Question

In: Civil Engineering

How to calculate Traffic '' LOS '' level of services Using 'VOLUME'' I don't want to...

How to calculate Traffic '' LOS '' level of services Using 'VOLUME'' I don't want to use FFS can some 1 explain it for me please ?

and what are the information's needed ? USING volume

Solutions

Expert Solution


Related Solutions

How to calculate Traffic LOS '' Level of service '' without using FFS. I can use...
How to calculate Traffic LOS '' Level of service '' without using FFS. I can use collected volume, and how can I do that ? and what are the information's needed ?
why we don't use density,average speed,and volume to describe the intersection LOS(LEVEL OF SERVICE)
why we don't use density,average speed,and volume to describe the intersection LOS(LEVEL OF SERVICE)
I have the formulas for how to calculate ROI, Margin and Turnover. But I don't know...
I have the formulas for how to calculate ROI, Margin and Turnover. But I don't know if I am using the right numbers and it gets frustrating. A worked out calculation for each would really be helpful so I know what numbers from what years you plugged in. Your time is valuable and would really appreciate the help. If the response is correct, I would not mind giving a like! Return on Investment, Margin, Turnover Ready Electronics is facing stiff...
I don't want explanation , I just want a correct answer, Very quickly. 12- If the...
I don't want explanation , I just want a correct answer, Very quickly. 12- If the slope of the consumption function is equal to one, then Select one: a. The multiplier is undefined b. The multiplier is smaller than one c. The multiplier is just one d. The multiplier is larger than one e. None of the above 11- If the nominal interest rate 8% and expected inflation 5%, the expected real interest rate in year t is approximately Select...
a. I want to know if the percentage of traffic accidents changes by day for a...
a. I want to know if the percentage of traffic accidents changes by day for a given week in Ephraim. What type of test would I do? Group of answer choices ANOVA Chi squared GOF test b. 1 Prop Z-test Paired Sample t-test 2 Prop-Ztest b. I am interested in studying if College Major is related to living location preference (West Coast, East Coast, Non-coastal) What type of test should I do after I gather students data? Group of answer...
I want to calculate a sample size before I collect CATEGORICAL data. If I want no...
I want to calculate a sample size before I collect CATEGORICAL data. If I want no more than 3% margin of error find the sample size I would need for the following intervals. a8) 85% a9) 90% a10) 95% Repeat a8 - 10, but this time with a 5% margin of error a11) 85% a12) 90% a13) 95%
By using HCM Find the level of service LOS for the peak direction of a 2-mile...
By using HCM Find the level of service LOS for the peak direction of a 2-mile section of a rural highway with the following characteristics: • Rural, two-lane highway, Class I • Rolling terrain • Design speed = 55 mph • 12 ft travel lanes, 6 ft shoulders • 60% no-passing zones (both directions) • No access points • AADT (in design year) = 8,000 vpd • 10% trucks, 5% RVs • K = 12% • D = 55% (in...
9) An existing rural freeway in level terrain is to be analyzed to determine LOS using...
9) An existing rural freeway in level terrain is to be analyzed to determine LOS using the following information: number of lanes in each direction equals 2, peak hour volume of 2140 veh/h (in the peak direction), 15% trucks, 2% recreational vehicles, PHF = 0.90, lane width = 12 ft, lateral clearance = 10 ft, average interchange spacing is 3 mi.
I would really appreciate if you answers descriptively. I want to solutions and formulas. I don't...
I would really appreciate if you answers descriptively. I want to solutions and formulas. I don't want to any excell solutions. Thank you! Question 3. In a project, an initial investment of $8,300 equipment is expected to generate net cash inflow of $3,400, $4,000, $5,800 and $2,050 at the end of first, second, third and fourth year respectively. At the end of the fourth year, equipment would be sold for $900. Calculate the net present value of the investment if...
I want to calculate how much weight a PVC panel will support, for instance, If a...
I want to calculate how much weight a PVC panel will support, for instance, If a person were to lie on top of the panel, what is the maximum weight of the person that this panel will support, before breaking. Its thickness is 1/4th inch. It has a length of 84.5 inches and a width of 12 inches. This panel is support in both of the shorter ends by an aluminum railing.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT