In: Other
Daily demand (d) = 24
Standard deviation of demand (sigmad) = 4
Lead time (L) = 9
Expected service level = 0.92 or 92%
a.
Corresponding z value for intended service level (from the standard normal table) = 1.41
b.
Safety stock formula
SS = z*sigmad*sqrt(L)
Thus safety stock is
SS = 1.41*4*sqrt(9) = 16.92 pounds
c.
ROP formula
ROP = d*L + SS
Thus reorder point will be
ROP = 24*9 + 16.92 = 232.92 pounds