Question

In: Operations Management

Pieces produced per cycle: 8 Average measured cycle time: 8.36 min Average measured effort time per...

  1. Pieces produced per cycle: 8

    Average measured cycle time: 8.36 min
    Average measured effort time per cycle: 4.62 min Average rapid traverse time: 0.08 min
    Average cutting time power feed: 3.66 min Performance rating: 115 percent
    Allowance (machine time): 10 percent Allowance (effort time): 15 percent

The operator works on the job a full 8-h day and produces 380 pieces. How many stan-

dard hours does the operator earn? What is the operator’s efficiency for the 8-h day?


Solutions

Expert Solution

1. Pieces produced per cycle: 8

Average measured cycle time: 8.36 min
Average measured effort time per cycle: 4.62 min

Average rapid traverse time: 0.08 min
Average cutting time power feed: 3.66 min

Performance rating: 115 percent
Allowance (machine time): 10 percent

Allowance (effort time): 15 percent

The operator works on the job a full 8-h day and produces 380 pieces.

Solution is as follows:

Standard power feed cycle time=(cutting time + rapid traverse time)*1*1.10 (allowance)

= (3.66+0.08)*1*1.10

=4.114 minutes

Standard manual cycle time=(average cycle time-(cutting time + rapid traverse time))*1.15*1.15 (allowance)

=(8.36-3.74) *1.15*1.15

=6.110 minutes

Standard time=standard power feed cycle time + standard manual cycle time

=4.114 minutes+6.110 minutes

=10.224 minutes

Standard piece time=Standard time/ pieces produced per cycle

=10.224 minutes/8 pieces

=1.278 minutes

How many standard hours does the operator earn?

Standard hour earned=standard piece time x pieces produced/60 minutes

=1.278 x 380/60

=8.094

What is the operator’s efficiency for the 8-day?

Efficiency=standard hour earned/ number of days

=8.094/8


Related Solutions

Average Daily TV Viewing Time Per U.S. Household Year Hours Min Total Min 1950 4 39...
Average Daily TV Viewing Time Per U.S. Household Year Hours Min Total Min 1950 4 39 279 1955 5 5         305 1960 5 33         333 1965 6 4         364 1970 6 38 398 1975 7 7         427 1980 7 45 465 1985 8 22 502 1990 8 7 487 1995 8 38         518 2000 9 2 542 2005 9 30 570 2010 9 41 581 Click here for the Excel Data File (a) Fit a...
An engineer measured the Brinnel hardness of 25 pieces of ductile iron. The average hardness was...
An engineer measured the Brinnel hardness of 25 pieces of ductile iron. The average hardness was 172.52. The population standard deviation of Brinnel Hardness of ductile iron is 10.31. The engineer hypothesized the the mean Brinnel hardness of such ductile pieces is greater than 170. Test this hypothesis for a = 0.05.
The average playing time of compact discs in a large collection is 37 min, and the...
The average playing time of compact discs in a large collection is 37 min, and the standard deviation is 2 min. (a) What value is 1 standard deviation above the mean? 1 standard deviation below the mean? What values are 2 standard deviations away from the mean? 1 standard deviation above the mean 1 standard deviation below the mean 2 standard deviation above the mean 2 standard deviation below the mean (b) Without assuming anything about the distribution of times,...
The average playing time of compact discs in a large collection is 37 min, and the...
The average playing time of compact discs in a large collection is 37 min, and the standard deviation is 5 min. (a) What value is 1 standard deviation above the mean? 1 standard deviation below the mean? What values are 2 standard deviations away from the mean? 1 standard deviation above the mean ___ 1 standard deviation below the mean ____ 2 standard deviation above the mean ____ 2 standard deviation below the mean _____ (b) Without assuming anything about...
The following data resulted from a study taken on a horizontal milling machine: Pieces produced per...
The following data resulted from a study taken on a horizontal milling machine: Pieces produced per cycle: 8. Average measured cycle time: 8.36 minutes. Average measured effort time per cycle: 4.62 minutes. Average rapid traverse time: 0.08 minutes. Average cutting time power feed: 3.66 minutes. Performance rating: 115 percent. Allowance (machine time): 10 percent. Allowance (manual time): 15 percent. The operator works on the job a full eight-hour day and produces 380 pieces. How many standard hours does the operator...
The average stopping distances for a population of school buses traveling 50 miles per hour, measured...
The average stopping distances for a population of school buses traveling 50 miles per hour, measured in feet, are normally distributed, with a standard deviation of 6 feet. Using a random sample of 23 buses having a sample mean of 262 feet, construct a 95% confidence interval for the mean stopping distance of the population.
A chemical process has produced, on the average, 800 tons of chemicals per day. The daily...
A chemical process has produced, on the average, 800 tons of chemicals per day. The daily yields for the past week are 785, 805, 790, 793, and 802 tons. The sample standard deviation is s = 8.34. (a) Do these data indicate that the average yield is less than 800 tons? Formulate and test an appropriate hypothesis using α=0.05. (b) Find the bounds on the p-value for this test.
A chemical process has produced, on the average, 800 tons of chemicals per day. The daily...
A chemical process has produced, on the average, 800 tons of chemicals per day. The daily yields for the past week are 785, 805, 790, 793, and 802 tons. The sample standard deviation is s = 8.34. (a) Do these data indicate that the average yield is less than 800 tons? Formulate and test an appropriate hypothesis using α=0.05. (b) Find the bounds on the p-value for this test.
Suppose the price is set by the market at $8 per unit. If the Average Total...
Suppose the price is set by the market at $8 per unit. If the Average Total Cost for the average perfectly competitive firm in the market is $10,       Is the average firm showing a profit, loss, or breaking even?       Given your response in part A., are more firms likely to enter the market, or are firms likely to exit the market? Why?       Thus, what happens to the market price? What is the long-run scenario in a perfectly...
A worker-machine operation was found to involve 4.6 minutes of machine time per cycle in the...
A worker-machine operation was found to involve 4.6 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker’s time averaged 3.1 minutes per cycle, and the worker was given a rating of 121 percent (machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance percentage of 13 percent of work time which is applied only to the worker element (not the machine element), determine...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT