In: Accounting
ackpot Mining Company
operates a copper mine in central Montana. The company paid
$1,550,000 in 2018 for the mining site and spent an additional
$710,000 to prepare the mine for extraction of the copper. After
the copper is extracted in approximately four years, the company is
required to restore the land to its original condition, including
repaving of roads and replacing a greenbelt. The company has
provided the following three cash flow possibilities for the
restoration costs (FV of $1, PV of $1, FVA of $1, PVA of $1, FVAD
of $1 and PVAD of $1) (Use appropriate factor(s) from the
tables provided.):
Cash Outflow | Probability | |||
1 | $ | 410,000 | 25% | |
2 | 510,000 | 40% | ||
3 | 710,000 | 35% | ||
To aid extraction, Jackpot purchased some new equipment on July 1,
2018, for $249,000. After the copper is removed from this mine, the
equipment will be sold for an estimated residual amount of $27,000.
There will be no residual value for the copper mine. The
credit-adjusted risk-free rate of interest is 10%.
The company expects to extract 11.1 million pounds of copper from
the mine. Actual production was 2.7 million pounds in 2018 and 4.1
million pounds in 2019.
Required:
1. Compute depletion and depreciation on the mine
and mining equipment for 2018 and 2019. The units-of-production
method is used to calculate depreciation. (The expected
format for rounding is presented in the appropriate rows of the
table. Round your final answers to nearest whole
dollar.)
|
Computation of depletion and depreciation on the mine and mine equipment for 2018 and 2019 | |||||
Restoration Costs | Cash Outflow | Probability | Probable Restoration Costs | ||
Possibility 1 | 410000 | 25% | 102500 | ||
Possibility 2 | 510000 | 40% | 204000 | ||
Possibility 3 | 710000 | 35% | 248500 | ||
Probable Restoration Cost | 555000 | ||||
Table or Calculator function (n=4,1=10%) | [1/(1+.1)^4] | 0.6830135 | |||
Present Value of probable Restoration Cost | 379072 | ||||
Cost of Copper Mine | |||||
Mining Site | 1550000 | ||||
Development Cost | 710000 | ||||
Restoration Cost | 379072 | ||||
Cost of Copper Mine | 2639072 | ||||
Depletion Expense-Mine | 2018 | 2019 | |||
Depletion per pound | 2639072/11000000 | 2639072/11000000 | |||
A | 0.24 | 0.24 | |||
Pounds Extracted-B | 2700000 | 4100000 | |||
Depreciation Exp-A*B | 648000 | 984000 | |||
Depreciation Exp(Equipment) | 2018 | 2019 | |||
Depreciation per pound-A | (249000-27000)/11000000 | (249000-27000)/11000000 | |||
0.02 | 0.02 | ||||
Pounds Extracted-B | 2700000 | 4100000 | |||
Depreciation Expense-A*B | 54000 | 82000 |