Question

In: Accounting

Part 2 – Construction Cost A sub-contractor needs to decide which companies they should hire for...

Part 2 – Construction Cost

A sub-contractor needs to decide which companies they should hire for each type of building they want to construct.

Below is the estimated time it should take (in hours) for each of the different types of buildings they work on.

Building

Excavating

Framing

Electrical

Plumbing

Finishing

Office Space

45

100

88

132

312

School

56

250

147

28

290

Apartments

84

480

75

125

244

Grocery Store

95

160

26

78

236

Below are the hourly rates for some different construction companies in the area.

Company

Bouma

Pinnacle

Rockford

McGraw

Excavating

$350

$300

$285

$245

Framing

$225

$275

$280

$280

Electrical

$405

$375

$295

$350

Plumbing

$150

$240

$225

$200

Finishing

$250

$190

$230

$215

  1. Input the information in the previous two tables in Excel. Make sure that you label all the information in your spreadsheet.

  1. Use matrix multiplication to determine which companies can complete each project at the lowest cost. Label your new matrix with the appropriate labels.

  1. Highlight the cells that give the lowest cost for each building project.

  1. Make a table that clearly identifies which company should be hired for each project.

Solutions

Expert Solution

Answer 1

By using the matrix multiplication, we get that

After the calculations we get the values as mentioned below:

Now, we get that

COST BOUMA PINNACLE ROCKFORD MCGRAW
OFFICE SPACE 171690 164960 168245 163305
SCHOOL 212085 202495 202325 203120
APARTMENT 247525 261685 264710 258690
GROCERY STORE 150480 145810 151375 143515

TOTAL COST

781,780 774,950 786,655 768,630

MCGRAW is the company can complete each project at the lowest cost.(768,630)

Answer 2

Lets Highlight the cells that give the lowest cost for each building project:

COST $ BOUMA PINNACLE ROCKFORD MCGRAW
OFFICE SPACE 171690 164960 168245 163305
SCHOOL 212085 202495 202325 203120
APARTMENT 247525 261685 264710 258690
GROCERY STORE 150480 145810 151375 143515

Answer 3

The below table shows which company should be hired for each project.

HIRED FOR PROJECT COMPANY NAME COST IN $
OFFICE SPACE MCGRAW 163305
SCHOOL ROCKFORD 202325
APARTMENT BOUMA 247525
GROCERY STORE MCGRAW 143515

Please Encourage us by Up Voting the Answer which is Very Helpful to us.
Thank You!


Related Solutions

Why should we hire you as a construction project Engineer
Why should we hire you as a construction project Engineer
In a hospital the doctor wish to decide to hire staff. He knows that he needs...
In a hospital the doctor wish to decide to hire staff. He knows that he needs to have more ward-boys every weekend on other days, but he is trying to find if the need them constant across the rest of the week. He collects data for the number of counters needed day for two months. Use α= 5%. Here are the data: (Hint: ANNOVA TEST) Mondays:        296,    243,    318,    276,    297,    329,    332,    285,    331 Tuesdays:       263,    299,   ...
1. A contractor needs water at a remote construction site for a five year project. A...
1. A contractor needs water at a remote construction site for a five year project. A pipeline from a river,six miles away, will supply the water. The cost of the pipeline and the cost of pumping the water will vary with pipe size. See table below. The contractor uses a MARR of 7%. The contractor plans to work 2000 hours per year, and that is the time the pump will run each year. At the end of five years the...
For a construction contractor the wages of carpenters would be classified as a factory overhead cost.
For a construction contractor the wages of carpenters would be classified as a factory overhead cost.
A construction contractor needs to choose between two suppliers of dump trucks. Supplier 1 has an...
A construction contractor needs to choose between two suppliers of dump trucks. Supplier 1 has an initial cost of $125,000 and annual operating cost of $25, 000 per year. Supplier 2 has initial cost $160,000 and has annual operating cost of 20,000 per year. The truck fleet has the same 10-year life forecast Based on incremental rate of return (IROR) and a MARR of 8%, and which supplier of trucks should the contractor choose? Please do not use excel.
A financial analyst needs to evaluate two independent investments and decide which projects should be purchased....
A financial analyst needs to evaluate two independent investments and decide which projects should be purchased. Project A costs $150,000 and has an IRR of 12 percent, and Project B costs $140,000 and has an IRR of 10 percent. The capital structure consists of 20 percent debt and 80 percent common equity, and its component costs of capital are rdt 5 4%, rs 5 10%, and re 5 12.5%. If the company expects to generate $230,000 in retained earnings this...
A contractor was doing the 10-year planning for a construction business, which uses a MARR of...
A contractor was doing the 10-year planning for a construction business, which uses a MARR of 15% per year. The contractor anticipates income of $150,000 per year for years 1-5, and income of $200,000 per year for years 6-10. Draw the cash flow diagram. What is the future value (in year 10) of the income? (show steps and calculations)
A contractor was doing the 10-year planning for a construction business, which uses a MARR of...
A contractor was doing the 10-year planning for a construction business, which uses a MARR of 15% per year. The contractor anticipates income of $150,000 per year for years 1-5, and income of $200,000 per year for years 6-10. Draw the cash flow diagram. What is the future value (in year 10) of the income?
A farmer needs to decide which type of corn he wants to plant. To decide, he...
A farmer needs to decide which type of corn he wants to plant. To decide, he plants two small test areas. After the corn has grown he compares the lengths of the cobs. He looks at 35 cobs of Type A, which had an average length of 6.3 inches with a variance of 1. He looks at 30 cobs of Type B, which had an average length of 5.9 with a variance of 1.3. Calculate a 95% confidence interval for...
Why should we hire you as a construction project Engineer on a complex, multi-phase large road...
Why should we hire you as a construction project Engineer on a complex, multi-phase large road or bridge construction project.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT