Question

In: Accounting

Archer Company is a wholesaler of custom-built air-conditioning units for commercial buildings. It gathered the following...

Archer Company is a wholesaler of custom-built air-conditioning units for commercial buildings. It gathered the following monthly data relating to units shipped and total shipping expense:

Month

Units Shipped

Total Shipping Expense

January

30

$

1,800

February

60

$

2,300

March

40

$

1,700

April

50

$

2,000

May

70

$

2,300

June

80

$

2,700

July

20

$

1,200

Required: Using the high-low method, calculate the equation of a cost line for the shipping expense for this company (Y = a + bX)

Solutions

Expert Solution

Solution

Y= $ 700 + $25 X

Working

$ 700 is the fixed cost and $25 per unit is variable cost as calculated below

Cost No. of activities
A High Level $             2,700.00 80
B Low Level $             1,200.00 20
C=A-B Difference $             1,500.00                              60
A Cost difference $             1,500.00
B No. of activities difference 60
C=A/B Variable cost per unit $                   25.00
High Level Low Level
A No. of activities 80 20
B Variable cost per unit $              25.0000 $               25.0000
C=AxB Total Variable cost $             2,000.00 $                  500.00
D Total cost $             2,700.00 $              1,200.00
E=D-C Total fixed cost $                700.00 $                  700.00

Related Solutions

Arctic Air Inc. manufactures cooling units for commercial buildings. The price and cost of goods sold...
Arctic Air Inc. manufactures cooling units for commercial buildings. The price and cost of goods sold for each unit are as follows: 1 Price per unit $60,000.00 2 Cost of goods sold 28,000.00 3 Gross profit per unit $32,000.00 In addition, the company incurs selling and administrative expenses of $226,250. The company wishes to assign these costs to its three major customers, Gough Industries, Breen Inc., and The Martin Group. These expenses are related to three major nonmanufacturing activities: customer...
Air Spares is a wholesaler that stocks engine components and test equipment for the commercial aircraft...
Air Spares is a wholesaler that stocks engine components and test equipment for the commercial aircraft industry. A new customer has placed an order for eight high-bypass turbine engines, which increase fuel economy. The variable cost is $2.5 million per unit and the credit price is $2.815 million each. Credit is extended for one period and based on historical experience, payment for about 1 out of every 100 such orders is never collected. The required return is 3.1 percent per...
Air Spares is a wholesaler that stocks engine components and test equipment for the commercial aircraft...
Air Spares is a wholesaler that stocks engine components and test equipment for the commercial aircraft industry. A new customer has placed an order for eight high-bypass turbine engines, which is fuel economy. The variable cost is 1.6 million per unit, and the credit price is 1.725 million each. Credit is extended for one period, and based on historical experience, payment for about 1 out of 200 such orders is never collected. The required rate of return is 1.8 percent...
Air spaces is a wholesaler that stocks engine components and test equipment for the commercial aircraft...
Air spaces is a wholesaler that stocks engine components and test equipment for the commercial aircraft industry. A new customer has placed an order for eight high by bass turbine engines, which increase fuel economy. The variable cost is $2.6million per unit, and the credit price is $2.815 million each. Credit is extended for one period, and based on historical experience, payment for about 1 out of every 200 such orders is never collected. The required return is 2.9 per...
The owner of Ongwedi Enterprises was approached by a local dealer in air conditioning units. The...
The owner of Ongwedi Enterprises was approached by a local dealer in air conditioning units. The dealer proposed replacing the old cooling system of Ongwedi Enterprises with a modern, more efficient system. The cost of the new system was quoted at R300 000, but it would save R62 000 per year in electricity costs. The estimated life of the new system is 10 years, with no salvage value expected. All capital projects are required to earn at least the firm’s...
Income-producing buildings built after 19 September 1987 are depreciated at 2.5% pa. A small commercial building...
Income-producing buildings built after 19 September 1987 are depreciated at 2.5% pa. A small commercial building is built after this date at a cost of $18.5 million. Use correct depreciation formulas and show full working out for your answers. (a) Find it written down value after 8 years. (b) Find its written down value after 9 years (c) What was its depreciation in the ninth year. (d) Calculate its depreciation in the 15 th year.
Crane Company has gathered the following information. Units in beginning work in process 0 Units started...
Crane Company has gathered the following information. Units in beginning work in process 0 Units started into production 37,300 Units in ending work in process 8,200 Percent complete in ending work in process:     Conversion costs 40 %     Materials 100 % Costs incurred:     Direct materials $78,330     Direct labor $66,500     Overhead $105,114 Compute equivalent units of production for materials and for conversion costs. Materials Conversion Costs The equivalent units of production Determine the unit costs of production. (Round unit costs to 2...
Baden Company has gathered the following information. Units in beginning work in process 0 Units started...
Baden Company has gathered the following information. Units in beginning work in process 0 Units started into production 40,100 Units in ending work in process 8,000 Percent complete in ending work in process:     Conversion costs 40 %     Materials 100 % Costs incurred:     Direct materials $80,200     Direct labor $61,900     Overhead $109,305 Part 1 Compute equivalent units of production for materials and for conversion costs. Materials Conversion Costs The equivalent units of production eTextbook and Media Save for Later Attempts: 0 of...
Overton Company has gathered the following information: Production: Units in beginning work in process 20,000 Units...
Overton Company has gathered the following information: Production: Units in beginning work in process 20,000 Units started into production 164,000 Units in ending work in process 24,000 Percentage complete in ending work in process: Conversion costs 60% Materials 100% Costs: Direct materials $ 101,200 Direct labor 164,800 Overhead 184,000 Instructions: to. Calculate the equivalent units of production for the material and the conversion costs. b. Determine the unit cost of production. C. Show the allocation of costs to the units...
Baden Company has gathered the following information. Units in beginning work in process 0 Units started...
Baden Company has gathered the following information. Units in beginning work in process 0 Units started into production 37,000 Units in ending work in process 7,200 Percent complete in ending work in process:     Conversion costs 40 %     Materials 100 % Costs incurred:     Direct materials $ 83,250     Direct labor $ 65,200     Overhead $ 109,638 (a) Compute equivalent units of production for materials and for conversion costs. Materials Conversion Costs The equivalent units of production (b)   Determine the unit costs of production....
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT