Question

In: Advanced Math

Hexadecimal digits are 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, A, B, C,...

Hexadecimal digits are 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, A, B, C, D, E, and F.

  1. How many hexadecimal strings of length twelve have five A’s and five B’s?
  1. How many hexadecimal strings of length twelve have at most three E’s?
  1. How many hexadecimal strings of length twelve have exactly three A’s and at least two B’s?

  1. How many hexadecimal strings of length twelve have exactly two A’s and exactly two B’s, so that the two B’s are sandwiched between the A’s? 00A0 B8B8 111A is an example of such string.

  1. How many hexadecimal strings of length twelve have six digits from the set 0, 1, 2, 3, 4, 5, 6, 7, 8, 9 and six digits from the set A, B, C, D, E, F? No repetition is allowed.

  1. How many hexadecimal strings of length twelve have four digits from the set 0, 1, 2, 3, 4, 5, four digits from the set 6, 7, 8, 9, A and four digits from the set B, C, D, E, F?

  1. How many hexadecimal strings of length twelve have at least three distinct digits?
  1. How many hexadecimal strings of length twelve, have the sum of all digits equal to 30? Allowed digits are 2, 3,..., 9

Solutions

Expert Solution


Related Solutions

a = [3, -4, 7] b = [-6, 9, 8] c = [4, 0, 8] d...
a = [3, -4, 7] b = [-6, 9, 8] c = [4, 0, 8] d =[7, 1, 7] e = [3, -5, 2, 1] f =[5, -7, -3, 6] g = [3, -4, 4, 3] P = Projection of ex. C = |g|(gf/gf) C = gf/|f| ex. P g --> f = Cgf = C(gf/f) (1/|f|) (f) =( gf/ff)(f) Find a. Pg --> f b. Pa --> 3b + e Find (cross multiply) a. ||a X b|| b. ||g...
x 2 8 5 9 4 3 9 6 7 8 y 3 6 5 7...
x 2 8 5 9 4 3 9 6 7 8 y 3 6 5 7 9 7 4 6 9 9 -5.48x + 0.17 5.48x + 0.17 -0.17x + 5.48 0.17x + 5.48
A = [4, 5, 9] B = [-4, 5, -7] C = [2, -7, -8, 5]...
A = [4, 5, 9] B = [-4, 5, -7] C = [2, -7, -8, 5] D = [1, -9, 5, -3] E = [3, 3, -1] Uz = 1/|z| ^z d(X,Y) = (Rθ) d = diameter R = Radius θ = Theta Find a. Uc b. d (D, C) c. Let P = B + 3E, UP = d. A x B e. 3B x E f. C x D
Recall that hexadecimal numbers are constructed using the 16 digits 0, 1, 2, 3, 4, 5,...
Recall that hexadecimal numbers are constructed using the 16 digits 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, A, B, C, D, E, F. (a) How many strings of hexadecimal digits consist of from one through four digits? (b) How many strings of hexadecimal digits consist of from two through five digits?
1. Evaluate: (a+b)/(c-d) + 9/(a+d) when a=5, b=3, c=8, d=4 a. 6 b. 3 c. 15/2...
1. Evaluate: (a+b)/(c-d) + 9/(a+d) when a=5, b=3, c=8, d=4 a. 6 b. 3 c. 15/2 d. 17/13 2. Solve for x: 5(x+3) = 35 a. 2 b. 7 c. 4 d. -4 3. Acid rain occurs primarily as a result of a. operating a nuclear power plant b. burning coal or oil containing sulfur c. by-products created by operating an oil refinery d. the use of Freon and other refrigerants 4. The "ozone holes" at the polar region arise...
A = (1 −7 5 0 0 10 8 2 2 4 10 3 −4 8...
A = (1 −7 5 0 0 10 8 2 2 4 10 3 −4 8 −9 6) (1) Count the number of rows that contain negative components. (2) Obtain the inverse of A and count the number of columns that contain even number of positive components. (3) Assign column names (a,b,c,d) to the columns of A. (4) Transform the matrix A into a vector object a by stacking rows. (5) Replace the diagonal components of A with (0,0,2,3). Hint:...
Period   0 1 2 3 4 5 6 7 8 9 10 11 PBP NPV IRR...
Period   0 1 2 3 4 5 6 7 8 9 10 11 PBP NPV IRR Project A $                       (1,000,000) $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 400,000 Project B $                       (1,000,000) $ 500,000 $ 500,000 $ 500,000 Project C $                             (80,000) $      1,040 $      9,456 $    11,405 $    18,567 $    47,453 $      6,394 $    45,727 $    51,933 $    85,625 Project D $                           (400,000) $      4,161...
Input Data Month 0 1 2 3 4 5 6 7 8 9 10 11 12...
Input Data Month 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Revenue $             -   $            -   $            -   $        -   $        -   $         -   $    2,500 $    2,875 $    3,306 $    3,802 $    4,373 $    5,028 $    5,783 $    6,650 $    7,648 $      8,795 $   10,114 $   11,631 $   13,376 $   15,382 $   17,689 $   20,343 $   23,394 $   26,903 Monthly Revenue Growth...
Input Data Month 0 1 2 3 4 5 6 7 8 9 10 11 12...
Input Data Month 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Revenue $             -   $            -   $            -   $        -   $        -   $         -   $    2,500 $    2,875 $    3,306 $    3,802 $    4,373 $    5,028 $    5,783 $    6,650 $    7,648 $      8,795 $   10,114 $   11,631 $   13,376 $   15,382 $   17,689 $   20,343 $   23,394 $   26,903 Monthly Revenue Growth...
Period   0 1 2 3 4 5 6 7 8 9 10 11 PBP NPV IRR...
Period   0 1 2 3 4 5 6 7 8 9 10 11 PBP NPV IRR Project A $                       (1,000,000) $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 400,000 Project B $                       (1,000,000) $ 500,000 $ 500,000 $ 500,000 Project C $                             (80,000) $      1,040 $      9,456 $    11,405 $    18,567 $    47,453 $      6,394 $    45,727 $    51,933 $    85,625 Project D $                           (400,000) $      4,161...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT