Question

In: Physics

NDT Liquid Penetrante Testing What control measures should be considered in developer thickness layer?

NDT Liquid Penetrante Testing

What control measures should be considered in developer thickness layer?

Solutions

Expert Solution

in a penetrant inspection function of developer is very important.

(1) It must draw out of the discontinuity a sufficient amount of penetrant to form an indication, and it must spread the penetrant out on the surface to produce a visible indication.

(2)In a fluorescent penetrant inspection, the amount of penetrant brought to the surface must exceed the dye's thin film threshold of fluorescence, otherwise the indication will not fluoresce and also the developer makes fluorescent indications appear brighter than indications produced with the same amount of dye but without the developer.

(c)for accomplishing these functions, a developer should stick to the part surface and result in a uniform, highly porous layer with many paths for the penetrant to be moved due to capillary action.

(d)Developers can either beapplied wet or dry, but the desired end result is always a uniform, highly porous, surface layer. the quality control requirements for each of the developerlayer types might be is slightly different, they will be covered individually.


Related Solutions

What factors and measures should be considered in assigning the materiality of a misstatement in the...
What factors and measures should be considered in assigning the materiality of a misstatement in the presentation of a financial statement?
From the discussion above, which layer (aqueous or organic) of a liquid-liquid extraction should contain the...
From the discussion above, which layer (aqueous or organic) of a liquid-liquid extraction should contain the ammonium salt of an organic compound, and why? Describe the procedure you would use in the laboratory to determine which layer is organic and which layer is aqueous. (Assume you do not have access to physical constants for the solvents being used.) What is the purpose of adding anhydrous sodium sulfate into an organic layer that results from a liquid-liquid extraction? If a mixture...
A process considered to be in control measures an ingredient in ounces. A quality inspector took...
A process considered to be in control measures an ingredient in ounces. A quality inspector took 10 samples, each with 5 observations as follows: Samples Observations 1 2 3 4 5 1 10 9 10 9 12 2 9 9 11 11 10 3 13 9 10 10 9 4 10 10 11 10 10 5 12 10 9 11 10 6 10 10 8 12 9 7 10 11 10 8 9 8 13 10 8 10 8 9...
Question: What is Control Measures? Explain 5 types of control measures with examples
Question: What is Control Measures? Explain 5 types of control measures with examples
Provide five examples of common business risks faced by companies and what control measures should be...
Provide five examples of common business risks faced by companies and what control measures should be taken to minimize each business risk.
What professional responsibilities does a software developer have with respect to the testing and documentation of...
What professional responsibilities does a software developer have with respect to the testing and documentation of code that he/she develops?
What professional responsibilities does a software developer have with respect to the testing and documentation of...
What professional responsibilities does a software developer have with respect to the testing and documentation of code that he/she develops? And Which aspects of testing and documentation would a developer normally not be involved in? Explain your answer.
Describe what is considered a Layer 1 WAN Technology, mention the names of the 4 better...
Describe what is considered a Layer 1 WAN Technology, mention the names of the 4 better known technologies, and give one characteristic for each. Describe what is considered Layer 2 WAN technologies, mention the names of the 3 better known technologies, and give one characteristic for each.
The following materials should be considered in the control/monitor part of a marketing plan:- Feedback mechanism...
The following materials should be considered in the control/monitor part of a marketing plan:- Feedback mechanism to monitor progress - Evaluation process - Performance objectives (quantifiable elements) - Profit margin - Market share - Promotional effectiveness - Market penetration How these are analyzed in the case of a pizza company
What is the Transport Layer and what does it do?   (Please explain flow control, error management,...
What is the Transport Layer and what does it do?   (Please explain flow control, error management, and segmentation and reassembly in the Transport Layer)
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT