Question

In: Civil Engineering

Scenario : Middle School Building Project: The new middle school building includes classrooms, offices and administrative...

Scenario :
Middle School Building Project: The new middle school building includes classrooms, offices and administrative spaces, dining commons with kitchen, and media center. Additional spaces that may be part of the final design include auditorium, gymnasium and athletic fields.
Building construction may consist of a multi-story masonry and steel load bearing building with elevated slabs, poured in-place concrete retaining walls and associated underground waterproofing. Exterior finish materials may include brick veneer, aluminum storefront and curtain wall, and aluminum composite wall panels. Interior finish materials may include masonry and drywall partitions, brick veneer, cementitious terrazzo flooring, VCT and carpet tile, and lay-in acoustical tile ceiling. Roofing systems include TPO single ply roof system or standing seam metal roofing system. Building systems include forced air mechanical systems, plumbing, fire protection, electrical, communications, security and data systems.
Site construction consists of work on approximately 20 acres, including erosion and sediment control measures, clearing and grubbing, storm water piping and retention ponds, building pad preparation, utilities including a forced main sanitary system, temporary and permanent parking areas and driveways, bus loop, concrete walks, areas of concrete, fencing and other miscellaneous site work.

What needs to be done:
Construct a critical path method for an architect only

Solutions

Expert Solution

CPM or the critical path method is used in the project planning and scheduling stage of a any project. Its' widely used in construction project as a detailing tool.

The CPM for the above mentioned project is given below. As the detailed project with quantities and time duration is not give, the below CPM is formed based on the list of activities that forms the above project. The common activities such as the construction of load bearing columns, exteriors, interiors and clubbed together and mentioned in the CPM drawing. The activity duration are assumed for a construction project and is shown in the drawing. Some of the activities may overlap or carried out side by side and such activities are given in the schedule with overlapping time schedules.

The CPM constructed for the middle school building project is given below:


Related Solutions

The administrative offices and manufacturing plant of Billings Tool & Die share the same building. The...
The administrative offices and manufacturing plant of Billings Tool & Die share the same building. The following information (in $000s) appears in the accounting records for last year:    Administrative costs $ 1,659 Building and machine depreciation (75% of this amount is for factory) 1,000 Building utilities (90% of this amount is for factory) 1,220 Direct labor 845 Direct materials inventory, December 31 13 Direct materials inventory, January 1 14 Direct materials purchases 3,660 Factory supervision 489 Finished goods inventory,...
The administrative offices and manufacturing plant of Billings Tool & Die share the same building. The...
The administrative offices and manufacturing plant of Billings Tool & Die share the same building. The following information (in $000s) appears in the accounting records for last year:    Administrative costs $ 1,658 Building and machine depreciation (75% of this amount is for factory) 900 Building utilities (90% of this amount is for factory) 1,310 Direct labor 845 Direct materials inventory, December 31 14 Direct materials inventory, January 1 10 Direct materials purchases 3,630 Factory supervision 481 Finished goods inventory,...
The administrative offices and manufacturing plant of Billings Tool & Die share the same building. The...
The administrative offices and manufacturing plant of Billings Tool & Die share the same building. The following information (in $000s) appears in the accounting records for last year:    Administrative costs $ 1,653 Building and machine depreciation (75% of this amount is for factory) 800 Building utilities (90% of this amount is for factory) 1,310 Direct labor 835 Direct materials inventory, December 31 16 Direct materials inventory, January 1 10 Direct materials purchases 3,640 Factory supervision 495 Finished goods inventory,...
The administrative offices and manufacturing plant of Billings Tool & Die share the same building. The...
The administrative offices and manufacturing plant of Billings Tool & Die share the same building. The following information (in $000s) appears in the accounting records for last year:    Administrative costs $ 1,647 Building and machine depreciation (75% of this amount is for factory) 900 Building utilities (90% of this amount is for factory) 1,350 Direct labor 855 Direct materials inventory, December 31 14 Direct materials inventory, January 1 13 Direct materials purchases 3,640 Factory supervision 478 Finished goods inventory,...
Scenario: You are the project manager responsible for a new building construction in northern Virginia. The...
Scenario: You are the project manager responsible for a new building construction in northern Virginia. The building is worth $500,000 and will have five bedrooms, a kitchen, landscaping, and a two-car garage to be completed in two years. This was agreed upon in a firm fixed contract. During the execution (construction) of the building, you realize that the cost of materials have gone up by 10%, and your schedule is behind by 90 days due to delays from county inspections...
Case Study--Sarah CASE SCENARIO You are one of the school counselors at Northwest Middle School. Your...
Case Study--Sarah CASE SCENARIO You are one of the school counselors at Northwest Middle School. Your caseload includes Sarah, a seventh grader. She was referred to you by her classroom teacher. The teacher has concerns regarding Sarah due to Sarah’s recent change in behavior. Historically, Sarah has been a top student and is very outgoing. Sarah is a member of honor society, plays JV basketball, and is a member of the Drama team. Upon her return from Winter break, Sarah...
Draw a Gantt chart for A Computerised Administrative System. It Is a new project for a...
Draw a Gantt chart for A Computerised Administrative System. It Is a new project for a computerised Human Resource Information system. The company is switching to paper less. A WBS has to be created/invented for the new project
Do an order of magnitude estimate for building a new catalytic cracking plant in the Middle...
Do an order of magnitude estimate for building a new catalytic cracking plant in the Middle East with a capacity of 5000 metric tons/year in 2016.
. A school is interested to see if building a new and bigger library would be...
. A school is interested to see if building a new and bigger library would be something students would want, as the current library is very small and has limited seating. Over the past 5 yrs there are an averaged of µ=100 students per day that visit the library but the standard deviation is unknown. The student population from out of town has increased and therefore the researcher feels it is likely that more students are frequenting the library to study...
Scenario 2: Administrative Agencies and Ethics Brian Day is the vice president of new technology development...
Scenario 2: Administrative Agencies and Ethics Brian Day is the vice president of new technology development at Future Electronics in Southaven Mississippi. One year ago, he filed an application with the Federal Communications Commission to obtain approval for a new device using satellite technology. Brian met Jenice Brown at an electronics convention two months ago and invited her to his room at the hotel. The two parted ways. Brown worked as the director for licensing approval of new products at...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT