The factory building manager at Delectable Delights, Jason Short, is concerned that the new contractor he hired is taking too long to replace defective lights in the factory workspace. He would like to perform a hypothesis test to determine if the replacement time for the lights under the new contractor is in fact longer than the replacement time under the previous contractor, which was 3.2 days on average. He selects a random sample of 12 service calls to replace defective lights and obtains the following times to replacement (in days). Use a significance level of 0.05.

6.2       7.1       5.4       5.5       7.5       2.6       4.3       2.9       3.7       0.7       5.6       1.7

Define μ in the context of the problem and state the appropriate hypotheses. (5 pts)

Regardless of your results in Part B, calculate the appropriate test statistic by hand. Write out all your steps. (5 pts)

  1. What is your decision regarding the null hypothesis? (In other words, do you reject or fail to reject and why?) (5 pts)

Write a final concluding statement to Jason giving the results of the hypothesis test. (In other words, write the final summary statement.) (5 pts)

Solutions

Expert Solution



Related Solutions

Edward Foster is a building contractor. He and his customer have agreed that he will submit...
Edward Foster is a building contractor. He and his customer have agreed that he will submit a bill to them when he is 25 percent complete, 50 percent complete, 75 percent complete, and 100 percent complete. For example, he has a $200,000 room addition. When he has completed 25 percent, he will bill his customer $50,000. The problem occurs when he is 40 percent complete, has incurred expenses but cannot yet bill his customer. How can his revenue and expenses...
You are field manager for the general contractor on a multi-story office building under construction. The...
You are field manager for the general contractor on a multi-story office building under construction. The project has risen all 15 floors above the foundation. The roof is on and the exterior façade of the structure, consisting of alternating blue glass ribbon windows and red granite panels, has “dried in” the project many weeks ago. On the third, seventh and fifteenth floors, the executive offices located on the corners of the building have blue glass doors that lead outside to...
A building contractor is preparing a bid on a new construction project. Two other contractors will...
A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $500,000 and $700,000 B Normal probability distribution with a mean bid of $600,000 and a standard deviation of $40,000 If required, round your answers to three decimal places. If...
On March 1, 2020, Reed hired a contractor to construct a new office building. The construction...
On March 1, 2020, Reed hired a contractor to construct a new office building. The construction work commenced on April 1, 2020, and it is expected to continue through July 31, 2022, the estimated completion date. Reed made progress payments to the contractor in 2020 as follows: Date Amount April 1 $ 48,000 June 1 195,000 September 1 322,000 November 1 67,000 $632,000 As stated in A5 above, Reed took a 1-year, 9%, $225,000 construction loan to help fund the...
You are a proposal manager for a government contractor working on a huge new program. You...
You are a proposal manager for a government contractor working on a huge new program. You have an interview with an former employee of your main competitor who wants you to hire him. He happens to mention that when he left his former employer, he still had the entire text of their proposal for the same program on his laptop. If you have this information, it will give you a huge advantage in the competition. What do you do? And...
A contractor desires to build new homes with fireplaces. He reads in a survey that more...
A contractor desires to build new homes with fireplaces. He reads in a survey that more than 80% of all homes buyers want a fireplace. To test this claim, he selected a sample of 30 home buyers and found that 20 wanted a fire place. At a= 0.05, should the claim be rejected? a. sate the null and alternatives hypothesis and identify the claim b. calculate the value of test statistics c. find the critical value make a decision about...
Jason is saving for a new TV. He currently has $2,200 in his account that earns...
Jason is saving for a new TV. He currently has $2,200 in his account that earns 3%, compounded monthly, and the new TV costs $5,500. Assuming Jason deposits $100 in his account each month, how many months until his account has enough money to purchase the new TV? Group of answer choices 33 months. 24 months. 31 months. 29 months.
You are the project manager responsible for a new building construction in northern Virginia. The building...
You are the project manager responsible for a new building construction in northern Virginia. The building is worth $500,000 and will have five bedrooms, a kitchen, landscaping, and a two-car garage to be completed in two years. This was agreed upon in a firm fixed contract. During the execution (construction) of the building, you realize that the cost of materials have gone up by 10%, and your schedule is behind by 90 days due to delays from county inspections and...
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two...
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $530,000 and $730,000 B Normal probability distribution with a mean bid of $630,000 and a standard deviation of $43,000 If required, round your answers to three...
The factory manager estimates that P2,500,000 will be needed in 73/2 years. He decides
The factory manager estimates that P2,500,000 will be needed in 73/2 years. He decides that the factory should anvest a sum every 6 months in a fund. Interest is earned at 6% converted semi-annually.a. How much is the semiannual investment?b. How much will be in the fund after the 12th deposit?c. How much interest is earned on the 6th deposit date?d. How mach will the fund increase be on the 11th deposit date?e. Construct the first 4 lines of the...