Question

In: Civil Engineering

Please develop at least five design notes to be provided in the construction drawing for cast-in-place...

Please develop at least five design notes to be provided in the construction drawing for cast-in-place reinforced concrete piles without permanent casing

Solutions

Expert Solution

Five design notes to be provided in the construction drawing for cast-in-place reinforced concrete piles without permanent casing are as follows :-

  • The internal dia of the housing (casing) must not be less than the diameter of the specified pile and the straightness tolerance of any portion and of the entire length must be 1/100 of the length.
  • The size and quality of the casing must be adequate to withstand all possible stresses to which it will be subjected during handling and construction, including preventing compression or grounding of the concrete inside the pile shaft and moving from each other.
  • The casing will be manufactured in lengths that allow the casing to be extended if the ground conditions so require.
  • Casing must be of uniform cross-section and without internal protrusions and with built-in concrete which can avoid the adequate formation of piles. The seals on the casing must be reasonably tight.
  • If temporary casing is needed to stabilize the bore hole, it will extend beyond the unstable layers for a meter or more to prevent dirt and cavities from entering the surrounding soil.

Related Solutions

Please name the RMS Specification of construction of cast-in-place reinforced concrete piles without permanent casing. (200-250...
Please name the RMS Specification of construction of cast-in-place reinforced concrete piles without permanent casing. (200-250 words)
5. Design a cast iron flywheel for a four stroke cycle engine to develop 110 kW...
5. Design a cast iron flywheel for a four stroke cycle engine to develop 110 kW at 150 r.p.m. The work done in the power stroke is 1.3 times the average work done during the whole cycle. Take the mean diameter of the flywheel as 3 metres. The total fluctuation of speed is limited to 5 per cent of the mean speed. The material density is 7250 kg / m3. The permissible shear stress for the shaft material is 40...
Please design a service concept. By doing this ; - profile processing - Drawing operations and...
Please design a service concept. By doing this ; - profile processing - Drawing operations and processes - Variety versus volume segmantation -Emotions etc. are the frameworks that can be used. Combination of the above frameworks and/or the model that you find relevant
the data used in the processes at your work place, identify at least five attributes with...
the data used in the processes at your work place, identify at least five attributes with mixed types from ordinal, nominal, symmetric binary, and asymmetric binary. You may choose any combination of them, but there must be at least three types in your data chosen from the data types given above. (a) Identify the five attributes that you have chosen, their types and the possible values that these attributes may hold. In case of an ordinal variable (if you’ve chosen...
Design at least five XML documents. One of these XML is main page.
Description Design at least five XML documents. One of these XML is main page.     There are several links which link to other XML document. Each XML document has an XSLT document which transforms XML document into HTML format.
Develop a Monitoring and Evaluation Plan, including design of at least 3 key performance indicators that...
Develop a Monitoring and Evaluation Plan, including design of at least 3 key performance indicators that can be used to review and evaluate the Change Management Project Plan, and modify future similar projects to roll out this change to operating hours across all NSW Post Offices.
list construction criteria for water distribution system. design, construction and operation. from an agency. please list...
list construction criteria for water distribution system. design, construction and operation. from an agency. please list refrence hydrology. water resources
Sexual Harassment in the work place (Business Ethics) Please develop the reason of this topic. (like...
Sexual Harassment in the work place (Business Ethics) Please develop the reason of this topic. (like why) please use these reason: gender descrimination, use of power/position, sexual desire. 300 words for each one. And with some news and link. Thank you, nees it asap asap!!! Help!!!
Design a correlational study, you will need two variables with at least five sets of data....
Design a correlational study, you will need two variables with at least five sets of data. between these two variables: time spent playing video games and aggression. My question: Assume the study produces a correlation of .56 between the variables. Analyze three possible causal reasons for the relationship.
The answers previously provided are all over the place. Without Excel Please. - - Your sister...
The answers previously provided are all over the place. Without Excel Please. - - Your sister has estimated that the maintenance costs on the “slightly used” car she just purchased will be $500 in the first year. She anticipates that this cost will increase by $150 each year. She wants to set aside enough money today to cover all anticipated maintenance costs for the 10 years that she plans to own the car. How much should she deposit today in...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT