icon to view the​ information.)Read the requirements

LOADING...

.

Requirement 1. Calculate the predicted quality cost savings from the design engineering work.

Predicted

Reduction in

Activity

Activity Costs

Inspection of incoming materials. . . . . . . .

Inspection of finished goods. . . . . . . . . . .

Number of defective units

discovered in-house. . . . . . . . . . . . .

Number of defective units

discovered by customers. . . . . . . .

Lost sales to dissatisfied customers. . . . .

Total predicted quality cost savings

DATA TABLE

Predicted

Activity Cost

Reduction in

Allocation Rate

Activity

Activity Units

per Unit

Inspection of incoming materials. . . . . . . . . . . . . . . . . .

310

$23

Inspection of finished goods. . . . . . . . . . . . . . . . . . . . .

310

$27

Number of defective units discovered in-house. . . . . . . . .

3,000

$19

Number of defective units discovered by customers. . . .

880

$42

Lost sales to dissatisfied customers. . . . . . . . . . . . . . .

260

$56

REQUIREMENT

1.

Calculate the predicted quality cost savings from the design engineering work.

2.

The company spent

$ 65 comma 000$65,000

on design engineering for the new toy robot. What is the net benefit of this​ "preventive" quality​ activity?

3.

What major difficulty would management have had in implementing this​costs-of-quality approach? What alternative approach could it use to measure quality​ improvement

Solutions

Expert Solution

Part 1- Calculation of predicted quality cost savings

Activity Predicted reduction in activity units (A) Allocation rate (activity cost) (B) Predicted quality cost savings (A*B)
Inspection of incoming materials 310 $23 $7130
Inspection of finished goods 310 $27 $8370
Number of defective units discovered in-house 3000 $19 $57000
Number of defective units discovered by customers 880 $42 $36960
Lost sales to dissatisfied customers 260 $56 $14560
Total Predicted quality cost savings $124020

Part 2 - Construction corp. inc.

Net Benefit design engineering for the new toy robot

Particulars Amount
Total Predicted quality cost savings $124020
Cost spent on design engineering $65000
Net Benefit of design engineering $59020

Part 3 - There are many difficulties faced by management in implementing cost of quality approach such as difficulty faced in estimating the quality cost, estimation of any design cost to be spent for quality control, allocation of various cost.

Due to these difficulties, management used to prepare the non financial data focusing on quality aspects like Experience analysis, machine brekadowns records, customer grievances.


Related Solutions

Critically evaluate the engineering, procurement and construction (EPC) contract and the engineering, procurement and construction management...
Critically evaluate the engineering, procurement and construction (EPC) contract and the engineering, procurement and construction management (EPCM) contract as used in the civil engineering industry. Critically evaluate how each contracting strategy is used in the real world
Design of Rigid pavement for new construction - USING AASHTO METHOD
Design of Rigid pavement for new construction - USING AASHTO METHOD
A Design-Bid-Build project delivery approach overlaps the design and construction phases, whereas the Design-Build approach requires...
A Design-Bid-Build project delivery approach overlaps the design and construction phases, whereas the Design-Build approach requires each phase to be completed before moving on to the next one. True False Identify ALL that apply: Under the Design-Bid-Build delivery method, there are legal contacts between which of the following. Owner-Engineer Owner-Contractor Engineer-Contractor Identify ALL that apply: The CM at Risk is responsible for: Means and Methods Quality Assurance Payment to Subcontractors Safety A General Contractor must be the employer of the...
Kallus Corp. is an industry leader in the manufacture of toys. Each year, its design staff...
Kallus Corp. is an industry leader in the manufacture of toys. Each year, its design staff comes up with new ideas that are a great success. As a result, Kallus’s sales and profits consistently exceed those of other toy manufacturers. Over the past 10 years, Kallus has earned average net profits of $189 million, compared to $122 million for the typical companyin the toy industry. Answer the following questions: a. Does Kallus have goodwill? Explain. b. Is goodwill an asset?...
Gulf Company has gathered the following information on quality costs for the year 2017: Quality engineering...
Gulf Company has gathered the following information on quality costs for the year 2017: Quality engineering of products $20,000 Quality training of employees $2,000 Net cost of scrap $30,000 Rework labor $4,500 Warranty repairs $100,000 Product recalls $200,000 Liability arising from defective products $1,000,000 Maintenance of test equipment $44,000 Quality improvement projects $55,000 Setups for testing $3,000 Supplies used in testing $5,500 Downtime caused by defects $70,000 Disposal of defective products $80,000 Assume that year sales totaled $5,000,000 Required: a....
a. Outline the approach Business Process Re-engineering (BPR) advocates regarding organization design.    b.What are the...
a. Outline the approach Business Process Re-engineering (BPR) advocates regarding organization design.    b.What are the key benefits considered forthcoming from this approach?
At the beginning of 2018, Heinz Corp. started construction on a new office building. Construction expenditures...
At the beginning of 2018, Heinz Corp. started construction on a new office building. Construction expenditures during 2018 were as follows: January 1                     $400,000 May 1                          150,000 July 1                         300,000   December 31               100,000    Heinz has the following debts outstanding during 2018; the bonds payable is directly related to the construction projects; none of the others are related to the construction project. Liability Annual Percent Loan Amount Notes Payable 4% $200,000 Bonds Payable 6% $400,000 Mortgage Payable 5% $300,000
The following information shows last year’s quality-related costs for the Madrigal Company: Quality engineering $600,000 Inspection...
The following information shows last year’s quality-related costs for the Madrigal Company: Quality engineering $600,000 Inspection of and testing of incoming materials 480,000 Warranty claims 2,814,000 Repair costs in the field 1,020,000 Product liability lawsuits 5,400,000 Statistical process control 300,000 Research of customer needs 90,000 Product recalls 2,400,000 Maintenance of test equipment 420,000 Waste 840,000 Returned products 1,440,000 Net cost of scrap 762,000 Rework costs 1,440,000 Product quality audits 570,000 Quality training 150,000 Downtime due to defects 150,000 Process control...
The following information shows last year's quality-related costs for the Tomlinson Company: Item Amount Quality engineering...
The following information shows last year's quality-related costs for the Tomlinson Company: Item Amount Quality engineering $588,000 Warranty claims               2,784,000 Product liability lawsuits 5,352,000 Research of customer needs 60,000 Maintenance of test equipment 408,000 Returned products 1,464,000 Rework costs     1,488,000 Quality training 180,000 Process control monitoring 1,260,000 Inspection of and testing of incoming materials             516,000 Repair costs in the field 996,000 Statistical process control 288,000 Product recalls   2,424,000 Waste 900,000 Net cost of scrap 828,000 Product quality audits 552,000 Downtime...
Construction Civil Engineering. Thanks A bridge replacement, including 2km approach resurfacing on each side. Question: Make...
Construction Civil Engineering. Thanks A bridge replacement, including 2km approach resurfacing on each side. Question: Make a Gantt chart of all major activities
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT