Jus de Fruit Co. has set up for automated production of its new bottled Triple Berry Colada. Five samples were taken during the first week of production. The OM team wants to monitor the dispersion of the process. What chart should they use? Is the process in control?

Sample Bottle 1 Bottle 2 Bottle 3
1 20.1 20.1 19.8
2 20.0 19.1 20.0
3 19.9 20.1 19.4
4 18.0 21.8 20.5
5 20.0 19.7 20.0

Sample Size

x-bar-Charts (A2)

R-Charts (D3)

R-Charts (D4)

3

1.02

0

2.57

5

0.58

0

2.11

R-chart; No

p-chart; Yes

x-bar chart; Yes

x-bar chart; No

R-chart; Yes

Solutions

Expert Solution


Related Solutions

Set up (Do Not Evaluate) a triple integral that yields the volume of the solid that...
Set up (Do Not Evaluate) a triple integral that yields the volume of the solid that is below        the sphere x^2+y^2+z^2=8 and above the cone z^2=1/3(x^2+y^2) Rectangular coordinates        b) Cylindrical coordinates        c)   Spherical coordinates
Set up a triple integral for the volume of the solid that lies below the plane...
Set up a triple integral for the volume of the solid that lies below the plane x + 2y + 4z = 8, above the xy-plane, and in the first octant. Hint: Try graphing the region and then projecting into the xy-plane. To do this you need to know where the plane x+ 2y + 4z = 8 intersects the xy-plane (i.e. where z = 0).
A microwave manufacturing company has just switched to a new automated production system. Unfortunately, the new...
A microwave manufacturing company has just switched to a new automated production system. Unfortunately, the new machinery has been frequently failing and requiring repairs and service. The company has been able to provide its customers with a completion time of 6 days or less. To analyze whether the completion time has increased, the production manager took a sample of 36 jobs and found that the sample mean completion time was 6.5 days with a sample standard deviation of 1.5 days....
1. You are a salesperson for Bottoms Up Beverage Company and are introducing a new bottled...
1. You are a salesperson for Bottoms Up Beverage Company and are introducing a new bottled water product called Fresh-is-Best Sweetwater, sourced from the natural springs of the Great Lakes near Flint, Michigan. You are preparing to call on the GO GO! Convenience store chain in an attempt to gain authorization for Fresh-is-Best Sweetwater distribution and floor displays in all 85 of the chain’s outlets. Your regular wholesale price (to the retailer) is $16.80 per case of twenty-four 20 oz....
Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up...
Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up to produce a large run of resistors of 1,000 ohms each. Use Exhibit 10.13. To set up the machine and to create a control chart to be used throughout the run, 15 samples were taken with four resistors in each sample. The complete list of samples and their measured values are as follows: Use three-sigma control limits. *ONLY ANSWER b,c,d, e please. Thank you!*...
Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up...
Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up to produce a large run of resistors of 1,000 ohms each. Use Exhibit 10.13.      To set up the machine and to create a control chart to be used throughout the run, 15 samples were taken with four resistors in each sample. The complete list of samples and their measured values are as follows: Use three-sigma control limits. SAMPLE NUMBER READINGS (IN OHMS) 1 1000...
Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up...
Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up to produce a large run of resistors of 1,000 ohms each. Use Exhibit 10.13.      To set up the machine and to create a control chart to be used throughout the run, 15 samples were taken with four resistors in each sample. The complete list of samples and their measured values are as follows: Use three-sigma control limits. SAMPLE NUMBER READINGS (IN OHMS) 1 986...
Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up...
Resistors for electronic circuits are manufactured on a high-speed automated machine. The machine is set up to produce a large run of resistors of 1,000 ohms each. Use Exhibit 10.13.      To set up the machine and to create a control chart to be used throughout the run, 15 samples were taken with four resistors in each sample. The complete list of samples and their measured values are as follows: Use three-sigma control limits. SAMPLE NUMBER READINGS (IN OHMS) 1 1092...
Set up the triple integral of an arbitrary continuous function f(x, y, z) in spherical coordinates...
Set up the triple integral of an arbitrary continuous function f(x, y, z) in spherical coordinates over the solid shown. (Assume a = 4 and b = 8. ) f(x, y, z) dV E = 0 π/2 f  , , dρ dθ dφ 4
1a. Berry Co. purchases a patent on January 1, 2021, for $35,000 and the patent has...
1a. Berry Co. purchases a patent on January 1, 2021, for $35,000 and the patent has an expected useful life of five years with no residual value. Assuming Berry Co. uses the straight-line method, what is the amortization expensefor the year ended December 31, 2022? 1b. Kansas Enterprises purchased equipment for $75,500 on January 1, 2021. The equipment is expected to have a ten-year service life, with a residual value of $6,750 at the end of ten years. Using the...