Question

In: Civil Engineering

A culvert for a new roadway fill is to be designed for a 25 year flood....

A culvert for a new roadway fill is to be designed for a 25 year flood. Hydrologic
analysis results in a peak discharge of 5.66 m3
/s for this flood. The inlet invert
elevation is 30.48m, natural stream bed slope is 0.01,tailwater depth above the outlet
invert level is 1.1m, culvert length is 60.96 m and the roadway shoulder elevation is
33.5m. Design a concrete pipe culvert for this site. Assume that the accepted design
practice requires a 0.61m freeboard between the water surface in the upstream pool
and the shoulder. Also, the culvert will be a circular concrete pipe with the square
edge with headwall

Solutions

Expert Solution


Related Solutions

A new overpass is being designed and will be crossing an existing roadway 200 feet prior...
A new overpass is being designed and will be crossing an existing roadway 200 feet prior to it’s PVI (station 120+00).   The existing roadway has grades of -4% and +5% and a sag vertical curve length of 1000 feet.   The PVC elevation is at 600 feet.   There are a significant number of trucks that use the existing roadway.   Determine the minimum elevation that then new overpass can be at as measured from the bottom of the overpass based on sight distance for trucks.   (FYI, also...
The Adams Construction Company is bidding on a project to install alarge flood drainage culvert from...
The Adams Construction Company is bidding on a project to install alarge flood drainage culvert from Dandridge to a distantlake. The cost and benefits are shown below. Use the Present Worth conventional and modified Benefit-Cost ration method to make a recommendation.Draw Cash Flow Diagram Initial investment = $2 million Right of way maintenance cost = $30,000 per year Major upkeep every six years = $50,000 Annual benefits to the taxpayers = $135,000 per year Life of the project = 12...
Describe steps for conducting the assessment of the following natural hazard (25) Risk Assessment of Flood...
Describe steps for conducting the assessment of the following natural hazard (25) Risk Assessment of Flood hazard (e.g., FEMA, USACE) Risk assessment from Climate change hazard Risk assessment from drought hazard
A machine is designed to fill containers with 16 ounces of coffee. A consumer suspects that...
A machine is designed to fill containers with 16 ounces of coffee. A consumer suspects that the machine is not filling the containers completely and the amount of coffee is less than 16 ounces when filled. A sample of 8 containers has a mean of 15.6 ounces of coffee and a standard deviation of 0.3 ounces of coffee.  Assume that the distribution of data is normal. At 10% significance level, is there enough evidence to support the consumer’s suspicion that the...
The production line for Glow toothpaste is designed to fill tubes with toothpaste. A sample of...
The production line for Glow toothpaste is designed to fill tubes with toothpaste. A sample of tubes is selected in order to check the filling process. The data is listed below At the 0.01 level of significance, is there any evidence that the mean weight of tubes is greater than 11 oz? (Hint: List the 4 steps) At the 0.05 level of significance, is there any evidence that the mean weight is less than 10 oz? (Hint: List the 4...
Conceptually describe how you would evaluate the initial grade of the new segmental culvert so that...
Conceptually describe how you would evaluate the initial grade of the new segmental culvert so that in its final condition (i.e. after all settlement is complete) it slopes with a 4% grade. The culvert will be installed prior to construction of the embankment (i.e. the embankment will be filled over the culvert).
A production line operation is designed to fill cartons with laundry detergent to a mean weight...
A production line operation is designed to fill cartons with laundry detergent to a mean weight of 64 ounces. A sample of cartons is periodically selected and weighed to determine whether underfilling or overfilling is occurring. If the sample data lead to a conclusion of underfilling or overfilling, the production line will be shut down and adjusted to obtain proper filling. (a) Formulate the null and alternative hypotheses that will help in deciding whether to shut down and adjust the...
A highway construction company is under contract to build a new roadway through a scenic area...
A highway construction company is under contract to build a new roadway through a scenic area and two rural towns in Colorado. The road is expected to cost $18,000,000, with annual upkeep estimated at $150,000 per year. Additional income from tourist (Benefits) of $900,000 per year is estimated. The road is expected to have a useful commercial life of 20 years. Determine if the highway should be constructed at a discount rate of 6% per year, applying the Conventional B/C...
A highway construction company is under contract to build a new roadway through a scenic area...
A highway construction company is under contract to build a new roadway through a scenic area and two rural towns in Colorado. The road is expected to cost $18,000,000, with annual upkeep estimated at $150,000 per year. Additional income from tourist (Benefits) of $900,000 per year is estimated. The road is expected to have a useful commercial life of 20 years. Determine if the highway should be constructed at a discount rate of 6% per year, applying the Conventional B/C...
A machine is designed to fill 16-ounce bottles of shampoo. When the machine is working properly,...
A machine is designed to fill 16-ounce bottles of shampoo. When the machine is working properly, the mean amount poured into the bottles is 16.05 ounces with a standard deviation of .005 ounces. If four bottles are randomly selected each hour and the number of ounces in each bottle is measured, then 95% of the observations should occur in what interval? Round answers to four decimal places.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT