Sydney Steelworks is engaged in a costing dispute with Public Works Canada. The company has a cost-plus contract to supply specialty steel that has no evident market price. The contract calls for Sydney to be reimbursed for its manufacturing costs plus 35%. An independent shipper hauls the steel from the Sydney plant to the various construction sites.
The variable cost of manufacturing the steel is $200 per ton, which is not in dispute. The issue concerns the allocation of fixed manufacturing costs to this product. The current annual fixed manufacturing cost at Sydney is $300,000,000. The plant is operating at 40% of practical capacity, which is measured in tons. Sydney computes the fixed manufacturing overhead rate by dividing the fixed manufacturing cost by the planned level of operations. This has resulted in charging this contract a rate of $120 per ton for fixed manufacturing costs.
Cost analysts at Public Works have objected, citing industry evidence that, on average, steel companies are using 70% of their practical capacity.
Required: