Assume that if the product requested is not in stock,
it needs to be manufactured
before the order handling can continue. In this way, an order can
never be rejected.
To manufacture a product, the required raw materials have to be
ordered. Two
preferred suppliers provide different types of raw material.
Depending on the prod-
uct to be manufactured, raw materials may be ordered from either
Supplier 1 or
Supplier 2, or from both. Once the raw materials are available, the
product can be
manufactured and the order can be confirmed. On the other hand, if
the product
is in stock, it is retrieved from the warehouse before confirming
the order. Then
the process continues normally. After confirming the order, the
shipment address is
received and the requested product is shipped while the invoice is
emitted and the
payment is received. Afterwards, the order is archived and the
process completes.
4. Models Process Map
- Diagrammatically represent your conceptual model in a form of a
process
map
- Make sure that the constructed process map is representative to
the model
contents and level of details.