In: Civil Engineering
A culvert for a new roadway fill is to be designed for
a 25 year flood. Hydrologic
analysis results in a peak discharge of 5.66 m3
/s for this flood. The inlet invert
elevation is 30.48m, natural stream bed slope is 0.01,tailwater
depth above the outlet
invert level is 1.1m, culvert length is 60.96 m and the roadway
shoulder elevation is
33.5m. Design a concrete pipe culvert for this site. Assume that
the accepted design
practice requires a 0.61m freeboard between the water surface in
the upstream pool
and the shoulder. Also, the culvert will be a circular concrete
pipe with the square
edge with headwall