Question

In: Finance

I have figured out the risk premium and average risk premium for the question below. I'm...

I have figured out the risk premium and average risk premium for the question below. I'm having trouble figuring out what the standard deviation of the risk premium is. 2006 18.67 7.50 2007 9.01 7.16 2008 −39.83 2.80 2009 30.90 0.80 2010 20.56 0.92 The average risk premium is 4.03% but can't figure out how to calculate standard deviation of the risk premium.

Yes, an excel function will do.

Thank you.

Solutions

Expert Solution

i have solved full sum for you


Related Solutions

I have figured out the first part of this question in that there is no significant...
I have figured out the first part of this question in that there is no significant difference because 1.78<2.306. But this second part is confusing to me. Can you explain the formula I need to use? Thanks .Menstrual cycle lengths (days) in an SRS of nine women are as follows: {31, 28, 26, 24, 29, 33, 25, 26, 28}. Use this data to test whether mean menstrual cycle length differs significantly from a lunar month using a one sample t-test....
I figured it out thanks
I figured it out thanks
I have figured out this assignment, but I am having a hard time figuring out the...
I have figured out this assignment, but I am having a hard time figuring out the extra credit, Thanks! Creating a Rectangle class We have created a representation of a rectangle in C++ and extended it to create multiple representation's of rectangles. Classes can simplify that process considerably. In this assignment, your task is to convert the representation of a rectangle we created earlier in the semester to a Rectangle class. The Rectangle class shall consist of the following: The...
Hi! I have a homework question I'm not sure if I'm doing it correctly. Below is...
Hi! I have a homework question I'm not sure if I'm doing it correctly. Below is the information from the question and my answer in bold. Glass Company makes glass orders based on the customer specifications, so the company uses job costing to track costs. The company uses direct labor hours as the cost driver for manufacturing overhead application. Manufacturing overhead costs for the year:        $787,500 Usage of direct labor hours for the year:               225,000 Beginning Work-in-process, March 1 (Job 57)      $80,000 Beginning...
I have figured them all out except D On average, commuters in Phoenix, Arizona, area require...
I have figured them all out except D On average, commuters in Phoenix, Arizona, area require m= 40.0 minutes to get to work.  Assume the times to get to work are normallydistributed with a standard deviation of s= 10 minutes, and that Joe is an average Phoenix resident. What is the probability that on any given day Joe will require over 45 minutes to get to work? What is the probability it will take Joe exactly40.0 minutes to get to work...
Forget it, I figured it out on my own, S&H I figured everyone new that it...
Forget it, I figured it out on my own, S&H I figured everyone new that it was Shipping and Handling or that Circ. was circulation. Question was, is it profitable at .10%? 2nd question was How many units and what is the response rate needed to Breakeven? I'm sorry I thought I had all the information and thought the question was enough to understand. Sorry if confused hope that helped. Explain how to get answers, excel would be great. Facts:...
Hi, I submitted this question before, but it wasn't actually answered. I figured out 1 and...
Hi, I submitted this question before, but it wasn't actually answered. I figured out 1 and 2, but can you try the rest? I am unsure how to solve it. TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company’s products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding...
I am currently working on creating a dice game. I have not figured out how to...
I am currently working on creating a dice game. I have not figured out how to make it work? What should I do to make it work? Here is what I have so far: <!doctype html> <html> <head> <meta charset="UTF-8"> <title>Dice Game</title> <link rel="stylesheet" type="text/css" href="dice.css"> </head> <body> <div class="row" align="center"> <div class="col-4"> <h3>Your Dice</h3> <img src="dice images/m1.png" width="100" height="100" alt="roll: 1" id="mydice1"/> <img src="dice images/m1.png" width="100" height="100" alt="roll: 1" id="mydice2"/> </div> <div class="col-4"> <h3>Opponent's Dice</h3> <img src="dice images/o1.png" width="100"...
I think I have this figured out, but need a double check... Thank you Here is...
I think I have this figured out, but need a double check... Thank you Here is the question: Regional distributors are currently using continuous review inventory policy. Compute and describe their inventory management policy and associated cost. Ignore inbound and outbound transportation cost. Provide answers and calculations for order quantity, demand during lead time, safety stock, average inventory level, inventory holding cost per week, ordering cost per week, and total cost per week. The service level is 90% and the...
I figured out the weighted average method, but can anyone show me the FIFO and LIFO...
I figured out the weighted average method, but can anyone show me the FIFO and LIFO treatment of this problem???? Timekeeper Inc. manufactures clocks on a highly automated assembly line. Its costing system uses two cost categories, direct materials and conversion costs. Each product must pass through the Assembly Department and the Testing Department. Direct materials are added at the beginning of the production process. Conversion costs are allocated evenly throughout production. Timekeeper Inc. uses weighted-average costing. Data for the...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT