Please provide a step-by-step solution, with "Given:", "Find:", and "Solution:" format, for the problem below. Please be sure to include any tables, values, and references required to arrive at the solution you provide so that the process may be repeated for other values.
Horizontal Formwork Design
Given: 6 in structural steel-concrete floor slab. Use ¾ in Class I plyform parallel to the span for the sheathing and Southern Yellow Pine #2 for the rest of the lumber. Joists will be 2x8 and stringers will be 6x8. Unsupported height of shores will be 10 ft and they will be S4S. The maximum deflection for sheathing may be taken as 1/360 of the span. Motorized buggies will be used to transport normal weight concrete.
Find: Design the formwork for this slab.
Solution: Show all your work.