jhmjhhjjhbus 5 is
a
Combined Cycle Gas Turbine (CCGT) power plant beside the sea
, built on a
vast area next to a rural/ village setting. The fishing vil
lage houses a community of about 1300
people who live on a day-
to
-day simple livelihood. Discuss the positive and negative impac
t of
the power plant on the environment and culture of this community. Generator bus 5 is
a
Combined Cycle Gas Turbine (CCGT) power plant beside the sea
, built on a
vast area next to a rural/ village setting. The fishing vil
lage houses a community of about 1300
people who live on a day-
to
-day simple livelihood. Discuss the positive and negative impac
t of
the power plant on the environment and culture of this community.
Generator bus 5 is
a
Combined Cycle Gas Turbine (CCGT) power plant beside the sea
, built on a
vast area next to a rural/ village setting. The fishing vil
lage houses a community of about 1300
people who live on a day-
to
-day simple livelihood. Discuss the positive and negative impac
t of
the power plant on the environment and culture of this community.
Generator bus 5 is
a
Combined Cycle Gas Turbine (CCGT) power plant beside the sea
, built on a
vast area next to a rural/ village setting. The fishing vil
lage houses a community of about 1300
people who live on a day-
to
-day simple livelihood. Discuss the positive and negative impac
t of
the power plant on the environment and culture of this community.
In: Electrical Engineering
how would i create a bandpass filter in simulink with certain poles and zeros?
In: Electrical Engineering
Q1. We have a controller, and every time the Operator changes the Set Point, the controller responds, and gets the process sorted out. Now, somewhere, we have read that load disturbances needed to be considered in processes, as well. How will this controller react, if there is a load disturbance, and not a Set Point change?
Q3. The Process Variable jumps around, quite a bit. Which of the PID settings should we not be using, to improve controllability, and extend the life of our Final Control Element?
In: Electrical Engineering
what the propagation delay can be on a synchronous and an asynchronous counter that needs to run at 200MHz? Show me how you would calculate this.
In: Electrical Engineering
Consider the user-defined MATLAB function below,
ht_mp_ch().
The function ht_mp_ch(), outputs the sampled version of the impulse
response hmp(t) of the multipath fading channel as a
vector.
function
impulse_response=ht_mp_ch(max_delay,L,decay_base,t_step)
t_vector=0:t_step:max_delay;
mp_tmp=0*(t_vector);
path_delays=[0 sort(rand(1,L-1)*max_delay)];
impulse_positions=floor(path_delays/t_step);
mp_tmp(impulse_positions+1)=exp(j*2*pi*rand(1,L));
mp_tmp=mp_tmp.*(decay_base.^(t_vector/max_delay));
impulse_response=mp_tmp/sqrt(sum(abs(mp_tmp).^2));
Explain what the variable on the left-hand side represents and
justify how the right-hand side expression is formulated by adding
comments to every line.
In: Electrical Engineering
bus reservation system code using c language in this system we can add seat and remove. this code will be in c language using 2 d aray
In: Electrical Engineering
Explain the major pros and cons of mechanical power conditioning used by large scale wind turbines and the electrical conditioning used by smaller turbines ?
In: Electrical Engineering
You have a plan to build a games console controller that captures the hand gestures of the player. The player’s movements and gestures are sensed using an accelerometer connected to one of the ADC pins of an Arduino. You have already written all the necessary code but have yet to include any kind of smoothing for the accelerometer signal.
Your task now is to write the accelerometer smoothing function. The function must take each new sample as input and return the average of 4 consecutive samples without introducing a significant lag. (Hint: use a moving average.)
Write an implementation of this function where the function prototype is of the form:
int SmoothSensor(int sensorReading);
In: Electrical Engineering
Write a code in order to make an android application of LZ77 compression algorithm for text compression.
In: Electrical Engineering
Can someone explain to me the concept of composite DSSC solar panel?
In: Electrical Engineering
create a digital alarm clock using multisim software
In: Electrical Engineering
Write an assembly language program for 8051 microcontroller to find the sum of the following
series,
1, -2, +3, -4, +5, -6,..., up to 100 terms.
Store lower byte in R0 and higher byte in R1.
In: Electrical Engineering
NMOS and PMOS
Explain the difference between a NMOS and PMOS and plot their characteristics curves LTspice (you may use any standard MOSFET circuit). Distinguish between NMOS/PMOS and NMOS4/PMOS4.
In: Electrical Engineering
Is there any difference in any photovoltaic property by the size of solar exposure area?
In: Electrical Engineering
1) List various types of faults occurring in generator and their consequences.
In: Electrical Engineering