In: Operations Management
Pieces produced per cycle: 8
Average measured cycle time: 8.36 min
Average measured effort time per cycle: 4.62 min Average rapid
traverse time: 0.08 min
Average cutting time power feed: 3.66 min Performance rating: 115
percent
Allowance (machine time): 10 percent Allowance (effort time): 15
percent
The operator works on the job a full 8-h day and produces 380 pieces. How many stan-
dard hours does the operator earn? What is the operator’s efficiency for the 8-h day?
1.
Pieces produced per cycle:
8
Average measured cycle time:
8.36 min
Average measured effort time per cycle: 4.62
min
Average rapid traverse
time: 0.08 min
Average cutting time power
feed: 3.66 min
Performance rating: 115
percent
Allowance (machine time): 10
percent
Allowance (effort time): 15 percent
The operator works on the job a full 8-h day and produces 380 pieces.
Solution is as follows:
Standard power feed cycle time=(cutting time + rapid traverse time)*1*1.10 (allowance)
= (3.66+0.08)*1*1.10
=4.114 minutes
Standard manual cycle time=(average cycle time-(cutting time + rapid traverse time))*1.15*1.15 (allowance)
=(8.36-3.74) *1.15*1.15
=6.110 minutes
Standard time=standard power feed cycle time + standard manual cycle time
=4.114 minutes+6.110 minutes
=10.224 minutes
Standard piece time=Standard time/ pieces produced per cycle
=10.224 minutes/8 pieces
=1.278 minutes
How many standard hours does the operator earn?
Standard hour earned=standard piece time x pieces produced/60 minutes
=1.278 x 380/60
=8.094
What is the operator’s efficiency for the 8-day?
Efficiency=standard hour earned/ number of days
=8.094/8