The Link can't be provided so you can find it in the document
centre of the village of the round lake beach and the multi year
capital plan is for the years from 2015- 2024.
The plan is presented in detail proving the names of the
specific projects that would be undertaken by the village and all
the ways in which they will be collecting the funds needed. The
plan talks about the following specific projects:
- The transportation system: A details
plan of how the funds will be procured over the years has been
provided. What all funds that will be used and how the money will
be collected has been described and year wise the complete road map
has been drawn as to how the development will take place over the
years and has been drawn geogrraphically on maps of the
village.
- Water System:Again a details plan of
how the funds will be procured over the years has been provided.
What all funds that will be used and how the money will be
collected has been described and year wise the complete road map
has been drawn as to how the development will take place over the
years and has been drawn geogrraphically on maps of the
village.
- Sanitary Sewer System: A details plan
of how the funds will be procured over the years has been provided.
What all funds that will be used and how the money will be
collected has been described and year wise the complete road map
has been drawn as to how the development will take place over the
years and has been drawn geogrraphically on maps of the
village.
- Storm Sewer Systm: A details plan of
how the funds will be procured over the years has been provided.
What all funds that will be used and how the money will be
collected has been described.
The funding is alot dependent upon the taxes from the people
inhabiting the place and a very small amount has been estimated as
allocations from outside. The plan is highly unrealistic as there
may be instances where the people residing the place may not choose
to pay so much or simply not buy the bonds they are expecting to
issue.